EFTA00811323
EFTA00811325 DataSet-9
EFTA00811326

EFTA00811325.pdf

DataSet-9 1 page 154 words document
P17 P23
Open PDF directly ↗ View extracted text
👁 1 💬 0
📄 Extracted Text (154 words)
Subbase Drydock Estimate P.O. Box 304429 Date Estimate # St. Thomas, USVI 00803 8/31/2017 915 Name /Address LSJ,LLC "Big N" Terms Project Upon Comple... Description Qty Cost Total Sandsweep cargo bay, cargo bay walls, and aft deck. Prime and paint with a non-skid two part 12,340.00 12,340.00 epoxy paint. Includes Labor and Materials. Fabricate and weld splash guards into place to minimize water intrusion through the front ramp. 7,500.00 7,500.00 Prime and paint for increased longevity. Prep and grind cracks throughout vessel. Includes Labor and Materials. Both cutless bearings are worn and not within tolerance. We recommend changing these while 3,750.00 3,750.00 hauled out. We also recommend checking the engine alignment while hauled out to ensure there are no issues with the drive train. Includes Labor and Materials. Degrease engine room, remove, clean and dispose of all waste oil. Approximately 200 gallons of 3,750.00 3,750.00 waste oil after clean up. Total S.27.3-10.00 Signature EFTA00811325
ℹ️ Document Details
SHA-256
2302eb2206a5e874a740adef76cfbeab757996bc2b2cc182795c8ccdec0581f5
Bates Number
EFTA00811325
Dataset
DataSet-9
Document Type
document
Pages
1

Comments 0

Loading comments…
Link copied!