LSJ and GSJ Schedule smartsheet
Project Name Notes
I Task Name Finish Assigned To Comments
2 OW Projects:
3 North Terrace
4 Site Work -Grading Jules
5 Dig Out Small Gen Bunker Kyle CMU infill
6 Underground Electric Mike
7 Wve Mesh! Framework for Pad tbd
8 Concrete Pour tbd Center Point Set 13/15/18 by JEE
9 Saw Cuts and Sealing tbd
10 Sign Off (Work Up to Standards) Kyle
11
12 RO System GSJ Finish
13. Onsite Delivery LSJ Awaiting delivery
14 Installation and testing LSJ
15 Seawater Intake Gemini onsite awaiting install
16 .
17 GSJ Big 110 Fbilsh TBD Possible Slop Work Order DPNR
18
•
19 • GSJ Bunker Building Finish Contractors to Bid (EB / JPK?) DPNR • Need Architect
20 Site Prep Maintenance Jules to dig out bunker area (Kyle and BC to layout)
•_
21 Construction TBD (Select Contractor) 12 week Construction Schedule (CMU
22 Testing of Epuipitment Mike
23 . Sign Offs Kyle
24
25 Refurbish / Extend Q Hut Finish DPNR Issues
26. Repair and Extend Q Hut EB EB to begin on this again, tent Monday
27 . Roller Doors EB
28. Sign Offs Kyle
29
30 GSJ Staff Cottage Finish 01/20/19 DPNR - Starting Back Thursday Interior
31 GSJ Septic Tank Adam Cook Elada
32 Construction JPK
33 Furniture Package to order
34 Sign Offs Kyle
35
36 GSJ Mai House Septic Tank Finish
37 . Installation of New System Adam Cook Backfill
38 Demolition Of Oki Sysytem Adam Cook
Page 1 of 5
EFTA00807895
Project Name End Assigned To: I Notes
39 Site Wont! Sign Offs Kyle
40
41 GSJ IT Work Contractor
42 ALV 11/30/18 start - BC
43
44 LSJ Projects:
45
46 Main Compound Wall Finish Danny! Rich in Negotiations on Price (Issue with Picking Stones)
47
48 Master Roof Finish TBD , JPK?
49
50 Master Bathroom Finish
51 Extend terrace - Design TB Confirmed JEE to decide
52 New Shower Hardware Plumber tbd
53 Repair Shower! Light Tile Work
54 New Shower Floors
55
56 Library Rod Finish TBD , JPK?
57
58 Flag Pool Cabana Interior Finish tee Temp Counters to start, ordering from FL
59 Kitchen Remodel
60
61 Main Cabanas Finish Final Couinters / Punchlist cleanup
62 Countertops EB From FL now?
63 Move In LSJ In Progress 2/4
64
65 CNIax Room
66 NC Unit mike 7 reefco In Progress
67
68 TM haphen 01/21119 Self Preform
69 Electrical / Plumbing tbd Contractor • Mike Mike
70 Larger Stone Apron Front tbd Contractor Use new Carmix
71
72 Dock Shelter
73 New Decking tbd LSJ IPE order amount confirmed - design needs confirmation and to be purchased
74 Storage Lockers tbd BJ Sample material on Dock - Wailing Approval
75
76 Smal dock Shelters
Page 2 of 5
EFTA00807896
Project Name End Assigned To: Notes
77 Planters tbd LSJ
78
79 Pope Garden
80 Order New Shade House tbd BB JEE to review onsite
81
82 Generator 2 Rebuid Finish Mike sent VR to rimco 11-27 due back 11-30, install then testing (2 Hours)
83
84 Engineering Building
85 Demo I Construct new Building tbd Design tbd Brice reached out to John Woods with comments, no response yet (10/10)
86
87 Pebble Beach
88 Fishermans Hut tbd Design TBD Redig Footing and Start Pour
89 Foundation 11/27118 Design TBD Push after NYD to dig out again, lay rebar, pour FDs
90
91 Five Palms Bids in progress - EB and JPK to submit numbers
92 New Root tbd Design TBD new roof along with new gold Dome (
93 Light Site Work tbd Design TBD
