EFTA01131092
EFTA01131093 DataSet-9
EFTA01131095

EFTA01131093.pdf

DataSet-9 2 pages 359 words document
P17 V11 V16 P22
Open PDF directly ↗ View extracted text
👁 1 💬 0
📄 Extracted Text (359 words)
3B's LLC 4600 Lincoln rd. NE Albuquerque, NM 87109 232-9494 Brice, Here is a price to remove the limestone and concrete for the terraces. Balistre removed and reinstalled. Remove existing limestone from deck(s). Remove concrete by sawcutting and light chipping as to not damage the deck or membrane further. I will use a lift to get the pieces down from the terraces safely and efficiently which will be by hand. I will use material lifts to remove the banisters safely. The sections will be cut along each joint and removed. Dispose of demolition materials on the property. Clean area Materials 0.00 Lifts 2000.00 Labor Supervision 2800.00 Demo 6 guys 12 days 15,000.00 Cleanup 2 guys 2 days 350.00 Work comp $ 3600.00 Plus markup $ 28,850.00 plus tax This work is labor intensive because of the limited access to the work area, and the nature of the project. There is a thermoplastic membrane under the concrete, and we can install a new one on top and mechanically fasten or fully adhered (glue down the new membrane). The cost of a new liner is about 6.00 a sq. foot installed or about $ 12,000.00 New deck on east terrace. Material 35 sheets treated 4x8 3/4 plywood 43 2x12x16 treated 25 2x12x12 treated 27 2x4x16 treated EFTA01131093 9 2x4x12 treated Miscellaneous materials (nails, glue, deck screws, etc...) $8,500.00 Install liner on top of new deck. Deck to have minimal slope of approximately 1/8" sloping east Labor Supervision 1800.00 Mobilization and prep 2 day 700.00 Installation of new deck 5 guys 6 days $7,200.00 Cleanup 2 guys 2 days 350.00 Travel for entire Job 20 days (per diem, gas) 4,200.00 Work comp 2500.00 Plus markup 4700.00 $ 20,400.00 plus tax Project will take approximately 20 days to complete. Additional cost for unforseen circumstances, once the linestone and cement are removed. No electrical, plumbing or HVAC in quote Total for job is $69,750.00 plus tax includes roofing membrane and deck, materials and labor. Does not include modifications or alterations to the gutter system. We can start Monday September 24th Please call me if you have any questions at Thank you, JJ Blea EFTA01131094
ℹ️ Document Details
SHA-256
3c7535a9aa759eb130a03a471d064391e45b451387417ba1a39da6656c25f9e4
Bates Number
EFTA01131093
Dataset
DataSet-9
Document Type
document
Pages
2

Comments 0

Loading comments…
Link copied!