EFTA00582502
EFTA00582503 DataSet-9
EFTA00582504

EFTA00582503.pdf

DataSet-9 1 page 122 words document
Open PDF directly ↗ View extracted text
👁 1 💬 0
📄 Extracted Text (122 words)
Ms. Maxwell: I spoke to Frank Steele this afternoon regarding the PB staff housing. The following is an update since his report was received yesterday: Approval was received today to continue with construction providing we add an additional steel rebar (tie bar) across the top of the cement block for structural integrity. Mike was required to provide engineering calculations for the design which were approved. Frank stated the cost is minimal however we've lost a week of construction time. Contractors will be working on both sides of the screen wall Saturday. Frank would like to be advised when a decision is made regarding the 4' wall You should have a copy of the report however I'm attaching it... Attachment Converted: "c:\eudora\attach\FAPB5-31-01.efx" EFTA00582503
ℹ️ Document Details
SHA-256
3b9b82a622d255cb4d00d191425c14e35b93423e72df47c65071202aff9803e4
Bates Number
EFTA00582503
Dataset
DataSet-9
Document Type
document
Pages
1

Comments 0

Loading comments…
Link copied!