📄 Extracted Text (1,162 words)
SourceOne Invoice
Date Invoice #
370 7th Avenue
Suite 704 1/31/2011 100379
New York, NY 10001
Bill To Work Site
9 E 71st Street Corporation 9 E 71st Street Corporation
Att J Epstein Att J Epstein
9 East 71 Street 9 East 71 Street
New York, NY 10021 New York, NY 10021
Remit Payment To:
SourceOne APT, Inc.
PO Box 415402
Boston, MA 02241-5402
P.O. No. Terms Due Date
See Below Due on receipt 1/31/2011
0ty Description Unit Price Net Price
Conduct a Comprehensive Energy Assessment of 9 East 71st Street in New York
City in accordance with proposal 10P12-3. Project 11005
Scope of work per proposal:
Building Energy Consumption Profile
•Examine existing building documentation.
•Conduct interviews with property manager. engineering personnel and
ownership to identify actual & expected usage and facility requirements
•Review last two years of utility bills and develop load profiles for gas, steam and
electric consumption and demand.
-Analyze available metered utility data including steam, electric and natural gas
data.
•Review applicable available site drawings.
Building Infrastructure Survey
-Interview facility personnel most familiar with the operation and maintenance of
the building to determine usage patterns, operation methodologies and
maintenance requirements.
•Examine building mechanical and electrical infrastructure to determine and
evaluate potential ECM improvements.
•Focus on improvements that will concentrate on control and operational
changes designed to lower operating costs without affecting the comfort and
safety of building occupants.
•Develop operational plan as required to reduce peak consumption and kWh
usage.
•Develop infrastructure upgrade plan as required, including conceptual level
drawings as needed.
Engineering and Cost/Benefit Analysis
•Perform technical evaluations and discuss improvements with client to
determine practicality and effectiveness and where further study is warranted.
•Review potential conservation improvements for consistency with comfort
requirements and building operating standards.
-Analyze energy savings of the various improvements based on engineering
practice and incremental energy costs; analyze interactive effects of
Total
EFTA00287144
SourceOne Invoice
Date Invoice #
370 7th Avenue
Suite 704 1/31/2011 100379
New York, NY 10001
Bill To Work Site
9 E 71st Street Corporation 9 E 71st Street Corporation
Att J Epstein Att J Epstein
9 East 71 Street 9 East 71 Street
New York, NY 10021 New York, NY 10021
Remit Payment To:
SourceOne APT, Inc.
PO Box 415402
Boston, MA 02241-5402
P.O. No. Terms Due Date
See Below Due on receipt 1/31/2011
Qty Description Unit Price Net Price
improvements if necessary
•Consult with contractors, manufacturers, and suppliers as appropriate regarding
costs associated with implementing improvements
•Review any operation and maintenance savings
•Review recommendations with client and select final list of improvements
•Discuss any implementation options and/or restrictions
•Develop preliminary budget and time-table estimates for cooling, heating and
lighting infrastructure upgrades
-Secure preliminary budget and time-table estimates for infrastructure upgrades
Comprehensive Energy Assessment Report
•Executive summary of energy conservation measures, with aggregate costs and
savings information for entire program. Offer facility upgrade recommendations.
•Description of each recommended ECM improvement and measures considered
but not recommended.
-Implementation cost estimate for each recommended measure, with contractor
information or product literature as appropriate.
•Energy savings calculations for each improvement and discussion of other
benefits as applicable (greater reliability, improved operating control.
maintenance savings, enhanced comfort, etc.).
-Simple payback analysis for each energy conservation measure.
•Outline specifications and other information needed to proceed with
implementation.
Presentation
•Prepare outline of energy conservation options, recommendations and proposed
implementation solutions for presentation to owners and management.
