750 KVA PAD MOUNTED STEP-I P TRANSFORMER
PART 1 - GENERAL
Ci SADIAPPROVfin
1.1 RELATED DOCUMENTS: APt>1-1OVED AS NOTED
A. Drawings and general provisions of the Contract apply to this Section._ r,J:D AND
RESUBMIT
for Conformation With HWY
1.2 SUMMARY: • an Corcept ni the Project and Complan00
ha In onm-Alon Given In the Contract
A. This Section includes pad mounted liquid filled step-up transformer. .J nts. C:-:::tractor is Responsible feat
m be C,or4irmed and Corrected at
that pertalriS 301011/ I
13 DEFINITIONS: riocess or to Techniques 01 I,
.• ;inn: 4nci for C natkel-Of the.•
A. NETA ATS: Acceptance Testing Specification.
1.4 SUBMITTALS:
at flS WATERAND
A. Submit with Proposal
AuTHORITY
I. A conformed specification compliance sheet that states conforms, deviation, or exception
taken to each specification section. All exceptions and deviations shall be explained.
2. Bill of Material List for transformer: Include timeframe for onsite delivery and include
warranty information.
3. Outline drawing to include: Planvicw, Elevations, Standard and optional features,
dimensions and weights.
B. Submit Within Three Weeks of Approved Order
I. Shop drawings to include complete Bill of Material and dimensional outline drawings.
EFTA00796191
C. Submit When Available:
1. Factory test reports.
2. Copy of Warranty.
3. Nameplate information: Including actual impedance.
4. Installation Manual.
5. Operations Manual.
1.5 WARRANTY:
A. Special Warranty: Manufacturer's standard form in which manufacturer agrees to repair or
replace transformer and associated auxiliary components that fail in materials or workmanship
within specified warranty period.
1. Warranty Period: Two years from date of shipping.
1.6 QUALITY ASSURANCE:
A. Testing Agency Qualifications: An independent testing agency, with the experience and
capability to conduct the testing indicated, that is a member company of the International
Electrical Testing Association or is a nationally recognized testing laboratory (NRTL) as defined
by OSHA in 29 CFR 1910.7. and that is acceptable to authorities having jurisdiction.
1. Testing Agency's Field Supervisor: Person currently certified by the Inter National
Electrical Testing Association or the National Institute for Certification in Engineering
Technologies to supervise on-site testing specified in Pan 3.
B. Product Options: Drawings indicate size, profiles, and dimensional requirements of transformers
and are based on the specific system indicated.
C. Electrical Components, Devices, and Accessories: Listed and labeled as defined in NFPA 70,
Article 100, by a testing agency acceptable to authorities having jurisdiction, and marked for
intended use.
D. Comply with IEEE C2.
E. Comply with ANSI C57.12.28.
F. Comply with NFPA 70.
EFTA00796192
1.7 DELIVERY, STORAGE, AND HANDLING:
A. Store transformers protected from weather and so condensation will not form in units.
B. Transformer to be delivered to the project site. Coordinate delivery with installing contractor.
1.8 SERVICE CONDITIONS:
A. Transformers shall be suitable for operation under service conditions specified as usual service
conditions in IEEE C57.12.00, except for the following:
I. Exposure to hot and humid climate or to excessive moisture, including steam, salt spray,
and dripping water.
2. Exposure to seismic shock or to abnormal vibration, shock, or tilting.
1.9 COORDINATION:
A. Coordinate sin and location of concrete bases and conduit stub-ups.
B. Coordinate installation so no piping or conduits are installed in space allocated for transformers
except those directly associated with transformers.
PART 2 — PRODUCTS
2.1 MANUFACTURES:
A. Manufacturers: Subject to compliance with requirements, provide products by one of the
following:
I. ABB Power T&D Co., Inc.
2. Cooper Industries; Cooper Power Systems Division
3. Howard Industries
2.2 PAD MOUNTED, LIQUID-FILLED TRANSFORMERS:
A. Description: Furnish 2-winding type, designed for operation with high-voltage windings
connected to a 3-phase, 3-wire, 60-11z, distribution system.
EFTA00796193
B. Rating and Features:
• Design for Step-up operation.
• Phase: 3 phase
• Frequency: 60 HZ
• Cooling Class: ONAN
• KVA rating: 750
• Temperature Rise: 55 65'C
• Material: Copper
• I Iigh Voltage Winding: 13.41444980-95k-V-BILI 13.8 GY17980 kV, 95 kV BIL
• Surge Arresters: 15kV, Distribution Class, Metal-Oxide, Varistor Type.
