Epstein Residence June 19, 2012
9 East 71st Street
New York, NY 10021
Richard Barnett
Dear Mr. Barnett:
Pursuant to our recent survey the following is our proposal to provide
and install the following equipment and services.
SCOPE OF WORK
:• Disconnect, remove, and dispose of the old 40-ton Carrier
chiller from basement mechanical equipment room.
4• Provide, rig and install (1) new additional 30 ton Multistack
module to attach to the existing chiller.
+ Disconnect, remove and dispose of old BAC Cooling towers
and remote sump.
+ Provide, rig and install (2) new 52-ton BAC galvanized cooling
towers to roof and pipe into existing condenser water system.
+ Provide, rig and install (1) new remote sump (galvanized) in
basement mechanical room and pipe into existing condenser
water system.
:• Change filter media on existing sand filter.
•3 Provide protection to entrance hall and steps for deliveries.
•• All necessary materials and labor to pipe chiller.
❖ All necessary materials and labor to install power wiring for
chiller.
❖ Insulation of all new chill water piping and damaged
insulation that may be disturbed during tie in of components.
o'• Chill water and condenser water balncing.
❖ Rubbish removal and carting away from site
❖ Factory supervised start-up, and one-year warranty on entire
project.
4• Five-year warranty on new compressors (Part only)
+ All labor and supervision to complete the above scope of work.
Price: $357,255.00 Three Hundred Fifty Seven Thousand Two Hundred
Fifty Five Dollars (plus applicable sales tax) Price valid for 30 days.
EFTA01144588
Add/Alternate: Please add $22,656.00 Twenty Two Thousand Six
Hundred Fifty Six Dollars to the above price for the installation of (2)
VFD's to control the cooling tower fans. (BMS system and/or control
wiring is excluded from this price)
Exclusions: Patching, Painting, Overtime, Electrical control wiring, BMS
work and controls/control valves, Filing of permits if necessary, Sales
tax, and any items not listed in our proposal.
Payment terms: 1//3 upon acceptance, 1/3 upon delivery of equipment
and 1/3 upon completion.
Please sign the approval line should you wish for us to proceed with the
above scope of work.
I thank you for the opportunity of submitting this proposal, and I assure
you of my continued personal attention.
We hereby authorize a.d. winston service. to proceed with the following
scope of work.
Accepted By:
Date:
S
alladino
Vice President
2
EFTA01144589
ℹ️ Document Details
SHA-256
338e6866a200e7f4fe1db57eee3f8c99a69d9ecbd68c3a13e2b1ece4c85bad4b
Bates Number
EFTA01144588
Dataset
DataSet-9
Document Type
document
Pages
2
Comments 0