From: LAllenby •
To: NYC - Jeffrey Epstein <[email protected]>
Cc: NYC - Richard Kahn < >, "Allenby, Leighton" <a>
Subject: Fwd: 358 El Brillo Way
Date: Tue, 18 Aug 2015 11:32:41 +0000
Can we do soil boring and testing tomorrow / wed at PB that was approved?
One day project
Leighton Allenby
Director of Properties
Begin fonvarded message:
From:
Date: August 18, 2015 at 7:27:07 AM AST
To: LAllenby
Subject: Re: 358 El Brillo Way
It will take one day to do the boring test.
We will set up a 14 foot tall tripod in the middle of the backyard where there is currently one patio stone
Sent from my iPhone
On Aug 18, 2015, at 7:12 AM, LAllenby l> wrote:
One or two days?
Leighton Allenby
Director of Pro erties
On Aug 18, 2015, at 7:08 AM, wrote:
I just spoke to the engineer and they could mobilize and do the soil boring test tomorrow which is
Wednesday if that is acceptable.
Please let me know and I will confirm the schedule with them
Sent from my iPhone
EFTA00848486
On Aug 17, 2015, at 10:37 PM, Leighton Allenby < wrote:
If Mr. Epstien isn't coming this week can they do sooner - I am trying to find out
Leighton Allenby
Director of Pro erties
On Mon, Aug 17, 2015 at 5:14 PM, < wrote:
Leighton,
I met with Nutting Engineers this afternoon at 358 El Brillo and discussed the location of the soil boring test and the
damage it may cause to the site. It will be sand from the boring auger on a large tripod of which we will contain on
tarps. We discussed this work in detail with Janusz and he informed us Mr. Epstein may be visiting this week so I
scheduled the work for the following Wed.
I have contacted all of my subcontractors and we should have all the work quotes ready for you late tomorrow
afternoon.
Thank you,
Dan
----Original Message
From: Leighton Allenby <
To: labontedw >
Sent: Thu, Aug 13, 2015 11:07 am
Subject: Re: Wind mitigation report
price both ways please - thanks
Leighton Allenby
Director of Properties
On Thu, Aug 13, 2015 at 10:59 AM, < wrote:
He told me the existing louvered shutters are not Miami Dade approved.
He said we could use armor screen rather than rigid shutters if you are interested in that option
Sent from my iPhone
On Aug 13, 2015, at 10:52 AM, Leighton Allenby < wrote:
can they certify any of the items that AIG would accept instead of replacing?
Leighton Allenby
Director of Properties
On Thu, Aug 13, 2015 at 10:16 AM, wrote:
Leighton
I just met with
EFTA00848487
All American windows and shutters, I asked him to provide alternate pricing with options along with pricing
to replace the front and rear doors.
He will be sending us an itemized quote with a brochure of the products they're proposing to use.
They are the company that did the original shutters on the house 10 years ago.
Thank you
Dan
Sent from my iPhone
EFTA00848488
ℹ️ Document Details
SHA-256
3b419a6639c02bf40752703835edd18757fea48d1d195095053747c2f37ddf04
Bates Number
EFTA00848486
Dataset
DataSet-9
Type
document
Pages
3
💬 Comments 0