BEAUDIN /
July 15, 2013
GANZE
consulting engineers, inc.
Richard Kahn
HBRK Associates Inc.
New York, New York 10022
RE: Zorro Ranch — Pool/Natatorium System Analysis
Project #9357.00
EXECUTIVE SUMMARY
Beaudin Ganze Consulting Engineers was tasked to investigate/analyze and provide recommendations for
the ongoing issues related to the existing pool area/natatorium conditioning system. The Existing system
is not maintaining industry standards or owner/user required space temperature and or humidification
levels. The mechanical system components are not regional and are problematic related to service and
maintenance.
The site investigation determined that the existing pool conditioning unit is currently inoperable and at the
point of diminishing return on repairs versus replacement. Recommendation is replacement with new unit
sized to pool room/Natatorium conditions and desired temperatures and humidity.
Options for levels of replacement are provided within the report for determination of next step. BGCE
always recommends the full modifications to help insure that the end result is a system that function to
the best of the owners expectations. BGCE is also aware that budgetary and scheduling constraints have
to be accounted for.
There are specific baseline modifications that are required for any of the proposed options to perform to
any degree of pool space conditioning. The baseline modifications in general are to provide a vapor
barrier to control moisture migration into the surround structure and to assist in condensate control.
Sincerely,
Morgan Royce, PE
Associate Principal
MBR:mbr
7007 Wyoming NE. Suite F-2. Albuquerque. NM 87109 .p. ALBUQUERQUE
AIBUOIROUE DENSER 10111CORINS JENSON WA
wwwlsce corn
C Istc*of.nibed kAtarlacu Wnsn Eto:acnr Sumseuty6xx
EFTA01083777
Zorro Ranch
Stanley, NM
Pool/Natatorium System Review
PREPARED FOR:
Richard Kahn
New York, New York 10022
BY:
BEAUDIN GANZE CONSULTING ENGINEERS, INC.
7007 Wyoming NE. &Ate F-2. Albuquerque, NM 87109 • p. ALBUQUERQUE
ll BUOLIEROI DOM FORICOUINS
EFTA01083778
BEAUDIN/
GANZE
consulting engineers. inc.
TABLE OF CONTENTS
Section Page
Introduction 3
Existing Conditions 4
Analysis 6
Recommendations 8
Benefit to Cost Comparison 10
Drawings
SUP I 11
SUP Total 12
SUP Option I 13
SUP Option 2 14
SUP Option 3 15
SUP Option 4 16
2IPagc
EFTA01083779
BEAUDIN/
GANZE
consulting engineers. inc.
INTRODUCTION
Beaudin Ganze Consulting Engineers was tasked to investigate/analyze and provide recommendations for the
ongoing issues related to the existing pool area/natatorium conditioning system. The Existing system is not
maintaining industry standards or owner/user required space temperature and or humidification levels. The
mechanical system components are not regional and are problematic related to service and maintenance.
A site investigation/interview was performed in May of 2013 with Brice Gordon. Owner/User requirements
space temperature/humidity and pool temperatures were confirmed and documented for use in the analysis.
Existing conditions were noted and available record drawings were made available for use in the analysis.
Records of repairs, previous recommendations from manufacturer/contractors, and material quotes were made
available for use in the analysis/recommendations.
A ductwork camera inspection was performed by JB Henderson to insure that the existing ductwork was in
good condition and was not collapsed or restricted in anyway. The inspection determined that there were no
obstructions visible and that the ductwork was in good condition.
Calculations have been performed in the selection of the proposed replacement equipment to insure viability
of connection to the existing utilities. Modifications to the existing system are noted within the report.
Wage
EFTA01083780
BEAUDIN/
GANZE
consulting engineers. inc.
EXISTING CONDITIONS
The Pool area was completed Circa 2000. The pool area appears to be an upgrade from the original spa room
design. There is little documentation related to the alterations made between the spa room to the present pool
room.
