EFTA02442152.pdf
📄 Extracted Text (207 words)
To: jeevacation©gmail.com[[email protected]]
From: Silvina Royston
Sent: Tue 4/28/2009 12:36:58 PM
Subject: Re: Concrete Road Mock Up
Jeffrey,
At the airport with Brice to PR to meet potential consultants. Will forward
photo of coral stone stamp before I purchase. I would like to do smaller color
samples for your review prior to the bigger mock up. I will forward range of
colors I am thinking about for your input.
Silvina
Original Message
From: Jeffrey Epstein .com>
To: Silvina Royston
Sent: Tue Apr 28 08:24:46 2009
Subject: Re: Concrete Road Mock Up
Ihave still not seen a photo of the stamp and colored concrete
On Mon, Apr 27, 2009 at 6:31 PM, Jeffrey Epstein <[email protected]> wrote:
ok
On Mon, Apr 27, 2009 at 5:47 PM, Silvina Royston
wrote:
Jeffrey,
With your approval, we would like to proceed with a mock up
of the stamped concrete road design at the turnaround court below the Kitchen
stair and a small portion of the road leading up to it as shown in the photos.
This court has been a difficult one for the vehicles to
maneuver and the triangular stone wall is always constantly banged up.
May we proceed with demo and the mock up in this area?
Regards,
Silvina
EFTA_R1_01516948
EFTA02442152
ℹ️ Document Details
SHA-256
3086a4774f92ee66fe752d99a6614754ee75766269bca3228b540bea1f96894b
Bates Number
EFTA02442152
Dataset
DataSet-11
Document Type
document
Pages
1
Comments 0