Total Quote Price 10.000.00 10.000.00
Tax: Not Applicable to Project 0.00% 0.00
Total $10,000.00
.„ „
EFTA00287145
SourceOne Invoice
Date Invoice #
370 7th Avenue
Suite 704 1/31/2011 100379
New York, NY 10001
Bill To Work Site
9 E 71st Street Corporation 9 E 71st Street Corporation
Att J Epstein Att J Epstein
9 East 71 Street 9 East 71 Street
New York, NY 10021 New York, NY 10021
Remit Payment To:
SourceOne APT, Inc.
PO Box 415402
Boston, MA 02241-5402
P.O. No. Terms Due Date
See Below Due on receipt 1/31/2011
0ty Description Unit Price Net Price
Conduct a Comprehensive Energy Assessment of 9 East 71st Street in New York
City in accordance with proposal 10P12-3. Project 11005
Scope of work per proposal:
Building Energy Consumption Profile
•Examine existing building documentation.
•Conduct interviews with property manager. engineering personnel and
ownership to identify actual & expected usage and facility requirements
•Review last two years of utility bills and develop load profiles for gas, steam and
electric consumption and demand.
-Analyze available metered utility data including steam, electric and natural gas
data.
•Review applicable available site drawings.
Building Infrastructure Survey
-Interview facility personnel most familiar with the operation and maintenance of
the building to determine usage patterns, operation methodologies and
maintenance requirements.
•Examine building mechanical and electrical infrastructure to determine and
evaluate potential ECM improvements.
•Focus on improvements that will concentrate on control and operational
changes designed to lower operating costs without affecting the comfort and
safety of building occupants.
•Develop operational plan as required to reduce peak consumption and kWh
usage.
•Develop infrastructure upgrade plan as required, including conceptual level
drawings as needed.
Engineering and Cost/Benefit Analysis
•Perform technical evaluations and discuss improvements with client to
determine practicality and effectiveness and where further study is warranted.
•Review potential conservation improvements for consistency with comfort
requirements and building operating standards.
-Analyze energy savings of the various improvements based on engineering
practice and incremental energy costs; analyze interactive effects of
Total
EFTA00287146
SourceOne Invoice
Date Invoice #
370 7th Avenue
Suite 704 1/31/2011 100379
New York, NY 10001
Bill To Work Site
9 E 71st Street Corporation 9 E 71st Street Corporation
Att J Epstein Att J Epstein
9 East 71 Street 9 East 71 Street
New York, NY 10021 New York, NY 10021
Remit Payment To:
SourceOne APT, Inc.
PO Box 415402
Boston, MA 02241-5402
P.O. No. Terms Due Date
See Below Due on receipt 1/31/2011
Qty Description Unit Price Net Price
improvements if necessary
•Consult with contractors, manufacturers, and suppliers as appropriate regarding
costs associated with implementing improvements
•Review any operation and maintenance savings
•Review recommendations with client and select final list of improvements
•Discuss any implementation options and/or restrictions
•Develop preliminary budget and time-table estimates for cooling, heating and
lighting infrastructure upgrades
-Secure preliminary budget and time-table estimates for infrastructure upgrades
Comprehensive Energy Assessment Report
•Executive summary of energy conservation measures, with aggregate costs and
savings information for entire program. Offer facility upgrade recommendations.
•Description of each recommended ECM improvement and measures considered
but not recommended.
-Implementation cost estimate for each recommended measure, with contractor
information or product literature as appropriate.
•Energy savings calculations for each improvement and discussion of other
benefits as applicable (greater reliability, improved operating control.
maintenance savings, enhanced comfort, etc.).
-Simple payback analysis for each energy conservation measure.
•Outline specifications and other information needed to proceed with
implementation.
Presentation
•Prepare outline of energy conservation options, recommendations and proposed
implementation solutions for presentation to owners and management.
Total Quote Price 10.000.00 10.000.00
Tax: Not Applicable to Project 0.00% 0.00
Total $10,000.00
.„ „
EFTA00287147
ℹ️ Document Details
SHA-256
2cba521822e4469e4464bf596d75efc5da57d558de834e9d13fd2eb4c0fe3d77
Bates Number
EFTA00287144
Dataset
DataSet-9
Document Type
document
Pages
4
Comments 0