Payroll, Calendar Week 1 01/19/19
Payroll
In our finance meeting prior to departure, a discrepancy became evident between policy and
practice on how crew time is clocked and paid. For example, the LSJE policy implies that employees
retain exempt status. However, the practice is when employees work past 4pm they are paid by the hour
for extra time worked, and if they work on a Saturday they are paid by the day according to each person's
respective pay rate as long as they work four hours or more. They are not paid overtime for extra hours
worked.
Further, the policy does not address the status of LSJE contractors. The expectation I heard from Jeanne
in our last finance meeting is that the time of contractors should be non-exempt, meaning their time
should be tracked and paid by the hour. However, the practice has been similar to that of employees, in
that if they work more than half a day, they are generally paid for the day; if they work beyond a full day,
they are paid for those additional hours. They are not paid overtime for extra hours worked.
Further, questions remain about the authority of the manager to implement a practice in good faith when
the policy is unclear or absent of information. For example, if an employee has been given permission by
JE to take a class, but the class requires him to leave one hour early on Wednesdays for six weeks, as an
exempt employee he is not paid by the hour, but is salaried, and so should not be charged for loss of time
at work. If the individual is an LSJE contractor (non-exempt), the question remains whether the manager
could implement a compensatory arrangement, where the individual takes the time off on Wednesdays
but makes up the time on Saturdays.
We need a policy that leads to clear practice for all of us so we can all be on the same page./ would like
to consult with Darren to propose revisions to the policy that will address these ayestionq I will
collaborate with STC staff to ensure all questions are addressed and will implement with the crew upon
CFO approval.
In the Interim
In light of the unexpected staffing transitions that have taken place over the last week mid pay cycle, I will
be submitting payroll for this pay period consistent with the previous manager's practice and will continue
to do so until clarifications are made and a better procedure is implemented.
Calendar
Proposal
In the event the determination is made what employees and/or contractors are non-exempt, and until a
better solution is determined and implemented regarding stationary time clocks, I would like to make all
captains (and the barge mate under the supervision of the captain) responsible for recording all persons
coming and going on the island, including non-LSJE contractors. The captains will each be equipped with
a cell-service enabled iPad (or cell phones with hot spots to enable the iPads which might make more
sense). An icon will be placed on the home page directly linking the captains to a spreadsheet in Google
does. This will enable all captains to work from the same live spreadsheet and the data will be real time.
An "X" will be placed beneath the island upon which the individual is currently located. The captain will
place "both" (or other notes as needed) indicating the individual worked on both islands that day. For
example:
Name Time In Time Out LSJ OSJ Notes
Example 7:00 AM 4:00 PM X Both
Name
This will remedy he following issues:
1. Safety. Conce ns of leaving crew behind as currently running two to three different boats rendering
difficulties knowing whether we "have everyone."
EFTA00810765
Payroll. Calendar Week 1 01/19/19
2. Security. Tracking all persons coming and going from the islands in the event something becomes
broken or goes missing and questions need to be asked.
3. Accountability. Employees and LSJE contractors paid true to hours worked. Non-LSJE contractors also
accountable for true hours billed to LSJE.
4. Documentation for other records. For example, if Reek.° has submitted a parking pass to LSJE for
payment, Daphne can confirm Reefco's presence by checking the attendance log for that day as backup
for the invoice.
In addition to the attendance record, I would like to streamline communication and clean up the chaos of
boat run schedules by adding a second icon to the home page that links to a shared Google Calendar.
Randy and Patrick will work together to manage and work from this real time calendar. Crew will
coordinate with captains directly for transport requests. Scheduled boat maintenance and repairs can be
added to this calendar in addition to scheduled runs. Other persons coordinating site visits such as Mike,
Daphne, Anna, Kyle can check the calendar and coordinate with existing runs so as to utilize the boats
more efficiently and eliminate unnecessary wear on the boats and fuel expenses. Further, we can all be
informed on who is coming and going and what projects are under way without having to send emails,
texts, or make half a dozen phone calls. In summary, if used properly this could be a tool to help keep all
of us informed and streamline a more efficient boat run process.
I would like to work directly with Jermaine to set up and implement this system, and would like to provide
a single training for all persons involved so practice is consistent and the method utilized to its fullest
potential. Please note that initially I requested two iPads. However, until a new crew boat is secured, I
believe we will need at least four — 1.) Patrick, 2.) Randy, 3.) Austin (barge mate), and 4.) one for
or an assigned person such as Kyle, Dupson, or Sheridon to take record of ferry transport from
AYH to LSJ dock in the mornings.
EFTA00810766
ℹ️ Document Details
SHA-256
256d126fbfe1687c705158ce464958ee4cef8260dd7cc68ef7541a5b9735a9d2
Bates Number
EFTA00810765
Dataset
DataSet-9
Document Type
document
Pages
2
Comments 0