EFTA02649876.pdf

DataSet-11 1 page 220 words document
👁 1 💬 0
📄 Extracted Text (220 words)
From: Larry Visoski Sent: Saturday, Mai... To: Je vacation Cc: Rich Kahn Subject: Gulfstream SAV interior Budget Jeffrey, I received this quote from Rusty back in April ref interior budget nu=bers with Savanah,. Savanah quoted = 1- $779,803 for full wood veneer chang=., 2- $95k for New Carpet„ 3-$200k for 8 Main Cabin chairs ($25k Each) 4-$70k for 2 divans re-cover ($35k each) <=iv id="AppleMailSignature"> =span style='background-color: rgba(255, 255, 255, 0);">Quick budgetary nu=bers from Gulfstream; Here are some high-level estimates Larry take a look and let me k=ow what your plans are. Cabin Carpet Replaceme=t • New Customer approved carpet will be installed on the cabin a=r ducts, seat base shrouds, and the floor from the entry through the aft la=atory Budgetary $95,000 Cabin Single Seats 16g Recover •=Seven (8) existing single seats will be covered in Customer approved materi=l (same as double seats and divan). • Seven (8) re-webb existing=single seat restraints • Plating is not included in this item.Budgetary $200,000 Cabin Divan Three or Four-Place • Two=(2) existing divans will be covered in a Customer approved fabric (same as s=ngle and double seats). • Re-webb four (4) existing divan restra=nts • Plating is not included in this item Budgetary $70,000<=r> Rusty Cramer Regional Sales Manager South Florida Sent from my iPhone Sent from my iPad 1 EFTA_R1_01889799 EFTA02649876
ℹ️ Document Details
SHA-256
2f1e0fed51eb7de421aa052820250fbdd215c2ca4265507702d1a2ecd626dc97
Bates Number
EFTA02649876
Dataset
DataSet-11
Type
document
Pages
1

Community Rating

Sign in to rate this document

📋 What Is This?

Loading…
Sign in to add a description

💬 Comments 0

Sign in to join the discussion
Loading comments…
Link copied!