Preliminary Budget for Dining Room & Painting of 2016.10.24
Various Rooms, Revision One
PROJECT: Dining Room at Townhouse DESIGNER: Alberto Pinto Interior Design
LOCATION: 9 East 71st Street, New York, NY ARCHITECT: N/A
TRADE SUMMARY BREAKDOWN KEY
1 GENERAL REQUIREMENTS $101.925 F/I Furnish and Install
I/O Install Only
2 SITE WORK $8,690 RIO Remove Only
F/O Furnish Only
3 CONCRETE NIC D/F Design and Furnish
NIC Not In Contract
4 MASONRY NIC TBD To Be Determined (NIC)
FBO Furnished By Owner (NIC)
5 METALS $9,160 ALT Alternate (Add/Deduct) (NIC)
Allowance
6 WOOD AND PLASTIC $214.600 "' Note
7 THERMAL AND MOISTURE PROTECTION NIC
8 DOORS & WINDOWS $26.200
DOCUMENTS
9 FINISHES $316.230
Refer to the list of the bidding documents
10 SPECIALTIES $24.730 in the bottom of proposal
11 EQUIPMENT NIC
12 FURNISHINGS $7,470
13 SPECIAL CONSTRUCTION NOT USED
14 CONVEYING SYSTEMS NOT USED
15 MECHANICAL $600
16 ELECTRICAL $33.660
SUBTOTAL $743.265
OVERHEAD & PROFIT $104.057
INSURANCE $21.180
TOTAL BID PRICE $868,502
1/14
EFTA00591818
EFTA00591819
EFTA00591820
EFTA00591821
EFTA00591822
EFTA00591823
EFTA00591824
EFTA00591825
EFTA00591826
EFTA00591827
EFTA00591828
EFTA00591829
EFTA00591830
EFTA00591831
ℹ️ Document Details
SHA-256
39d62f248460075b236b40bcae58b5fd4992e259387a6c3be6ea298b8e475323
Bates Number
EFTA00591818
Dataset
DataSet-9
Document Type
document
Pages
14
Comments 0