From: Jermaine Ruan
Sent: Friday, January 5, 2018 12:44 AM
To:
Cc: E. Jeffrey
Subject: Fiber update
Attachments: image1.1PG; Untitled attachment 00111.txt
Good evening Rich
The fiber was drawn back to the first manhole, but we were unable to identif= the next manhole that the fiber ran to.
Danny informed me that he was not o= board when the wapa cable was first installed in the generator building. (=n my
recollection it was Micheal Glitten and Gary Moses, the former Electri=n.)
Due to today's lack of progress, Liston has switch up tomorrow schedule in o=der to find the route the fiber to tracing
back the fiber from the existing=manhole. The manhole is schedule to be cleaned and Liston will have his guy=go into it
afterwards and trace back the fiber that way.
1
EFTA_R1_01691695
EFTA02542104
ℹ️ Document Details
SHA-256
33b3d483731a4763b1e65bd994bfc3d74395e10b51abfc198feadbeb59067f0b
Bates Number
EFTA02542104
Dataset
DataSet-11
Type
document
Pages
1
💬 Comments 0