A pool conditioning unit was installed to provide conditioning of the pool space. The unit's operating
capacity was scheduled to be a Nominal 5 Ton unit capable of 25 pounds per hour of water with 2,400 cfm air
flow at 0.60 inches of external static pressure. The unit power is 208 volt 1 phase 60 hertz with 56 full load
amps and an MOCP of 70 amps (fuse size). The unit is water cooled through the main building condenser
loop system. The unit is designed to draw a percentage of outside/ventilation air in through a common non
pressurized ventilation air duct/plenum that also serves the remainder of the building conditioning systems
with ventilation air. The unit is controlled through a room thermostat/humidistat and is connected to the
building control system. The unit is provided with condensate drainage. The unit is not connected to the pool
heating water system located in a separate area. The unit is fully ducted to the pool room through separate
supply and return galvanized sheet metal duct systems. The unit is located in a central mechanical room
located in the main building adjacent to the gym/pool. Refer to attached SUP 1 drawing for reference.
The pool room is ducted from the pool conditioning unit through a single below grade supply duct (16"
diameter per design) that supplies five floor registers located at sole exterior wall with doors with integral
windows. Return air is ducted back to the pool conditioning unit through two side wall and two ceiling return
grilles located opposite the supply. There is no mechanical exhaust from the pool area.
The pool area is fully enclosed with five French doors leading to the exterior and a single French door leading
to the interior gym. The pool is located on the ground level of the building with one exterior wall, one interior
common wall (gym area) and two sub grade walls (one common to the pool equipment room). Typical wall
construction is concrete. The exterior and interior common walls also utilize steel frame construction. The
pool has solid surface throughout consisting of plaster ceilings/walls and concrete/tile deck. The roof of the
pool is a terrace/porch/deck of the main floor of the building. The insulation values or presence of a vapor
bather cannot be determined or confirmed.
Operating conditions of the pool/spa are as follows:
Unoccupied:
Pool water temperature: 75 Deg F
Spa water temperature: 75 Deg F
Pool Area Space Temp: 85 Deg F
Pool Area Humidity: Max 50%
Occupied:
Pool water temperature: 85 Deg F
Spa water temperature : 104 Deg F
Pool Area Space Temp: 85 Deg F
Pool Area Humidity: Max 50%
Occupancy can occur anytime during the year. Prime period of occupancy is May through September.
Pool Area Conditions relative to size of pool and surroundings are as follows:
Pool Surface Area — Approximately 750 square feet
Spa Surface Area — Approximately 120 square feet
4IPage
EFTA01083781
BEAUDIN/
GANZE
consulting engineers, inc.
Wet Deck Area — Approximately 460 square feet
Room Volume — Approximately 22,000 cubic feet
II
I a
IS
goiairic
Pictures: Natatorium Layout
5 IP a g
EFTA01083782
BEAUDIN/
GANZE
consulting engineers. inc.
ANALYSIS
By simple observation of the pool conditioning unit maintenance/repair records it is apparent that the unit is
not maintaining the pool area at the desired/standard space conditions. The unit is at the end of its useful life
based on standard engineering practice and based on the amount of repairs the equipment has received over
the recent years.
The question is not whether a new unit of sufficient capacity should be installed; it is whether a new unit can
be installed in the existing system conditions and performs as desired/needed to maintain the standard space
conditions. The answer is not likely without additional modifications.
The best way to approach what modifications should or could be performed is to look at the standard design
practices and compare against the existing pool setup.
Indoor Pools or natatoriums are one of the most difficult facilities to design. They are designed for human
comfort and enjoyment. And for this reason they have to consider human health and the health of the
building.
Comfort related to this installation is primarily based on the desired temperature of the water and space. Per
the occupied/unoccupied conditions stated the facility is within standard practices, nothing out of the norm.
Humidity control related to this installation is based to the space relative humidity and is a direct relation to
the comfort conditions and physical conditions of the pool. The optimum condition is 40-60% and is in line
with the requested level. This condition is the primary driver on sizing of the pool conditioning equipment.
