Amendment #4 Page 550 of 868
liner Coptcnti.
Cur solar energy projects for which we have Ion-term debt otigations are included in these financed statements We typically finance our soar energy projects through
specific debt secured by the ert *vs assets including movable arc immovable properties bah present and fuure and snare cannel Typically. tnese financing
arrangements provde for a credit facility used fa a construction which upon completion is convened into term debt
As al December 31. 2014 term debt includes the below
Local currency loan availed from Internetanis Finance Corporation Munbai tranch India a repayable in 29 half yearly installments commencing from 15 Apes 2014
The loan carnes an interest rate equal to the Rupee Based Fixed rate on the date of each disbursement and the relevant spread (cute:Ivy at 1215% and 12 41% per
anrurn) The Lind dosed balances of the Company's credit facilities we thinly:, to annual commitment fee of 0 5% per annum There are ro undrawn credit faced es as
at December 31, 2014 and INR 334 134 477 as a: December 31, 2013
Local currency loan availed from PTC Inca Financial Sery cies Limited is repayable in 59 quarterly instalments commencing from 15 October 2cri 3 The loan carries
an interest rate equal to the Rupee Based Foe(' rate Ce, the date of each disbursement and Ire relevant spread (currently at 12 75% per aman)
The Company red not comply with a covenant in connection with the ioan availed from International Finance Cciporaton which was required that the project financial
completion date be met on or before 1 April 2015 The Company waned an extension to a period o 180 days from 1 April 2015 it is protatie that the Company we
meet the requirements within the grace period and accadrgy the outstanding man balances have been continued to be classified as noncurent to the exert rot
repayable wart n one year
As at December 31, 2013 term debt included Ire below
Local currency loan availed from Irdustnal and Cornmeroal Bank of China. hlumbai branch is repayable in August 2014. The Company reps d tie loan on 2 Jarman,*
2014 The loan carried an reefed rate of 11 20% per annifin The loan was secured against a standby letter of credit of 525 melon issued by CDC Zhejiang Provincial
Brooch to CBC Mumbai Branch This standby letter of creme is issued by ICBC Zhejiang Provincial Branch to the Company with no recOule Prepayment charges
anoint ng to INR 24.000,096 during the year ended December 31, 2013 are included under interest expense
The term debt agreements conga n certain representations, covenants and warranties of the borrower including limner:ions on business achwhes, guarantees and
onwormereaI issues req./foments The fair value of the outstanding debt obligations approximates carrying value
The term loans are seosed by substenhaily all cl the Company's assets
Maturfdos
Tre aggregate amounts of payments on long-term debt due alter Detente, 31 2014 we as knows
2016 2016 2017 2010 2010 Thereaftet Total
INR
Maturees of debt 83 801640 86 012.448 90.566.720 97.792 530 104.844 406 1.173.403.460 1.633.423.204
F-230
http://cfdocs.btogo.com:27638/cf/drv7/pub/edgar/2015/07/20/0001193125-15-256461/d78... 7/20/2015
CONFIDENTIAL - PURSUANT TO FED. R. CRIM. P. 6(e) DB-SDNY-0058507
CONFIDENTIAL SDNY_GM_00204691
EFTA01366979
ℹ️ Document Details
SHA-256
3f42763a567d2ffc8de4938eb693075d499731884413195d639f7bd1ca3fd6d5
Bates Number
EFTA01366979
Dataset
DataSet-10
Type
document
Pages
1
💬 Comments 0