EFTA00595150
EFTA00595151 DataSet-9
EFTA00595156

EFTA00595151.pdf

DataSet-9 5 pages 678 words document
V15 P17 P23 D4 V16
Open PDF directly ↗ View extracted text
👁 1 💬 0
📄 Extracted Text (678 words)
Zorro Development Corp. 49 Zorro Ranch Road Stanley, NM 87056 Tel: 505 938 2920 Fax: 505 938 2924 E-mall Wire Transfer Request Form Date of Request: 7/12/10 Amount Requested: 53,919.20 Payee: 3 Ws LLC 6023 Osuna NE Payee Albuquerque Address: NM 87109 Bank Name: Mon File Bank M on File Address: Bank Account As on File Requested By: Purpose/ Description: Payment of Balance Due on Original Contract Only Project 865 New Estancia Fountain Special Notes / Instructions: Project tig New Estancia Fountain G / L Account Information: G / L Description: MH finish site Improvements G/ L Number: 15207 Authorization 6,0(4-)a-- 0411x.n-e 7kbo EFTA00595151 3B's LLC 6023 Osuna NE Albuquerque, NM 87109 Lic. # 83498 Invoice 42 Zorro Ranch Road Brice Gordon Brice, on the Estancia Fountain and the Stoops Here is the invoice for the work done $1 ,596.00 Original price $18,400 plus tax $1,196.00 = b Received $15,676.80 9.20 ,►Balance on original contract = $ 3,91 ding the fountain prior to final installation Additional cost for cleaning, repairing and buil inside the estancia. 00.00 plus tax (312.00) = $5,112.00 6 guys 1 supervisor x 16 hours (2days) $4,8 Total due with tax $ 9,031.20 ce, but asked Renee to find out from you if the I have the material for the outside terra waterproof concrete is just a thin layer and then light would be okay where there are. The the top of the lights. Everything will be the coating on top of that will not be flush with e in height which is about an inch. renc sealed so that is not the problem, just the diffe 450-3654. Please call me if you have any questions at Thank you, JJ flea EFTA00595152 Three B's LLC 4600 Lincoln rd. NE Albuquerque, NM 87109 Lic.# 83498 505.450-3654 Brice Gordon c/o Zorro Ranch Stanley, New Mexico Brice, H e are the prices for the fountains and stoops that we discussed 7 Option 1— Fountain in Estancia Remove sandstone as nertssary to accommodate new concrete foundation Saw cut, jackhammer and remove existing concrete fountain perimeter Work with electrician and plumber for electrical and drain modifications Form, pour and finish new concrete foundation Concrete pattern as per fountain specifications and measurements plus an additional F' added for variance Install fountain pieces, starting from inside and working to the outside Fountain pieces will be placed with construction adhesive The main entrance of the house will need to be utilized and a temporary ramp constructed to move the pieces into the estancia Includes; material, labor, equipment to complete project Excludes; electrical and plumbing Price S 16,000.00 plus tax Option 2 Stoops Remove damaged stoops to sound material Dowel and epoxy (if necessary) with re-bar Form pour and finish concrete $ 200.00 per stoop plus tax EFTA00595153 Option 3 Exterior Fountain Remove loose cement material from the floor of the fountain Adjust lights and plumbing (if necessary) prior to installing to epoxy coating Etch concrete foundation and rinse Repair cracks in concrete and seal with 1 component urethane sealant Seal perimeter joint, where wall meets the floor with a 1 component urethane Prime for base coat Apply base coat Apply topcoat Prime topcoat for exterior primer Apply 2 coats of exterior finish Acrylithane. Finish coat is light gray. Once the coatings have been applied they must be allowed to cure for 10 days prior to filling with water Price 3,200.00 plus tax 1 year warranty on labor 1 year limited warranty on material Call me if you have any questions at 450-3654 Thank you, JJ Blea Managing Member EFTA00595154 Zorro Development Corp. 5 11:16 AM ls De tai l for New Estancia Fountain #5 Job Estimate s vs . Ac tua 05/14/10 All Transactions Att. Cost (S) Ditf. Est Cost Service New Estancia Fountain 28,250.00 31,294.00 5,044.00 Contract 6.030.00 0.00 303040 Electrical 1,900,00 0.00 -1.900.00 Plumbing 6,830.32 -519.00 7,349.32 Shipping 13676.80 391920 19,596.00 0.00 Stone Work 0.00 0.00 er New Estancia Fountain - Oth -7.324.20 81,125.32 53,801.12 Total New Estancia Fountain 61,125.32 53.801.12 Total Service 53601.12 -7,324.20 61,12522 SZI=NrIIIIMI TOTAL Page 1 EFTA00595155
ℹ️ Document Details
SHA-256
24472c009d8b57593ecae5521c8632715ca19229d6247cd0b8a55ff176a307b4
Bates Number
EFTA00595151
Dataset
DataSet-9
Document Type
document
Pages
5

Comments 0

Loading comments…
Link copied!