📄 Extracted Text (214 words)
From: brice gordon < >
Sent: Thursday, January 26, 2017 3:39 AM
To: Jeffrey Epstein
Cc: Rich Kahn; LS1 GSJ
Subject: LSJ: RO Plant HP Replacement
Good Evening
In 2015 TSG recommend=d the replacement of the High Pressure (HP) Pump on the LSJ RO Plant.
Noting after Repeater for Profibus was installed we wer= unable to access plant remotely.!!!
This was resolved by, by-pa=sing TSG Login Protocol.
Since then we have been able to ob=erve the Plant Remotely in Automatic Operation.
T=is has shown that the HP Pump Operational Oil Temp is Very High - Indicati=g Salt Water has probably got to the
bearings and crank on the Pump
Operational Pressures of the Front End of the Membranes is Close to=Critical 931psi, Normal 800 psi
The condition of =he Pump is effecting the ability to meet Consistent Water Quality.
Long story short the Pump needs to be replaced, lead time=8 to 10 weeks TSG Proposal Replacement with New Pump -
$77,300.0= TSG Proposal to Refurbish Existing Pump - $67,000.00 (estimated=
TSG also recommending the replacement of 3 Contr=l Panels @ $34,450.00, I still need to confirm this is required.
Requesting approval to move forward with replacement of a N=w HP Pump and PLC for RO Plant
Can we proceed?
Brice Gordon
1
EFTA_R1_01316101
EFTA02345811
ℹ️ Document Details
SHA-256
3425c883a31b8615c8f69f2b00e441cf552bfb86029db1454543283865439495
Bates Number
EFTA02345811
Dataset
DataSet-11
Document Type
document
Pages
1
Comments 0