EFTA02612275.pdf
👁 1
💬 0
📄 Extracted Text (422 words)
From: 1 <[email protected]>
Sent: Monday, December 3, 2018 4:48 PM
To: Richard Kahn; Kyle reavis
Subject: Re: punch list for work in bathrooms cabana's 1,2,3,&4
efis? kitchen cabanas mike c=ttage. tile main compund NURSERY. gyn doors?Q=A0 windowS?
On Mo=, Dec 3, 2018 at 11:44 AM Richard Kahn
wrote:
Richard Kahn
HBRK Associates Inc.
575 Lexington Avenue 4th =loor
New York, NY 10022
Begin forwarded message:
From: Jay Knoepfel <[email protected]>
Subject: punch list for work in bathrooms cabana's 1,2,3,&4
Date: D=cember 3, 2018 at 11:41:39 AM EST
To: Richard Kahn <[email protected] <mailto:[email protected]»,=brice gordon
<[email protected] <mailto:[email protected]», Kyle reavis <[email protected]
<mailto:kyleusvi=gmail.com»
Cabana #1
1. grout line touch up on perime=er of floor tile
2.
Adjust window to be parallel with tile walls and fabricate trim t= finish tile surrounding window
and paint
3.
EFTA_R1_01808285
EFTA02612275
Glass door install
4.
extend jamb of entrance door and trim=out glass door area
5.
all grout sealed and tile cleaned
6.
finish tile install at door
install shower trim<=div>
7.
decide and in=tall threshold at glass shower door
8.
round shelf and bench edge
Cabana #2
1.
touch up floor=grout in two locations
2.
replace one floor tile under window
3. round shelf edge
4.
extend door jamb and trim =ut to finish glass door install
5.
install glass door
6.
raise floor drain
7.
trim out window and paint trim
8. <=iv style="margin-top:Opx;margin-bottom:Opx">tile threshold with selected=material
Cabana #3
1.
replace wall tile marked with blue tap=
2.
round over =ile edges40=A0
3.
to=e up floor grout where grout line exceeds common dimension
4. <=iv style="margin-top:Opx;margin-bottom:Opx">paint ceiling and drill hole= for lights
5.
=rep door opening and plaster to create finished look
6.
install glass door
7.
final cleaning of tile=and sealing of grout
Cabana =4
1.
replace tile edge at shelf configure door o=ening for glass door
2
EFTA_R1_01808286
EFTA02612276
2.
remove and replace one floor tile marked with blue tape
=li>
round over edges <=pan class="m_-8654375518264686230Apple-converted-space">
3.
raise floor dra=n
4.
install gl=ss door
5.
clea= tile and seal grout joints
=br>
please note
The infor=ation contained in this communication is
confidential, may be attorney-=lient privileged, may
constitute inside information, and is intended on=y for
the use of the addressee. It is the property of
JEE
Unautho=ized use, disclosure or copying of this
communication or any part there=f is strictly prohibited
and may be unlawful. If you have received this=br>communication in error, please
notify us immediately by
return e-mai= or by e-mail to conversation-id 319918 date-last-viewed 0 date-received
1543855709 flags 8590195713 remote-id 878081 <mailto:[email protected]>
3
EFTA_R1_01808287
EFTA02612277
ℹ️ Document Details
SHA-256
31d2cdb06bb4d31d0379c7e5968b176ac7f4c9c6d8ac86814d2a9f62943c9431
Bates Number
EFTA02612275
Dataset
DataSet-11
Type
document
Pages
3
💬 Comments 0