EFTA00636502
EFTA00636503 DataSet-9
EFTA00636504

EFTA00636503.pdf

DataSet-9 1 page 171 words document
V16 P17 P23
Open PDF directly ↗ View extracted text
👁 1 💬 0
📄 Extracted Text (171 words)
ZORRO DEVELOPMENT 1/21/14 Satellite: Deposit paid to Advanced Comm — 1/17 Meeting with Advancced Comm 1/23 to confirm network map & scope of work. References/Updated Proposal from SpaceNet & Jim Cloud forwarded to Rich — 1/20 Meeting today with RMC Electric to confirm poles for links to MH & RC Pool Replaster/Spa Clean: attached photos Plaster work finished, acid wash & filling started today Bead Blasting of Spa Tile, unsucessful, have requested estimate to replace tile & grout will forward once in hand Gate: Project Complete as of 1/21 Sony: Issues with Tablet not communicating with equipment. New Tablet has been ordered incase it is a Tablet issue IR to be extended closer to seating area. Installer back on site 1/23 to resolve issues Installation of moulding on hold until all issues are resolved Dakota Well: Rig was due on site today, delayed due to an emergency call out. Now due 1/23 Cactus Removal: attached photos Fabrication of railway tracks for drags complete. Removal of cactus continues as weather allows EFTA00636503
ℹ️ Document Details
SHA-256
2c834acaa882f50d8c03b873e17bcf5c4d028d01bb657d3fc3bf00f48c56f43e
Bates Number
EFTA00636503
Dataset
DataSet-9
Document Type
document
Pages
1

Comments 0

Loading comments…
Link copied!