EFTA00679023.pdf

DataSet-9 3 pages 667 words document
👁 1 💬 0
📄 Extracted Text (667 words)
From: Eric Roth To: jeffrey E. <1 CC: ' Subject: RE: Sunday morning Date: Thu, 27 Apr 2017 13:16:49 +0000 Inline-Images: image007.jpg; image008.jpg; image009.jpg; image001.jpg; image002.jpg; image003.jpg Apologize; I thought you were in New York. Seats and carpet would be about eight (8) weeks or so. New recliner footrests take about 35days to manufacture. Best Regards, Eric ERIC H. ROTH I PRESIDENT 1R - IJI Logo - Horizontal-SMALL P 631.737.5900 I C 516.857.6533 iL 2221 Smithtown Avenue, Long Island MacArthur Airport, Ronkonkoma, New York 11779 From: Jeffrey E. [mailto: Sent: Thursday, April 27, 2017 9:07 AM To: Eric Roth c; lvjet •rz > Subject: Re: Sunday morning i am in caribean flying back monday, my scheudle for middle east is the issue. not paint slot or contract. . I am in no rush with paint or completion. my travel schedule is priority, I canceld paint slot. I have plenty of time to get it right. also looking at BBJ to add. . if in first round we only do seats and carpet , how quick can i have my plane flying? On Thu, Apr 27, 2017 at 9:02 AM, Eric Roth < wrote: Today: Thursday the 27th Input: Monday the 15th (about 2 weeks) Needed to get from point A to point B: I. Signed contract 2. Materials selected (including ordering long lead time items such as the wood veneer — 2 plus weeks to manufacture) 3. Define "open areas" (Aft lavatory walls, potty seat, vanity, LJH galley, etc.) Items to put us on track for a successful refurbishment EFTA00679023 When do you envision signing the contract? (Today would be a pretty good day to do so) Let's meet at your place Sundayv rr rrihigjas earl s you want) and review materials that Eileen has put together for you and go over the "open areas" that need definition "If" you are interested in doing paint during the refurbishment, let's review paint colors (I will bring with me) and let's lock in the May 26th paint slot. By doing this we will be prepared for you at input. If you are feeling pressured to make decisions, don't worry because you still have some time on most of the materials if you want to think about them for a little more time, but we can order the wood and start design and structural engineering. By locking in the paint slot you will still have adequate time to select the exterior colors. Your thoughts? Best Regards, Eric ERIC H. ROTH I PRESIDENT g i",11I Logo - Horizontal-SMALL P 631.737.5900 I C 516.857.6533 I 2221 Smithtown Avenue, Long Island MacArthur Airport, Ronkonkoma, New Yo k 11779 From: jeffrey E. [mailto: Sent: Thursday, April 27, 2017 8:05 AM To: Eric Roth •,: >; Ivjet Subject: can your girl meet me with fabric samples at teterboro 11 am monday? if we use the same carpet as the g 4 does it have to be re fire tested? please note The information contained in this communication is confidential, may be attorney-client privileged, may constitute inside information, and is intended only for the use of the addressee. It is the property of JEE Unauthorized use, disclosure or copying of this communication or any part thereof is strictly prohibited and may be unlawful. If you have received this communication in error, please notify us immediately by return e-mail or by e-mail to and destroy this communication and all copies thereof, including all attachments. copyright -all rights reserved please note EFTA00679024 The information contained in this communication is confidential, may be attorney-client privileged, may constitute inside information, and is intended only for the use of the addressee. It is the property of JEE Unauthorized use, disclosure or copying of this communication or any part thereof is strictly prohibited and may be unlawful. If you have received this communication in error, please notify us immediately by return e-mail or by e-mail to and destroy this communication and all copies thereof, including all attachments. copyright -all rights reserved EFTA00679025
ℹ️ Document Details
SHA-256
2dcb9a6f35ed9029411ad7f18a05aeb0648af93b3fd4129d908b1f2b0b90acad
Bates Number
EFTA00679023
Dataset
DataSet-9
Type
document
Pages
3

Community Rating

Sign in to rate this document

📋 What Is This?

Loading…
Sign in to add a description

💬 Comments 0

Sign in to join the discussion
Loading comments…
Link copied!