Indoor air quality requirements are typically related to commercial natatoriums but recent studies also
recommend for residential facilities. Indoor air quality relates to the chemicals being used in the pool water
quality and the amount of people expected in the pool. Certain pool chemical can produce byproducts that are
best mitigated using fresh air. Fresh air should be introduced into the pool conditioning system at a rate based
on the pool area conditions and intended occupancy. For this project 500 cfm of fresh air is recommended.
With the introduction of fresh air comes a need to maintain a negative pressure within the pool air versus the
surrounding spaces. The negative pressure insures odors common to a pool are contained within the
natatorium. Typical exhaust rates are 20% higher than the fresh air rate or in this case 600 cfm. In natatoriums
with spas it is recommended to locate the exhaust intake closest to the spa to capture the highest humidity air
and reject to the exterior versus conditioning through the mechanical systems. The existing facility currently
has no provisions for exhausting the pool area. Outside air intake is provided but the amount is questionable
since the existing pool conditioning unit is not capable of supplying the need air flow to the space.
Condensate control is less of condensation occurring but insuring it occurs in the right area. Given the
Comfort and humidity factors condensation will occur to some degree. Controlling the degree to which it
occurs is the purpose of the condensate control. The two main factors are building envelope and space air
flow.
Per current design recommendations pool surfaces should be constructed to provide a vapor barrier
and thermal barrier compliant with current codes. The simply means a vapor barrier would be
provided on the warm side of the walls (winter condition) and insulation would be provided on the
exterior side of the vapor barrier. This insures that if condensate does form it does not form within the
building structure causing additional damage to the surroundings. Condensation occurs when air
(water air mixture) comes into contact with a surface temperature below its dew point, essentially the
point at which a gas becomes a liquid. This point and all points for a water air mixture of gas have an
associated vapor pressure. This pressure is what is being controlled by the vapor barrier. If no barrier
6IPagc
EFTA01083783
BEAUDIN /
GANZE
consulting engineers, inc.
the vapor pressure of the water air mixture will permeate through almost any structure or material to
some degree, including concrete. If allowed to condense within the material the material will typical
experience an adverse effect. Most common is cracking, mold, and efflorescence (cement materials).
It is unclear of the insulation level, presence of a vapor barrier or the arrangement of these materials
throughout the natatorium.
On this same note interior surfaces that are likely to produce condensate are washed with supply air to
absorb condensate and increase the wall surface temperature before damage can occur. This is
primary driver in the configuration of the air distribution system. Windows, skylights, areas of low
insulation values require air washing to increase the surface temperature. In large volume pools air
movement or air change rates typically provide for all other wall ceiling surfaces when vapor barriers
and insulation are provided. But area/volumes in ceilings that allow for pockets of stagnant air must
also be air washed or broken up to insure condensate does not form or if it does that it is absorbed in
the air stream and the surface temperature is increased. Pockets of trapped or stagnant are can have
relative humidity levels that can exceed 80% even when the system return is reading 50%. At this
time the only surfaces that are provided with an air wash are the windows.
Health is related to all the factors discussed. If too hot or too cold or too humid it can cause adverse effect to
humans. If condensation forms within structure it can cause mold growth, rust structures, cause excessive un
accounted weight to structures, all potential health concerns.
Natatoriums are also one of the most costly facilities to maintain and operate even when constructed properly
to all design requirements. If anyone of the above factors is not considered correctly then the costs and likely
repairs can spiral out of control.
Sup 1 Total drawing is provided to show one possible complete mechanical solution to the natatorium
conditioning given the current building construction constraints. It does not address the vapor barrier or
insulation requirements.
7 1 Page
EFTA01083784
BEAUDIN /
GANZE
consulting engineers, inc.
RECOMMENDATIONS
The following are mechanical/electrical/plumbing recommendations arranged in order of least cost only.
Ranking of solution is typically directly related to cost but will be discussed later in the report. Costs are to be
confirmed by contractor/supplier and are opinions at this time, not quotes. For any of the option to be viable
certain building element or architectural changes are required. These are considered to be baseline
requirements for any of the options presented.
