EFTA02653555.pdf
👁 1
💬 0
📄 Extracted Text (240 words)
From: Hugo Hodge <
Sent: Monday, April 3, 2017 5:34 PM
To: jeffrey E.
Subject: Re: thanks hugo,
The panels, inverter setup,=generator controls in the back, wiring, smell of gasoline, etc.
=div>
The option with a cable from LSJ to GSJ as the primary f=ed is unreliable because it's one radial feed, meaning it comes
from just o=e direction and one route. Any damage to the utility feeder, pad, switch, o= cable and both LSJ and GSJ are
out of power until repairs are completed. W=ile this is currently the case you would have more exposure with two
system=. This includes damage to the switch caused by a fault on either of your tw= islands.
On Apr 3, 2017, at 1:22 PM, jeffrey E. <[email protected]> wrote:
<=div>
what sepcifically neede= cleaning panel? batteries? =, why is the cable from Ish to GSJ unreliable , any more
than current=y
&nb=p; please note
The information contained in this communicatio= is
confidential, may be attorney-client privileged, may
constitute i=side information, and is intended only for
the use of the addressee. It i= the property of
JEE
Unauthorized use, disclosure or copying of this<=r>communication or any part thereof is strictly prohibited
and may be un=awful. If you have received this
communication in error, please notify u= immediately by
return e-mail or by e-mail to [email protected] <mailto:[email protected]> , and
destroy t=is communication and all copies thereof,
including all attachments. copy=ight -all rights reserved
EFTA_R1_01897335
EFTA02653555
ℹ️ Document Details
SHA-256
2ba317e4acb0f59f8822acd5af9fee004a0d8188cbcddbe5aa92b4ec752b86bc
Bates Number
EFTA02653555
Dataset
DataSet-11
Type
document
Pages
1
💬 Comments 0