From: Richard Kahn
To: "Jeffrey E." <[email protected]>
Subject: Fwd: Ken Floyd: VI Paving
Date: Fri, 09 Jun 2017 16:43:05 +0000
Richard Kahn
HBRK Associates Inc.
Begin forwarded message:
From: Ann Rodriquez
Subject: Ken Floyd: VI Paving
Date: June 9, 2017 at 12:07:49 PM EDT
To: Rich Kahn
Begin forwarded message:
From: Ken Floyd
Date: June 9, 201 at
To: Ann Rodriquez <
Cc: Jermaine Ruan <
Subject: Re: LSJ MAP
Good Morning, Ann,
Please do not take offense at anything I am writing here, as you asked me to put down my issues in an email. Primarily, because we
could not have a correspondence call via phone.
It appears we are again at the same place, at a different time.
The only difference is the idea of, "Economy of scale", by holding out the possibility of doing GSG as a reason to give a lower price.
The idea behind a better price due to increased quantities is logical; if the extra work is included in the schedule of values and Schedule
of work.
It appeals the viability of the project hinges on the ability of the owner to maintain a location of privacy, a position of which I respect
and am totally committed.
However, requirements such as these do not mix well with expedition and even more important to me, quality.
In Civil work, especially involving a product such as asphalt, which needs to be protected from fast running water and standing water
in order to last, the underlying surface and water travel need to be addressed prior to application of the final surface course. The roads
on both Islands were not cut with that in mind and need some intense mitigation. From the formation of retention ponds to swales and
low-water crossings.
All of the items will be outlined and a unit cost applied to each activity, which will make any approved changes transparent regarding
cost. This will be in our,
EFTA01043698
Speed and Quality come together at a premium and I cannot put together a price based on Speed, Quality, Economy of Scale and
maintaining privacy for a project in a piecemeal fashion.
I take great pride in performing our work in the best quality possible.
If we perform this work, it will be after an approved price and Project Schedule. In order to provide you with these items, I need to
know what issues I will be faced with and the issues which are not negotiable.
I have no idea of how often or how much notice is or can be provided regarding when privacy is necessary, but it would be productive
to stop work on one island while performing work on the one next door. This is just one proposal.
I am going to have to finish up due to other appointments.
I hope I did not give the impression I don't want to do your project. The opposite is the truth. Want to do an organized, clean and
quality job, nothing less.
Sincerely,
Ken Floyd
On Wed, Jun 7, 2017 at 2:47 PM, Ann Rodriquez < wrote:
Hi Ken,
The owner would like to see the turn out of LSJ "Road Paving" before we proceed with GSJ
We would like to start LSJ asap. Can you please revisit your bid and give us the best deal possible as we
would also like to proceed with GSJ right after our LSJ paving project.
Please advise,
Ann R.
On Jun 7, 2017, at 12:33 PM, Ken Floyd < wrote:
Good Aftemoon,
Both of these sketches are labeled LSG, which I take to mean they are not of GSG. Could I get a scale drawing of the Topo for
GSG?
Thank you very much,
Ken Floyd
On Wed, Jun 7, 2017 at 12:11 PM, Jermaine Ruan • wrote:
With Respect,
Kenneth Floyd, Virgin Islands Paving
General Manager, STT
With Respect,
Kenneth Floyd, Virgin Islands Paving
EFTA01043699
General Manager, STT
EFTA01043700
ℹ️ Document Details
SHA-256
2f7c4ab4499b44d20eba6d0e346e1dcd45d69de1d127b8b3e54c2ecc9cc99fce
Bates Number
EFTA01043698
Dataset
DataSet-9
Document Type
document
Pages
3
Comments 0