📄 Extracted Text (199 words)
SUPREME WATER, INC. Estimate
Post Office Box 1562
Christiansted, 00821 DATE ESTIMA...
2/4/2016 199
NAME/ADDRESS
Mr. Danny Vicars
Assistant Island Manager
Great St. James
6100 Red Hook Quarters
St. Thomas, VI 00802
PROJECT
DESCRIPTION QTY COST { TOTAL
Well Drilling Service 150 80.00 12,000.00
Clean & Pressurize Well/Establish Gallons 1 800.00 800.00
Per Minute
Compressor 4 225.00 900.00
Application Process & Preparation 1 300.00 300.00
Well Seal 1 55.00 55.00
Gravel #7 2 130.00 260.00
Submersible Pump 1 875.00 875.00
Rope 320 0.89 284.80
Lay Concrete Slab 1 220.00 220.00
Reducer 6" to 4" with well cap 1 60.00 60.00
PVC Accessories (Couplets, etc) 1 180.00 180.00
Well Screen 1 175.00 175.00
Polyurethane Roll 200 1.10 220.00
20 Gallon Holding Tank 1 250.00 250.00
Water Meter 1 250.00 250.00
#12 Gauge 4-Wire Type SEOOW 150 1.95 292.50
Mud Cetco Super Gel-X 4 185.00 740.00
Mud Tiger Brand 5 190.00 950.00
Schedule 40 140 7.20 1,008.00
Mobilization (equipment) I 4,500.00 4,500.00
Thank you for your business. TOTAL $24,320.30
EFTA00801817
This document was created with Win2PDF available at
The unregistered version of Win2PDF is for evaluation or non-commercia use on Y.
This page will not be added after purchasing Win2PDF.
EFTA00801818
ℹ️ Document Details
SHA-256
25a30c512554ddcc81231d4400ff3d12c4a580c2bff85b8f65ecae6d15d90966
Bates Number
EFTA00801817
Dataset
DataSet-9
Document Type
document
Pages
2
Comments 0