EFTA01051745
EFTA01051747 DataSet-9
EFTA01051749

EFTA01051747.pdf

DataSet-9 2 pages 502 words document
P22
Open PDF directly ↗ View extracted text
👁 1 💬 0
📄 Extracted Text (502 words)
From: "Jeffrey E." <[email protected]> To: brice gordon Subject: Re: LSJ RO Service Report Date: Wed, 22 Mar 2017 20:13:19 +0000 yes On Wed, Mar 22, 2017 at 11:04 AM, brice gordon < > wrote: Jeffrey Attached, LSJ RO Service Report dated 3/21/17 for your review Based on this report, water production and quality levels should be getting back to normal. Flushing of entire system should continue. Below is a paragraph from the report which out lines the Critical Issues discovered with the Post Water Treatment. " and found the chemical injection pump dosing over Twice what it should be dosing which will cause an excessive amount of calcium carbonate to be consumed as well as poor water quality being delivered into the cistern. He also found the calcium carbonate reactor valve itself in the closed position probably due to the fact that with improper chemical dosing, the final product water was very high in calcium carbonate or hardness, so someone just figure that it would be best just to shut it off rather than properly adjusting the chemical feed. Unfortunately, this allowed for Very Low Ph Water to be fed into the cistern which when one considers that the cisterns on LSJ are of concrete design, will cause damage through attrition of the cistern itself as well as cause a rise in hardness and conductivity of the treated water." Post Treatment has been calibrated Water Hardness was measured @ 20ppm hardness, and as stated in the report will be increased to normal operating levels of 40ppm once the entire system recovers. Please note most Water Softness are rated to 40ppm Service Reports from 2014, 2015 and now 2017 all highlight the same issue, lack of Plant Maintenance and Poor Plant Operation The Go Forward- My recommendations EFTA01051747 Water Samples be taken again at the beginning of next week, from Plant, cistern and MB Smiley needs to be made Accountable for the RO Plant. He needs to understand if this happens again he will be released. He also needs to complete an online RO Operators course as a prerequisite for his job. The amount of time off he takes for University classes also needs to be addressed. Danny Ettinne should also receive training and complete the operators course, so there are two people on island who know the operation of the plant, to cover holidays etc Reporting should be forwarded to Management for review Can we proceed with the above recommendations? regards Brice Gordon please note The information contained in this communication is confidential, may be attorney-client privileged, may constitute inside information, and is intended only for the use of the addressee. It is the property of JEE Unauthorized use, disclosure or copying of this communication or any part thereof is strictly prohibited and may be unlawful. If you have received this communication in error, please notify us immediately by return e-mail or by e-mail to [email protected], and destroy this communication and all copies thereof, including all attachments. copyright -all rights reserved EFTA01051748
ℹ️ Document Details
SHA-256
23bb9c5eecf31285f092057faea505258edc708ed0ad7cfe9588caf6f300f066
Bates Number
EFTA01051747
Dataset
DataSet-9
Document Type
document
Pages
2

Comments 0

Loading comments…
Link copied!