EFTA01987449.pdf

DataSet-10 1 page 138 words document
👁 1 💬 0
📄 Extracted Text (138 words)
To: jeevacationQgmail.com[jeevacation gmail.com]; Jeffrey [email protected]] Cc: Emad Hanna From: Gary Kerney Sent: Wed 7/27/2011 6:43:48 PM Subject: walls FYI Status of Island Wall construction and costs, target to be all completed by the end of sept. All our people are working on flagpole site expect to be done 1st sept. move to road turn around an walls at master done end of sept. Sub Russ $28 sq.ft.(Premium on dregee of dificulty) finished collumn wall working Sea wall done 3rd of Aug move to upper terrace done 2end week sept. Sub Tyson $25 for unpoint $35 pointed buildings Cottage exterior and assioated base end of aug Planter wall mid sept little bath exterior mid sept Sub Tyson 2end crew $25 hell wall done end of aug. All the subs need manual checks as we measure their work. EFTA_R1_00478690 EFTA01987449
ℹ️ Document Details
SHA-256
2298d1ce2d4fd11de442b566c66280eb5e5ff1945ff73edb75f592f2388027de
Bates Number
EFTA01987449
Dataset
DataSet-10
Type
document
Pages
1

Community Rating

Sign in to rate this document

📋 What Is This?

Loading…
Sign in to add a description

💬 Comments 0

Sign in to join the discussion
Loading comments…
Link copied!