From: "Jeffrey E." <[email protected]>
To: brice gordon
Subject: Re: LSJ RO Service Report
Date: Wed, 22 Mar 2017 20:13:19 +0000
yes
On Wed, Mar 22, 2017 at 11:04 AM, brice gordon < > wrote:
Jeffrey
Attached, LSJ RO Service Report dated 3/21/17 for your review
Based on this report, water production and quality levels should be getting back to normal.
Flushing of entire system should continue.
Below is a paragraph from the report which out lines the Critical Issues discovered with the Post
Water Treatment.
" and found the chemical injection pump dosing over Twice what it should be dosing which will
cause an excessive amount of calcium carbonate to be consumed as well as poor water quality
being delivered into the cistern. He also found the calcium carbonate reactor valve itself in the
closed position probably due to the fact that with improper chemical dosing, the final product
water was very high in calcium carbonate or hardness, so someone just figure that it would be best
just to shut it off rather than properly adjusting the chemical feed. Unfortunately, this allowed for
Very Low Ph Water to be fed into the cistern which when one considers that the cisterns on LSJ
are of concrete design, will cause damage through attrition of the cistern itself as well as cause a
rise in hardness and conductivity of the treated water."
Post Treatment has been calibrated
Water Hardness was measured @ 20ppm hardness, and as stated in the report will be increased to
normal operating levels of 40ppm once the entire system recovers.
Please note most Water Softness are rated to 40ppm
Service Reports from 2014, 2015 and now 2017 all highlight the same issue, lack of Plant
Maintenance and Poor Plant Operation
The Go Forward- My recommendations
EFTA01051747
Water Samples be taken again at the beginning of next week, from Plant, cistern and MB
Smiley needs to be made Accountable for the RO Plant. He needs to understand if this happens
again he will be released.
He also needs to complete an online RO Operators course as a prerequisite for his job.
The amount of time off he takes for University classes also needs to be addressed.
Danny Ettinne should also receive training and complete the operators course, so there are two
people on island who know the operation of the plant, to cover holidays etc
Reporting should be forwarded to Management for review
Can we proceed with the above recommendations?
regards
Brice Gordon
please note
The information contained in this communication is
confidential, may be attorney-client privileged, may
constitute inside information, and is intended only for
the use of the addressee. It is the property of
JEE
Unauthorized use, disclosure or copying of this
communication or any part thereof is strictly prohibited
and may be unlawful. If you have received this
communication in error, please notify us immediately by
return e-mail or by e-mail to [email protected], and
destroy this communication and all copies thereof,
including all attachments. copyright -all rights reserved
EFTA01051748
ℹ️ Document Details
SHA-256
23bb9c5eecf31285f092057faea505258edc708ed0ad7cfe9588caf6f300f066
Bates Number
EFTA01051747
Dataset
DataSet-9
Document Type
document
Pages
2
Comments 0