👁 1
💬 0
📄 Extracted Text (1,092 words)
From: Richard Kahn
To: "jeffrey E."
Subject: Fwd: Quote for Big N/LSJ Barge
Date: Wed, 15 Apr 2015 14:32:56 +0000
Attachments: LSJ BigN.pdf
attached is preliminary quote for barge in the amount of 150,472
please note it has not addressed items 12-18 on our list
Richard Kahn
HBRK Associates Inc.
575 Lexington Avenue 4th Floor
New York, NY 10022
tel 212-971-1306
fax 646-350-0954
cel
Begin forwarded message:
Date: April 14, 2015 at 5:02:43 PM EDT
From: gene kral
Reply-To: gene kral
To: Daphne Wallace
Cc: Bill Hagu ann rodriquez < Rich Kahn
ano ljiggin e ra owry
Mary Kral
u ject: Quote for Big NILSJ Barge
Good Afternoon All.
Please see attached quote.
Please send a list of all the individuals that should be included on any relevant emails to:
Thank you,
Gene Kral Sr.
Subbase Drydock, Inc.
Parcel 162, Subbase
St. Thomas, USVI 00802
TEL: (340) 776-2078
FAX: (340) 779-8426
www.subbascdrydock.com
EFTA01203749
From: Daphne Wallace I
To: gene kral
Cc: Bill Hague ann rodriquez Rich Kahn
Sent: Monday, April 13, 2015 4:01 PM
Subject: Re: Barge List
Greetings Gene,
10 am tomorrow morning to see Big N at the American Yacht Harbor marina is confirmed.
If Anna has any changes she will contact you.
Kind regards, Daphne
On Mon, Apr 13, 2015 at 2:58 PM, gene kral wrote:
I would like to visit Big N tomorrow around 10:00 a.m. ok?
Gene
Gene Kral Sr.
Subbase Urydock, Inc.
Parcel 162, Subbase
St. Thomas, USVI 00802
TEL: (340) 776-2078
FAX: (340) 779.8426
wwwsubbasedrydock.com
From: Bill Hague
To: ann rodriquez
Cc: Rich Kahn Daphne Wallace Gene Kral
ay. pri :29 PM
Subject: Re: Barge List
Ok.
1
Rudders must be removed and the lower portion must be renewed to proper dimension. They are
worn to the point of failure and vibrate badly.
2
We bought pumps and pulleys we can install but I am referencing the gear in the aft
compartment that is the hydraulic actuator and linkage for the rudders
3
The cylinders were damaged at sea due to improper installation and subsequent damage from a
broken fitting. The ramp was secured with a safety strap but still pulled the top sealing portion out
of the cylinder.
I discussed this with Roy and it was decided to weld solid the leaking and damaged portions
rendering the cylinders unserviceable in the future but functional for the present.
The fit of the mounts needs to be remedied at this time. The cylinders work now but are not
repairable. Evaluation while being removed to correct and improve the mounting is necessary at a
minimum.
4
EFTA01203750
The exhaust was assembled without funding to get the barge off the dick at the last haulout. It is
not properly assembled or supports nor is it insulated.
6
We have new ones but need new mounting hoses
And must be done out of the water
7
Bearings must be purchased. I think SBDD has them
8
Inspection and new sacrificial sinks installed.
9
SBDD should provide this but it can be discussed.
10
Machine shop work
SBDD
12
This should be done at the same time the tank is cleaned.
13
Watertight compartments forward would need to be dewatered if breached.
There is no ability to do so at this time except fit the first two compartments that are joins as one
due to a hole in the bulkhead.
16
The gauges for oil and temp and rpm are not accurate. One over temperature alarm is not
working as well.
18
Parts.... As needed by inspection.
Sent from my iPhone
On Apr 13, 2015, at 13:38, ann rodriquez wrote:
Hey Roscoe,
Please see questions ---?
I need a clear understanding of the listed items, What parts should we purchase and What can be done in
house.
1. Rudders. --- What should be done?
2. Steering Gear.----Did we buy the parts for this?
3. Hydraulic Cylinders. What need to be done?
EFTA01203751
4. Exhaust system:--- What are the issues?
5. Engine Mounts and alignment. (Ok!)
6. Stuffing boxes/seals. Install new units:---- Should we buy the new units?
7. Cutlass bearings. ---- Do we need to purchase?
8. Engine Cooling Grid Coolers and Zinks. What need to be done?
9. Bottom Paint and Barrier Coat/ Hull Zinks. Should we purchase?
10. Engine and marine gear control bracket work. Do we need to purchase?
11. Fuel tank clean out. Port and starboard. (Ok!)
12. Starboard deck fuel fill adapter replacement. --- Should we replace or fix?
13. Bilge pumping system forward compartments. --- What about the forward compartments?
14. Repair existing 24 volt alternator and add a second one to port motor. ---- Should we purchase?
15. Inspect and size all hydraulic lines and fittings as needed. (Ok!)
16. Engine and marine gear instruments in control tower. ---- What does this mean?
17. Install engine room lighting. (Ok!)
18. Tune and service both engines and marine gear. ---- Any parts need?
19. Clean and paint engine room. ---- (Ok!)
Ann R.
DISCLAIMER: The information contained in this e-mail may be privileged,confidential, and protected
from disclosure. If you are not the intended recipient, you are hereby notified that any dissemination,
distribution or duplication of this communication is strictly prohibited. If you have received this
communication in error, please notify the sender immediately and delete all copies.
On Monday, April 13, 2015 12:22 PM, Boscoe wrote:
The following is the list I discussed with Gene at Subbase Drydock today 4/13/2015.
He is familiar with it and is now submitted for your review.
Inspect and Repair the following;
1. Rudders.
2. Steering Gear.
3. Hydraulic Cylinders.
4. Exhaust system
5. Engine Mounts and alignment
6. Stuffing boxes/seals.. Install new units
7. Cutlass bearings
8. Engine Cooling Grid Coolers and Zinks
9. Bottom Paint and Barrier Coat/ Hull Zinks
10. Engine and marine gear control bracket work.
11. Fuel tank clean out. Port and starboard
12. Starboard deck fuel fill adapter replacement
13. Bilge pumping system forward compartments
14. Repair existing 24 volt alternator and add a second one to port motor.
15. Inspect and size all hydraulic lines and fittings as needed.
16. Engine and marine gear instruments in control tower
17. Install engine room lighting
18. Tune and service both engines and marine gear.
19. Clean and paint engine room.
Timing of work
I have been told this haul out must be done in late April or May as there is scheduled and
contracted work reported for this facility during June, July and August.
EFTA01203752
Please, respond with any questions you may have.
EFTA01203753
ℹ️ Document Details
SHA-256
247aa524a68466c37557e0c85120d034e7429349e3645dd61173098e0ba287e4
Bates Number
EFTA01203749
Dataset
DataSet-9
Type
document
Pages
5
💬 Comments 0