EFTA01118798
EFTA01118801 DataSet-9
EFTA01118802

EFTA01118801.pdf

DataSet-9 1 page 346 words document
V16 P23 P17 P19
Open PDF directly ↗ View extracted text
👁 1 💬 0
📄 Extracted Text (346 words)
Capital Improvements Zorro, 71st Street & LSJ 71st Street Description of Work Vendor ski Notes 1 Replace 6th Floor Electric Breaker Laredo Electric 1,742.00 2 Fire Alarrn Panel Upgrade Sawyers 55,780.00 3 Server room condenser piping to AC AD Winston 12,514.00 4 Front Hall entrance lighting Bid # 1 Simply Elegant 14,730.00 Complete Bid Bid # 2 Laredo Electric 6,619.60 Electric Fixture & Labor Only - need scaffolding & painting Both vendors bidded different light fixtures 5 Chiller & Cooling Tower Upgrade Bid # 1AD Winston 357,255.00 Union Bid Bid # 2 Pierpont Mechanical 330,000.00 RB says bid is missing electrical & protection - Union Bid Bid # 3Crystal Comfort 219,000.00 Per RB vendor lacked knowlegde / Per Merwyn his contact has left company - Non Union Bld Bid # 4'Power Cooling Expected by Sep 11th - did walikthrtion 8/31 - Non Union Bid 6 Skylight Glass Upgrade Suburban Sunrooms 60,800.00 Replace all glass and exterior aluminum caps on existing LSJ Description of Work Vendor Bid Notes 1 Library Chiller Atlanta Refrigeration Bid # 1 158,989.00 'Carrier equipment Bid # 2 198,978.00 Aaon equipment Zorro Description of Work Vendor PLd Notes 1 Replace limestone on terraces with concrete 3B's 35,450.00 2 Installation of 60 mil membrane 3B's 10,000.00 3 Stucco repairs 3B's ?? lime and materials basis - labor @ $100 per hour 4 Telephone System Brice Bidding Work need more data to complete 5 Telephone System Bruce - Panasonic 27,306.25 Panasonic KXTDE 100 Converged IP-PBX System 29,615.09 Panasonic KXNCP 1000 Pure IP System 6 Telephone System Richard Boltz 84,331.00 Did not include Main House phones 7 Remove Ponderosa pines at fron entrance Aspen Landscaping 3,625.25 Hourly rate $25 / 136 hours - Brice plans to 9/6 8 Remove Vegetation from rear flower beds Aspen Landscaping 3,731.88 Hourly rate $25 / 140 hours - Brice plans to 9/6 9 Wells Brice to update HGS 42,436.75 Well #1 - 25k paid to date HGS 99,121.00 projected cost - billed 64,370 10 Rich Bamett Mechanical Inspection bids pending - see outline and RB report under separate email EFTA01118801
ℹ️ Document Details
SHA-256
397a0f2a400e2c006c01a973a2a3b9adcfc41c5aaba2d381979910e0b9be13e3
Bates Number
EFTA01118801
Dataset
DataSet-9
Document Type
document
Pages
1

Comments 0

Loading comments…
Link copied!