Baseline:
Provide a water/vapor barrier in the form of a coating that is applied to all the existing interior surfaces of the
pool walls and ceiling (One common Manufacturer is Tnemec). Seal all air leaks from the exterior to interior;
this includes the air leak from the supply duct into the wall cavity at the water isolation valves.
Cost: To be determined by Architect/Contractor dependent on desired final aesthetics of the area but owner.
Picture: Access panel to Wall Void — Air Leakage into chase from supply duct below grade.
Option #1
Refer to SUP Option 1 Drawing
Install a new pool conditioning unit in the exact location of the existing and connect to the existing system
conditions (specifically ducting, condenser water, electrical). The new unit will be capable of removing 36
pounds per hour of water at occupied conditions, 95 MBH total cooling capacity, and 67.1 MBH sensible
cooling capacity at altitude. Unit air flow is 3800 cfm at 1.5 inches external static pressure and with a variable
frequency drive motor for operational turn down during non occupied conditions.
Adjustments to air release rates at the supply diffusers, outside air intake and condenser water flow rate.
Integration of new unit into existing control system for monitoring operation.
Modifications are required to the electrical service at the unit to increase from a 70 amp breaker to an 80 amp
breaker. In addition reconfiguration of ductwork at the unit connections and relocation of
humidistat/thermostat are required (conduit path to be determined).
Cost of Equipment: (quote from Supplier + 2yr Parts/Labor Warranty) $46,171 + NMGRT
8 IP a g
EFTA01083785
BEAUDIN/
GANZE
consulting engineers. inc.
Cost of Installation/Modifications/adjustments to systems: $23,000 +NMGRT
Total Cost: $69,000 +NMGRT
Option #2
Refer to SUP Option 2 Drawing
Same as Option #1 but to include the following:
Install an exhaust fan capable of 600 cfm continuously from the pool area. Preferred location of the exhaust
intake is above the spa. This unfortunately is not economically viable.
Alternate locations of the exhaust fan are:
1. In the wall cavity of the exterior wall (requires access panel, interior/exterior grille, power,
ducting, control).
2. In the Pool Equipment Vault (requires concrete wall cut, grille, connection to existing exhaust
duct, power, and control).
3. Multiple other options dependent on available budget.
Option #1 Cost: $69,000+ NMGRT
Cost of Exhaust: $5,000 + NMGRT
Total Cost: $74,000 +NMGRT
Option #3
Refer to SUP Option 3 Drawing
Same as Option #1 but to include the following:
Install a new return path from the pool with exhaust; utilize the existing return air path as a supply air path.
Pool heating water from the pool conditioning unit will be provided.
The existing wall patch located at the common wall of the mechanical room and pool shall be used as the new
return air path from the pool area. A soffit shall be created to enclose the new return duct with multiple high
return grilles. The path will also allow for piping from the pool conditioning unit to the pool water heating
system. The path will also allow for the relocation of the existing humidistat/thermostat to the exterior wall by
allowing for a conduit path. The existing return air path will be modified to provide supply air to the ceiling
area using the two existing side wall grilles (the ceiling returns will be capped). The exhaust fan will be
located in the pool equipment room.
Option #1 Cost: $69,000+ NMGRT
Cost of additions: $20,000 + NMGRT
Total Cost: $89,000 +NMGRT
Option #4
Refer to SUP Option 4 Drawing
Same as Option #3 but to include the following:
Provide additional supply grilles in the ceiling of the pool area. This would require a fair amount of ceiling
demolition and patching.
Option #3 Cost: $89,000+ NMGRT
9 IP a g
EFTA01083786
BEAUDIN/
GANZE
consulting engineers, inc.