Low Voltage Winding: 480 Delta , 30kV BIL
Impedance: 5.75% 7.5% (ANSI C57.12)
Configuration: Dead Front, Radial Feed.
Primary Bushings: Three (3) Wells 15kV, 200 amp, Load Break Bushings.
Inserts: (3) Standard
Two Position Load Break Primary Switch
• Low Voltage Bushings: Tin Plated, Spade-Type Bushings for Vertical Takeoff. Spacing per
ANSI C57.12/34.
• Taps: 2 42 Vr% Above, 2 u 2'/:% Below Normal
• Coolant: Less Flammable Edible Seed Oil: See below
1. Insulating Liquid: Less flammable, edible-seed-oil based, and listed by a NRTL acceptable
to authority having jurisdiction as complying with NFPA 70 requirements for fire point of
not less than 300 deg C when tested according to ASTM D 92. Liquid shall be
biodegradable and nontoxic.
C. Primary Fuses: 15kV fuse assembly consisting of Bay-o-net oil-immersed fuses in series with
practical range current limiting fuses.
D. Full-Capacity Voltage Taps: Four 2.5-percent taps: 2 above and 2 below rated high voltage; with
externally operated tap changer for de-energized use and with a position indicator and provisions
for pad locking.
E. Low-Voltage Terminations and Equipment: Tin-plated spade-type. Include the following:
I. Bushing Supports.
F. Corrosion Protection:
I. Base and Cabinets of Two Compartment Transformers: Fabricate from stainless steel
according to ASTM A 167, Type 304 or 304L, not less than No. 13 U.S. gage. Coat
transformer with manufacturer's standard green color coating complying with requirements
of IEEE O7.12.28 in manufacturer's standard color green.
EFTA00796194
G. Accessories:
1. Drain Valve: 1 inch with sampling device in LV compartment.
2. I" upper fill plug and upper fill valve.
3. 1" drain plug in HV compartment
4. Dial-type thermometer gauge.
5. Liquid level gauge.
6. Pressure/vacuum gage with auxiliary• contacts.
7. Pressure relief device: Self-sealing with an indicator.
8. (3) Grounding pads (two-hole)
9. Nitrogen Blanket.
10. Welded main tank cover with bolted hand hole.
I. Meet NEMA TR-I sound levels.
12. Machine engraved nameplate made of stainless steel.
H. Seismic Performance: The transformers shall withstand the effects of earthquake motions
determined according to ASCEJSEI 7:
1. The term "withstand" means "the transformer will remain in place without separation of any
parts when subjected to the seismic forces specified and the transformer will be fully
operational after the seismic event."
2. Component Importance Factor: 1.5.
3. Component Amplification Factor: 2.
4. Component Response Modification Factor: 6.0.
2.3 FINISHES:
A. Comply with ANSI C57.12.28
B. Color. As per Owner.
2.4 IDENTIFICATION DEVICES:
A. Nameplates: Engraved metal nameplate for each transformer, mounted with corrosion-resistant
screws. Nameplates and label products are specified in Division 26 Section "Identification for
Electrical Systems."
EFTA00796195
2.5 SOURCE DUALITY CONTROL:
A. Factory rests: Perform the following factory-certified tests on each transformer.
I. Resistance measurements of all windings on rated-voltage connection and on tap extreme
connections.
2. Ratios on rated-voltage connection and on tap extreme connections.
3. Polarity and phase relation on rated-voltage connection.
4. No-load loss at rated voltage on rated-voltage connection.
5. Excitation current at rated voltage on rated-voltage connection.
6. Impedance and load loss at rated current on rated-voltage connection and on tap extreme
connections.
7. Applied potential.
8. Induced potential.
9. Temperature Test.
10. Insulation Power Factor Test
11. Submit test results to Owner for review and approval.
"AS.5 CItar Amami
APPROVEO'AS NOTED
❑ REVISED AND RESUBMIT
Check Is Only for Conformation with ths
Design Concept of the Project and CoMpliart0S
atth the information Given In the Contract
1ocwrrnts. Contractor Is Responsible fOr
rarer rrs to be Confirmed and Corrected at
ob •, For InforzOn, *hat pertains sotety
rr Fabrication. ritxteSs of to Techniques of
ruction; and for Coordination' dm
of AM T
'ate 1
VIREO ISLAS WATER no
POWER AUTHORITY
EFTA00796196
ℹ️ Document Details
SHA-256
22bf3d7a84b7d965a64641f46a219bc2a62cfdf7dc4545b2973510a06d134a98
Bates Number
EFTA00796191
Dataset
DataSet-9
Document Type
document
Pages
6
Comments 0