94 New Windows tbd Design TBD awaiting bid from EGS
95 New Doors tbd Design TBD
96 New electric 1Feeder line tbd Design TBD
97
98 Start Bathrooms / Gas Station
99 Doors and Hardware replace tbd
100 Wmdow Replacement tbd
101 Plumbing issues tbd
102 Concrete tbd
103
104 IT Issues
105 Nay Cell Tower Bid tbd Brice
106
107 Permitting
108 Cables LSJ-GSJ
109 Dock LSJ-GSJ
110 Building Permits
111
112 Emergency Room
113 Design t Material List tbd owner to confine
114 Design Approval
115 Equipment Orders
Page 3 of 5
EFTA00807897
Project Name End Assigned To: Notes
116 Installation
117
118 Hanger Building
119 Roof Repair TBD awaiting permits
120 New Doors TBD awaiting permits
121
122 Roads
123 Jeffers Pricing Revisions Jan 14th tentative start date given by Jeffers
124
125 Service Gates Finish
126 Build New Gates Bamboo for Gates
127 Installation LSJ Carpenters? Or EB for small work
128
129 Boat Ust
130 Sportis Tube Replacement Finish tbd Captains
131 Little C Refit tbd Captains
132 Big N Muffler Finish tbd Captains
133
134 EquIplment
135 T1.1255O fled LSJ EDA to TX
136 272 D2 Skid Steer Ibd LSJ TX 10/31 • EDA to FL pending
137 John Deer Tractor ILA LSJ Need to select
138
139
140 Mice G. Electrical List
141 Palm Tree Lighting Mike Ongoing
142 Courtyard Lighting Mike Ongoing
143 Pool cabana kitchen electric Mike Ongoing
144 Chillax AC Mike Ongoing
145 Doc* Lighting and electric Mike Ongoing
146 Camera for Staff cottage Mike Pending
147 Cistern drains for Main Compound Mike Pending
148 thither* from GenBld to Tunnel Mike Ongoing
149 Movie Room Speakers Mike Ongoing
150 ReplacePool Heater Mike Ongoing
151 Repair both Fuel Pumps Mike Ongoing
152 Repair Diesel Feeding Dispencer Mike Pending
153 Install Water Distribution Pumps LSJ Mike Pending
154 Refurbish water distribution manifold Mike ongoing
Page 4 of 5
EFTA00807898
Project Name End Assigned To: Notes
155 Install New Sewage Lift LSJ Mike Ongoing
156 Fix Waterheater Staff Cottage Mite Pending
157 LSJ Tiki Kitchen Remodel Electric/Plumbing Mite Ongoing
158 Blue Beach Transformer Replacement Mike Mike to Oulsource
159 Electrical and Data to 5 Palms Mike Charles Electric to Price
160 Electrical Conduit Work al Tower Mike Ongoing
161 Solar System and Electric Pebble Beach Mike Roof Done - Ongoing
162 Power to Beach for Captains Mike Pending
163 Filter Replacement Seawater Intake Mike Pending
164 Refurbish Fire System GenBld Mike Pending
165 Fuel Truck Replacement Mike Pending - Quotes To be collected
166 Replacement of Elec Panels Pool Rooms Mike Pending
167 Electric out to new waterfall area Mike Rending
168 Replace All Exterior Light Trim to White Mike pending
169 Replace All Exterior Switches Mike Ongoing
170 Staff Cottage Dryer Change to Propane Mike Pending
171 Install Lights for Library Statues Mike Pending
172 New Awnings Both Pool ken Mike Pending
173 Install New Sewage Treatment Plant Mike Ongoing
174 Wire New Generators GSJ Mike Pending
175 Install Electric GSJ Tiki Mike Ongoing
176 Replace Batteries GSJ Solar Mike Pending
177
178
179
180
181
182
Page 5 of 5
EFTA00807899
ℹ️ Document Details
SHA-256
2baabdb39a9929bcb9083fdbadf817cef9585f248dd62d2e3d46ce46c0fc2d27
Bates Number
EFTA00807895
Dataset
DataSet-9
Document Type
document
Pages
5
Comments 0