Cost of additions: $8,000 + NMGRT
Total Cost: $97,000 +NMGRT
BENEFITS TO COST COMPARISON
First it has to be stated that the only insurable way that a natatorium can be maintained to user expectations is
through maintenance of the pool temperature and water chemistry. Any drastic change in these conditions will
cause the remaining components to become ineffective. Second is the space temperature and understanding
that the pool conditioning system is selected base on set temperature and humidity points. Alterations to these
points will keep the system from performing as designed.
Baseline requirements if not incorporated will continue to cause degradation of the structure and surfaces of
the natatorium and surrounding areas. It will also not guarantee that the pool conditioning system is size
appropriately.
Option 1 is the minimal modifications that can be done with the hopes of maintaining the natatorium at the
desire conditions. This is less of an option as it is a requirement since the current unit is essentially defunct.
The benefits of the option are a pool conditioning unit that is sized to handle the pool conditions. The negative
to this option is a larger horsepower supply air fan to overcome increased duct static pressure caused by a
necessary increase in air flow to the space. Subsequently air noise through the floor grilles will increase based
on the 50% increase in air flow. It is unclear as to what level of noise will be experienced. This is similar at
the return grilles. It is still likely that the ceilings will form condensation in the winter. It is a guaranteed that
the pool odors will continue to spread to the adjacent spaces of the house.
Option 2 will benefit beyond option 1 by controlling the odors currently released to the adjacent house and
will provide an increased level of indoor air quality. The negative to this option are the same for option I.
Option 3 will benefit beyond Option 2/3 by allowing for additional control of air washing over the ceiling and
reduced noise at the floor registers. It will also allow for a smaller supply air fan motor horse power or
operational point based on reduced duct static pressure (less energy is consumed). The benefit of the heat
rejection of the pool conditioning unit to the pool water heating system is made viable by an easy path of
installation. The negatives to this option are increased cost and modifications to the aesthetics of the space.
Option 4 will benefit beyond Option 3 by provide additional air washing to the ceiling area. The negatives to
this option are increased cost and modifications to the aesthetics of the space.
End Report
10IPage
EFTA01083787
EFTA01083788
art. Lk_
r t.
atesz
+v. -4.+. Ar. )
9.
OUT4 I 1,V Ant p4CT
Wrtir-/•.a
12•XT ill
Fool. LCMCIA1014941-1
UNIT -VErCenat..
air
t J
r
91a
J. {C
-- 100 re Or
TiP 2 4 In
A
Ittr c etr4ANLI worrvief..)
ct ea-rtitra.4 --r-frz
ZORRO RANCH
Stanley. New Mexico
Coore,finte.WA-re-g-
ft...4.i AN° 17 0Weg-
171
P11 ISA NOTES"'
ZO Oar/ or-1 itC4.- S CA
COLME) -Waal' 01 Ye CB-9•fre.L0
/ - FitalgaaMtr.
'Pratt "1 4
efirlit-t• F+1 corr. - LcH, r-4.4cm ex7c:
WAtt- wLectz - T r.0 rt./..0.0
ilk•ToL L.le. 74e
ctot-
Description
foal, bit& 1
erie4 44
1
titrce...e.enapmes
sr.= ) F
as-nAL nseemeni FLoora 14-&-r-1 RAIL TeARSCM-0... A
er..-LLe- W • eicHisier
plaog.+or r Ast IrriNe 7, f
K0
j---....
pi o I1
e
st.4 t4, 5 -S
FICACY ea.
=—aIL`IrcfiiI
:>•9.11
cv-Adin& Key Per
exteAnlexhavni- Date 3.899
&cm petnalif raw • THIS SET OF DRAWINGS LABELED 'SUP', FOR
SUPPLEMENTAL, IS PREPARED BY THE GENERAL
CONTRACTOR AS A SUMMARY OF VERBAL INFORMATION,
10.0 DIRECTIVES AND SKETCHES PROVIDED BY THE OWNER AND
HIS DESIGN CONSULTANTS
EFTA01083789
wrordea fit V4101- fee.
fi
NPW UNIT
Co/toed-I-0
eiwrhey
eoGiCOCe•c7
6 i;1.1_1ht
-
t-tew
ZORRO RANCH
kivuodlit-f- Jortistg.60.1-
Stanley. New Mexico
fa I
(A1-)11-&kit141ri k 5
P.115I-1 '" a; ES
V- 0 cc, woe, -It-Rex' Of 7s Cer.3•S 4e.j1.o
P..62112 212:-L- LArs veArs
NF-T ersotc^ ery- y.
