From: jeffrey E. <[email protected]>
Sent: Tuesday, January 19, 2016 12:02 AM
To: Richard Kahn
Subject: Re: FW: Palm Beach Renovations
talk to me tomrow
=div class="gmail_quote">On Mon, Jan 18, 2016 at 6:55 PM, Richard Kahn <
cmailto:f > wrote:
>I spoke with the Brian Arrandale, the new GC you found on El Brillo Way=br»
>We reviewed the following:
>1) Sea Wall / Dock - original quote (see attached) from Dan Labonte did=br»not have vendor name so I was
unable to contact directly
> A) would you like Brian to quote same scope =f which is to just repair
>existing structure (see attached)
> B) quote demolition of existing dock, remove=existing floating seawall
>footer sheets, construct new seawall in front of existing seawall with =1
>(or another size) wide dock, install new 122 x 122 concrete p=les,
>install new travertine on new boat dock and install boat lift
>2) Windows - Brian is reaching out to window vendor to obtain photos to=br»show you as they will be slightly
different that existing wood windows<=r»due
>to heavier framework to support hurricane impact ratings
• -> Note lead =ime 16 weeks for windows
>3) Spa Room - Work will take approximately 2 weeks..
> A) quote from Palmer Marble and Tile Inc to =rovide materials and labor
>for Spa room floor with 182 x 182 white carrerra marble tiles=br> > =C2 9,414.=0
• Brians crew will=remove carpet, the baseboard molding on the floor as
>marble needs to go under it so it can expand and retract (based on time=-
>estimated -> 3,000.00
=C2 =AO =C2 =AO =C2 =AO =C2
Subtotal =A0 12,414.00
=C2 =AO =C2 =AO =C2 =AO =C2
GC FEE 15% =A0 1,862.55
=C2 =AO =C2 =AO =C2 4 14/0 =C2
Total Cost =A0 14,276.55
> -> I have attached photos of existing bat=room white carrerra tiles -
>note floors are honed down with sealer and are a slightly lighter color=br»then the walls
> -> Karyna advised Brian that she would li=e to use darker wall color on
EFTA_R1_01587954
EFTA02475021
>Spa room floor - Please confirm this is ok
>
>
>4) Bedroom Floor Joints
>
> -> Plan is to pull up carpet and preserve=so it can be reused, then cut
>out plywood that is sinking and view from 3 sides (2 bedrooms and
>hallway), bring floor up and support
> -> Estimated cost for time and materials =,000 - 10,000
>
>
>Brian can begin Spa Room and Bedroom on Wednesday January 20th
>Please advise if ok to proceed
>
>In addition please advise scope of work for sea wall / dock and if dark=r
>carerra marble for floor is ok
>
>Thank you
>
>
>Rich
>
>
>On 1/15/16, 2:23 PM, "Janusz Banasiak" < <r- > wrote:
>
»Fii Rich here they are
>>
»
»
»
»
»
»
»
»
»
»Sent from my iPhone
please =ote
The information contained in this communication is confiden=ial, may be attorney-client privileged, may constitute
inside informati=n, and is intended only for the use of the addressee. It is the propert= of JEE Unauthorized use,
disclosure or copying of this communica=ion or any part thereof is strictly prohibited and may be unlawful. If =ou have
received this communication in error, please notify us immediat=ly by return e-mail or by e-mail to
2
EFTA_R1_01587955
EFTA02475022
[email protected] <mailto:jeevacation@gmail=com> , and destroy this comm=nication and all copies thereof,
including all attachments. copyright -=11 rights reserved
3
EFTA_R1_01587956
EFTA02475023
ℹ️ Document Details
SHA-256
3f55063844acf186b499b4373cddbe5bc3dd159dbf7c3721b1af4b9c7e6d6f92
Bates Number
EFTA02475021
Dataset
DataSet-11
Type
document
Pages
3
💬 Comments 0