Mechanical Projects Pending at. 9 East 715t Street, LSJ, Zorro
Ranch
9 East 71st Street.
• Entry lighting, Simply Elegant proposal
$14,730 for complete installation electrical &
General contractor work Painting & patching.
Laredo Electric inc. $6,619.60 to install light
fixtures only.
• Sawyers , Fire Alarm System upgrade proposal
$55,780.00
• AD Winston, Condenser Water piping
proposal for ac unit in IT Room, to remove
unit off of city water and connect to cooling
tower loop. $12,514.00
• Siemens order new control valves AC -11, AC-4
budget $1,500.00
• Steam Room 3 rd floor change door frame to
magnetic door latch with new vapor seal
gaskets .Home Depot magnets installed no
good and will leak. I will provide contractor
and proposal.
• Chiller Project for late winter early spring
time.
EFTA01146225
LSJ
• Library ac unit, we received two proposals to remove
and replace the existing Trane unit that is failing and had
operational issues since installation. The Trane unit
could never keep the relative humidity levels in the
library at set point and the air flow in the library is not
balanced properly. Kent Magee of ARS hired a design
engineer to review the ac unit issues and provide
proposals for a total system replacement. Proposal #1
for a Carrier unit $158,989.00 Proposal#2, for a Aaron
unit . $ 198.987.00 .After my review of the both
proposals I requested more details on the unit
specifications. Kent Magee sent us engineering data on
the units expected design performance. The data quoted
on the reheat section of the unit a 49% RH level. I
requested the design engineer provide the control
system design intent. What control system will control
the unit? a design print of the system for the installation
showing equipment location, an explanation of how the
system will control set points in the library room. The
engineer that did the design has gone missing Brice
Gordon has contacted Kent Magee on several occasions
and could not get any answers from his design engineer.
Kent Magee is in the process of bringing a new design
engineer on board to handle the design issues because
he is only a installation contractor. Brice is expecting to
hear back from him when he returns from a project in
virgin gorda.
EFTA01146226
Zorro Ranch
• Energy Control Systems, Proposal to replace existing inet
controls & sensors install and upgrade to Delta control
modules to control entire HVAC system.$48.730.56
• SPX Cooling Technologies ,Proposal to replace existing
Marley cooling tower with a stainless steel Marley
cooling tower $22,000.00
• Crest ,Proposal to replace pool pack unit with new
Dectron pool unit option #1 $35,667.00 (3000cfm )
option#2 $43,170.00 (3800cfm) larger unit .The pool
area still has air flow issues in the pool room air ducts in
ceiling soffit have no air flow into pool room supply air
duct needs to be exposed to find blockage on duct
system, or existing system does not have enough (CFM's)
to move air .This needs to be properly balanced by
engineer.
• Beaudin Ganze consulting engineer, proposal to review
entire pool room area testing balancing see proposal for
pricing this should be done if unit gets replaced.
• Pump room pumps for cooling tower ,heating ,all
pumps need to be re balanced, new water seals need to
be installed on leaking pumps need to get good pump
repair machine shop. Brice to get proposals
EFTA01146227
ℹ️ Document Details
SHA-256
2ec001687c4f1acb9ad74004bf78d00a24766bb1153049f0f4d8e2e07c6de31f
Bates Number
EFTA01146225
Dataset
DataSet-9
Document Type
document
Pages
3
Comments 0