C.71C. LATH.,...icm 247.Z >3
FLctt , _ 7-4.-veAvne rsm2m9
Afro pool 21sTeP. t,,Je 1-1,1
PLAsTful. FY.-
wofutiiiee, I peloCttled .11SI
In FitutaniT
An4 coemedee!
6A L.GOI Description
40 Pool 14ecifoi —4. Vey
epteriemi
it
OVA) walLa- EY•itsd-ar
Tars-Ace
frAiefra wl fkg. ItITAHZ
4 (24:4,243 <-1
kXe.12.Cribq
QS, / ..)•o•nl
r.t KE-7- Ya Date 3 . 8 . 99
-L- THIS SET OF DRAWINGS LABE-LEO 'SUP'. FCR
SUPPLEMENTAL. IS PREPARED BY THE GENERAL
CONTRACTOR AS A SUMMARY OF VERBAL INFORMATION,
DIRECTIVES AND SKETCHES PROVIDED BY THE OWNER AND
HIS DESIGN CONSULTANTS
a
go
°.• 0
El0
1
0
FPM
PAK!' f ie.,SE
3. ZORRO RANCH 13 StatiMI I
BradbarY
00
Stanley. New Mexico
EFTA01083790
-4
1
S
y
0
Bradbury Yin Len Wax.
PART alksEMENr ZORRO RANCH El Stamm I
FL-(=":=Fz. 1=1-.s..14
00
Stanley. New Mexico
EFTA01083791
EFTA01083792
wI µ if-01
L
0 UT4 Dog.
i
i
!reit, f-t Option) ak- ._.
I
(AnclAiot4M-Iti -"\ t
l iI
1-1011*-VEV11/.54.,
imLA-f.ie...sttiett ,
6A-i7
e
-TAtact
let 4-
P+ O
. vie 141 -ty
ZORRO RANCH
Stanley, Nen Mexico
Goppatk76K.WATele_ 11'4
rovveg-
AND im eat i-ti-11.1 .1P
s:CrE.:5 SPA
sunif-4-"TI of-1 4 14-•• G cve
6'; - -rw-vt QM, >a. COL,no cn
Twee.r..car s. 2.)44..5.:4"yar* 3,4(04.
eAtrm Form Ea44171J i'vrto L I r\1 ydr. it. O. ' , VOL. 1-474,
pe,f-w-z-iv Tel - r FA
. .vzAo
Eire/
&TEA IA6 71...e
rt-oSTBR.
Tool wht,
"I
r'17 &XL-WM .1y, Description
4 REV
_
LX.O..
fooL.1-0,4ya I
471.44-evvi 2
r‘lociAl-edt 1-6mi,tt.A. 1flier roc/ ki
f
rA'se-triEnT I=LooFa 9.1
3mzAce-rL i ,
Uhk/e4FrirL teAttniler
44/7 F11
NO. irrin•tce)t
000g- ~CCi 4nO t F11-,+,15
- 7721.'=1. iti=1;•
Li g.;
s exerzcrse
, Cr
p cev
Key Ye: Dote 3.8-99
exPAni exAl •
papi.442 F-frf • THIS SET OF DRAWINGS LABELED 'SUP-, FOR
SUPPLEMENTAL. IS PREPARED BY THE GENERAL
CONTRACTOR AS A S
ℹ️ Document Details
SHA-256
2f01e89d8327054803936639332d222fd836e7bc9d72ab52096c3e8a033ba046
Bates Number
EFTA01083777
Dataset
DataSet-9
Document Type
document
Pages
17
Comments 0