EFTA01156991
EFTA01156992 DataSet-9
EFTA01156993

EFTA01156992.pdf

DataSet-9 1 page 202 words document
V16 P23 P17
Open PDF directly ↗ View extracted text
👁 1 💬 0
📄 Extracted Text (202 words)
From: Daphne Wallace To: Jeffrey Epstein Cc: Gary Kerney SII I3rice Gordon Sarah K Subject: Photographs - January 31, 2011 Date: Mon, 31 Jan 2011 21:51:42 +0000 Attachments: Landscaping_behind_master_suite.JPG; Landscaping_behind_master suite_(2).JPG; Landscaping_behind_master_suite_(3).JPG; Landscaping_behind_master_suite_(4).JPG; Landscaping_behind_master_suite_(5).JPG; Landscaping_behind_master_suite_(6).JPG; Landscaping_behind_master_suite_(7).JPG; Landscaping_behind_master_suite_(8).JPG; Dock_pad_excavation.JPG; Dock_pad_excavation_(2).JPG; Dock_pad_excavation_(3).JPG; Dock_pad_excavation_(4).JPG; Entry_way_project.JPG; Entry_way_project_(2).JPG; Entry_way_project_(3).JPG; Entry_way_project_(4).JPG; Entry_way_project_(5).JPG; Entry_way_project_machine.JPG; Ion_work_on_faceplates_cottage_1.JPG; Ion_work_on_faceplates_cottage_2_(2).JPG; Ion_work_on_faceplates_cottage_2.JPG; Ion_work_on_faceplates_cottage_3_(2).JPG; lon_work_on_faceplates_cottage_3_(3).JPG; Ion_worlc_on_faceplates_cottage_3.JPG; Master_suite_foyer_sconces.JPG; Master_suite_foyer_sconces_(2).JPG; Master_suite_foyer sconces_(3).JPG; Master_suite_foyer_sconces_(4).JPG; Master_suite_tub_room.JPG; Outdoor tub.JPG; Outdoor tub_(2).JPG; Outdoor_tub_(3).JPG; Outdoor_tub_(4).JPG; Stairs_to_master suite.JPG; Stairs_to_mastersuite_(2).JPG; Stairs_to_master suite_(3).JPG; Nanna_painting.JPG; Nanna_painting_(2).JPG; Handrails_project.JPG Greetings Mr. Epstein, In response to your directive that the canary should be centered on the opening, Gary advised that it was necessary to plant the palm far enough away from the master suite so the palm fronds do not interfere with the roof gutters. Brian has been advised to place buffers between the floating dock and the pilings. Photographs of January 31, 2011, for your review and comments: Landscaping behind master suite progress Dock pad excavation Entry way project - the additional boulders and the machine are on site to begin repositioning the boulders into place tomorrow Ion's work on the faceplates in the cottages Master suite foyer sconces installed Master suite tub room Stairs to master suite tiling Outdoor tub Nanna painting Handrails Respectfully submitted, Daphne EFTA01156992
ℹ️ Document Details
SHA-256
2aaa126336fc7c3bba12fe09ae119a9b70a75ed40c4703023caa99d3eb48accd
Bates Number
EFTA01156992
Dataset
DataSet-9
Document Type
document
Pages
1

Comments 0

Loading comments…
Link copied!