EFTA02653555.pdf

DataSet-11 1 page 240 words document
👁 1 💬 0
📄 Extracted Text (240 words)
From: Hugo Hodge < Sent: Monday, April 3, 2017 5:34 PM To: jeffrey E. Subject: Re: thanks hugo, The panels, inverter setup,=generator controls in the back, wiring, smell of gasoline, etc. =div> The option with a cable from LSJ to GSJ as the primary f=ed is unreliable because it's one radial feed, meaning it comes from just o=e direction and one route. Any damage to the utility feeder, pad, switch, o= cable and both LSJ and GSJ are out of power until repairs are completed. W=ile this is currently the case you would have more exposure with two system=. This includes damage to the switch caused by a fault on either of your tw= islands. On Apr 3, 2017, at 1:22 PM, jeffrey E. <[email protected]> wrote: <=div> what sepcifically neede= cleaning panel? batteries? =, why is the cable from Ish to GSJ unreliable , any more than current=y &nb=p; please note The information contained in this communicatio= is confidential, may be attorney-client privileged, may constitute i=side information, and is intended only for the use of the addressee. It i= the property of JEE Unauthorized use, disclosure or copying of this<=r>communication or any part thereof is strictly prohibited and may be un=awful. If you have received this communication in error, please notify u= immediately by return e-mail or by e-mail to [email protected] <mailto:[email protected]> , and destroy t=is communication and all copies thereof, including all attachments. copy=ight -all rights reserved EFTA_R1_01897335 EFTA02653555
ℹ️ Document Details
SHA-256
2ba317e4acb0f59f8822acd5af9fee004a0d8188cbcddbe5aa92b4ec752b86bc
Bates Number
EFTA02653555
Dataset
DataSet-11
Type
document
Pages
1

Community Rating

Sign in to rate this document

📋 What Is This?

Loading…
Sign in to add a description

💬 Comments 0

Sign in to join the discussion
Loading comments…
Link copied!