PROJECT LIST
Flagpole Pool Cabana: Run computer cords under flooring.
(Will begin 3/19)
Flagpole Pool Cabana: New solution for desk casters—need
non-swivel clear casters instead. Steph to order.
Flagpole Pool Cabana: New kitchen design underway.
Awaiting input from JE.
New Employee Bathrooms: Correcting drainage issue. (In
progress 3/18)
New Employee Bathrooms: Build deck surrounding.
Tiki Hut: Table for kitchen. (In progress 3/18)
Tiki Hut: Propane stand (will review)
5 Palms: Run computer cords under flooring. (Awaiting ok to
go through rug)
5 Palms: Coffee tables x 2 made from sculpture in storage.
Glass tops?
Throughout Property: Thatch repairs (ongoing)
Pools/Beach: Equipment Rack for pool/beach toys.
Pools: Redesign dock box lids.
Pop's Garden: Pergolas. Review with Chris Sheehan.
Shipping Crate: Build crate to ship items to Zorro.
Under Master Storage: Build doors on first three sets of
shelves.
Relax Room: Plans to add sliding glass doors to one side of
room.
Library/Sarah's Office: Build "house" for new chiller units.
EFTA01098864
Master: Install replacement mirrors around bath.
Grotto: Re-secure louvers that are hanging.
EFTA01098865
ℹ️ Document Details
SHA-256
2e35def07c201d2b29b147195399d93b49ca21969323a6a4aeea5f116e53fb29
Bates Number
EFTA01098864
Dataset
DataSet-9
Document Type
document
Pages
2
Comments 0