EFTA00597769
EFTA00597775 DataSet-9
EFTA00597777

EFTA00597775.pdf

DataSet-9 2 pages 174 words document
P17 V11 V16
Open PDF directly ↗ View extracted text
👁 1 💬 0
📄 Extracted Text (174 words)
Asencios Construction 3-3-17 Date: 6501 Red Hook Plaza Little St. James Project: At& Maintenance Work Shop ASE CI S St Thomas, VI 00802 Bldg. CONSTRUCTION Phone # 340-774-0888 Manager: Brice Gordon Asencios Const. Contractor: Proposal Lithe St James As per drawings LITTLE ST. JAMES MAINTENANCE AND WORKSHOP BUILDING PROJECT Date9-15-15 Drawn by K.R.B Approved by J.P.W. Project # 15-001 All concrete work included All labor and material included . All lay out included Excavation not included Included labor, Insurance, miscellaneous tools.. TOTAL: $ 268,180.00 Signed: Date: Owner EFTA00597775 Asencios Construction 3-3-17 Date: 6501 Red Hook Plaza Little St. James Project ar" Maintenance Work Shop ASENCI•S St Thomas, VI 00802 Bldg. CONSTRUCTION Phone # 340-774-0888 Manager: Brice Gordon Asencios Const. Contractor: Proposal Little St. James As per drawings LITTLE ST. JAMES MAINTENANCE AND WORKSHOP BUILDING PROJECT Date9-15-15 Drawn by K.R.B Approved by J.P.W. Project # 15-001 All concrete work included All labor and material included . All lay out included Excavation not included Included labor, Insurance, miscellaneous tools.. TOTAL: $ 268,180.00 Signed: Date: Owner EFTA00597776
ℹ️ Document Details
SHA-256
3e0b490e1e97acfae528a23e2147fd48f869cb92f14e79afd6d604057e6f9677
Bates Number
EFTA00597775
Dataset
DataSet-9
Document Type
document
Pages
2

Comments 0

Loading comments…
Link copied!