EFTA00705547.pdf

DataSet-9 5 pages 936 words document
👁 1 💬 0
📄 Extracted Text (936 words)
From: Richard Kahn To: "jeffrey E." <[email protected]> Subject: Fwd: LSJ Staff Cottage Date: Wed, 22 Feb 2017 15:49:10 +0000 Attachments: LSJ_Staff Cottage_Appliance.pdf; LSJ Staff Cottage_Kitchen Design.pdf; LSJ_Staff—Cottage_Expenditure.xlsx; L-SJ_Cottage_Scope_of liorkstf; LSJ Cottage_Material-Labor_Rev4stf Inline-Images: LJS_Staff Cottage_tile:cabinet.JPG; Staff Cottage_Granite.JPG brice again acting immature when i say something he does not like regarding david and his crew for staff cottage labor i said hourly at $25 would be 20k vs 31k in his proposal so lets do at 25k for this job and then reevaluate brice proposes something below which makes no sense and then his response is to go directly to you when i challenge him as we are both aware he is a big baby and has a tissy fit when he does not get his way....additionally i am a bit alarmed of his strong desire to use David exclusively for everything regarding completion time frames: a) staff cottage - original email below said april 5-12 however brice had issues with tile order and is now saying best case end of april b) gsj cottage - brice to receive ikea and home depot cabinet quotes this week but believes end of april as well Richard Kahn HBRK Associates Inc New York, NY 10022 tel , fax cell Begin forwarded message: From: ZM Subject: Re: LSJ-GSJ Staff cottages Date: February 22, 2017 at 10:33:34 AM EST To: Richard Kahn < Cc: LSJ GSJ I think the best thing is We will speak with Jeffrey when he is on-sight Thank you Sent from my iPhone On Feb 22, 2017, at 8:23 AM, Richard Kahn < wrote: EFTA00705547 not sure how that benefits us at all jee wanted 25k vs 31k with david and helpers doing all the work that implies a 7k cost for GSJ cottage and now our workers are doing demo and assisting where needed i would rather keep this cleaner where david and his men are 100% responsible for both jobs i propose 32k labor both jobs thank you Richard Kahn HBRK Associates Inc. Ne tel fax cel On Feb 22, 2017, at 9:51 AM, Brice Gordon wrote: Rich David proposes the following He will do both LSJ Reno and supervise GSJ Cottage Kitchen and Bath Reno for the proposed labor cost of 32K, this includes his helper LSJ will assist with helpers when needed, i.e. demo at both LSJ and GSJ Start 27th Feb finish April 21st, depending if work is not interrupted due to visit schedule. Can we proceed? regards Stanley, NM Ph: Begin forwarded message: From: Richard Kahn tc > Subject: Fwd: LSJ Staff Cottage Date: January 27, 2017 at 3:39:27 PM EST To: "Jeffrey E." <[email protected]> i reviewed with Brice and summary of rough costs totaling 119,400 are as follows: EFTA00705548 Kitchen Laundry Bath Cabinets 8,000 Lighting (bedroom, under cabinet,bathrooms) 4,000 Appliances (microwave, oven, fridge,dishwasher, washer dryer) 12,100 Blinds (4 doors, 3 windows) 4,100 Paint 1,500 Electrical 4,000 Plumbing 2,000 Miscellaneous 7,000 Materials (per MSI bid) 45,000 Labor - David (not yet negotiated) 31,700 Total Projected Cost of Staff Cottage Upgrade 119,400 Notes: a) MSI material quote has not been negotiated or sourced in USA b) David labor has not been negotiated c) David can begin Feb 8th and projects 6-8 weeks finishing no later than April 5-12 (assumes he will be able to work 6 days per week) d) Should we consider hiring David for $25 per hour or so as his labor number with 2 laborers was 31,000. Brice says that he can also be a big help with other projects such as child, RO buildings, etc e) Brice is receiving a 20% discount on Home Depot cabinets thru Sunday 1) Where will Anna and or Brice/Karen live during renovation Please advise if ok to proceed with 119,400 maximum number that i hope to bring down by 6-8% Thank you Richard Kahn HBRK Associates Inc. I on or c, NY 10022 tel fa, ce From: Brice Gordon < Subject: Re: Quote for Mechanical building Date: January 27, 2017 at 9:37:36 AM EST To: "jeffrey E." < Cc: Rich Kahn < >, LSJ GSJ clIMIMMEMS) Good Morning David Starofsky has located another Contractor for RO and Engineering Compound Shed projects They will need to do site surveyor before forwarding proposals for both Jobs when would it be convenient for them to come to the LSJ to view job. David would also look at finishing Chillax Window job and Flashing on Great Room At this time I am awaiting updated proposals from Buck Steel for Sheds and Expert Builders for foundation work both vendors have indicated I should receive today !!! please advise EFTA00705549 regards Brice Begin forwarded message: From: brice gordon Subject: LSJ Staff Cottage Appliance Package, Kitchen Design 3 Date: January 25, 2017 at 5:08:21 PM EST To: Rich Kahn Cc: LSJ GSJ Rich for your reference, proposed appliance package and kitchen design for Staff Cottage As discussed there a 20% discount for Kitchen Cabinets, which ends on the 29th January. Cabinets, Appliances and tile would ship out of Florida, estimated time for delivery to tropical 4-6 weeks. regards Brice Gordon Begin forwarded message: From: brice gordon ,ec > Subject: LSJ Staff Cottage Refurbishment 2 Date: January 25, 2017 at 5:08:27 PM EST To: Rich Kahn Cc: LSJ GSJ < Rich attached for your review I. Overall proposed expenditure for cottage expansion and refurbishment 2. Scope of Work 3. Materail and Labor costs 4. Interior Tile selection 5. Exterior Tile selection EFTA00705550 6. Cabinet Selection 7. Counter Top Selection Karen would like to review the space before forwarding furniture package let me how you wish to proceed. regards Brice Cordon EFTA00705551
ℹ️ Document Details
SHA-256
3106e1e34cb0bbb4a56cce848716cccaad3002abff4e88870def4fee66336f0b
Bates Number
EFTA00705547
Dataset
DataSet-9
Type
document
Pages
5

Community Rating

Sign in to rate this document

📋 What Is This?

Loading…
Sign in to add a description

💬 Comments 0

Sign in to join the discussion
Loading comments…
Link copied!