📄 Extracted Text (3,814 words)
f-urs r iv tencisdpanicin 'aura pi - I - Rani:not MC WI t 1W I 1/ 1.3
21- MICROWAVE & START. END EST.COST Naga PHOTO STATUS
ll
4/27/13 - JE requested to investigate Microwave option Awaiting
5/9/13 - Existing Microwave details forwarded to JE, RK & JR Direction
5/16/13 - JE requested contacting Dava Baumann reference on E Mall
delivery of service from Sandia Crest verses D Mark dated
5/17/13 — Dava Baumann forwarded details of RSM —Craig 10/10/13
Franck. Brice has been In contct with Craig
5/24/13 — Received bid from Southwestern Wireless, have call
set up for 5/28/13 to review bid
5/31/13 — Forwarded update of Project to JE, RK & JR
6/8/13 — Forwarded 1W Telecom proposal for Delivery of Service
to JE & RK. Firm bids due 6/14/13
6/14/13 — Received bid from Southwestern Wireless confirming
details. Informed JE, will forward once all details confirmed
Approval JE 8/20/13 — JE approved Southwestern Wireless bid.
RK to negotiate final bid
6/27/13 - Southwestern Wireless unable to deliver bundled T1
6/28/13 — Looking into other options
7/12/13 — Awaiting proposal from Advanced Communcations
Will review proposed Link Plan with JE on site
8/14/13 — Proposal received
8/15/13 —Conference call completed with RK, BG, SD & RB
8/17/13 —Advanced Communcations on site to review Project JE
8/18/13 — Confirming Advanced Communcations require Service
Provider before their can engineer final solution
8/26/13 — Filed a complaint with PRC NM regarding Century Link
backing out of Service Provider option. 10 days to respond
8/27/13 — Contacted Steven Grabiel (High Speed Internet
Edgewood) Expect Proposal 8/6/13. Will forward once in hand
8/29/13 — Received Proposal from RMC for x 3 40ft poles
Page 1
EFTA01124755
Zorro Development Corp - Project Report 10/11/13
9/17/13 — Received Proposal from High Speed Internet.
$500.00 per mth for 10 mbps plus $10000.00 to run Ethernet
Cable to Tele Beeper shed on Sandia Crest
Aooroval JE 9/19/13 —JE approved site vast by HugesNet
9/20/13 — Have forwarded info to HugesNet, awaiting installation
date. Order #5709982. Once installation is complete & account
active, final details of package will be added.
9/23/13 — Received proposal from Advanced Communcation
on upgrading Router & Wireless Links to RC & Lodge
9/27/17 - Forwarded to RK & DI proposals from RMC Electric
& Advanced Communcations.. Awaiting direction
9/30/13 — HugesNet due on site
10/2/13 — Postponed HugesNet until direction provided
10/10/13 — Proposal from Advanced Communcations forwarded
to JE. RK is to review. Awaiting Direction
Page 2
EFTA01124756
Zorro Development Corp - Project Report 10/11/13
22 - LANDSCAPING START END EST.COST y NOTES PHOTO STATUS
.. •
06/01/13 $75,000.00 3/28/13— Refurbishment & Mainteance Proposals from 3 Awaltin
com .•- ies forwarded to RK & DI Direction
....v.i; • 7/13 — JE ap . roved Aspen for Refurbishment Pro ect & As . - n on
to remain as ZDC Mainteance Corn.= E Malls
5/9/13 New P ...- - forwarded to JE, RK awaitin direction dated
5/16/13 — Final proposal forwarded to RK 08/22/13
5/24/13 — Aspen agreed to $75,000.00 09/26113
5/31/13 — Deposit of $44,383.08 issued to Aspen 09/27/13
8/1/13—P • .: Started
6/8/13 — Work continues, soil preperation in progess
14/13 — Plant material starti . to arrive
: 18/13 — More • lant materail on site
• 1/13 — Back Parking Area - Planting & Irrigation Complete
6/22/13 — Planting & Irrigation continues — attached photos
; ; 13 — More material on site
• 7/13 — Preperation of front parking area begins, Columbines
& Trum• - Vine nted a • . • - . - between MH &D.. Pen
I '. ation installed in all • lanted areas — attached ehotos
7/12/13 — Plant & Irrigation installation continues —
nt schedule & os
7/26/13 — Project 90% Complete
Havi issues locati Trees.
/13 — JE decided not to install Cypress Trees, in lu Aspen will
remove 4 old Hawthorns & replace with 4 Junipers
8/9/13 — Final Breakdown of Project forwarded to JE
8/1W13 — JE to meet Jose from Aspen to review Project
8/11/13 - JE updated request - remove old Hawthorns & Junl
8122/13 - Forwarded to JE suggested colourful plant,
material selected for discussed areas - awaitin direction
Page 3
EFTA01124757
corro uevelopment b-orp - rrotect rceport iun in .1
-7 -- 8/24/13 - Awaiting Proposals - 3 vendors for Preventive Spraying
& Fertilizing of new & exisiting plant material due by 9/24/13
9/16/13 — Aspen Landscaping removed old Hawthorns & Junipers
attached photos
9/22/13 —Awaiting Direction
9128/13 — Forwarded to RK 3 Proposals for Preventive
Spraying & Fertilizing
9/27113 — Forwarded to JE & RK photo of proposed Blue
Spruce 8 — 7 ft, larger would be available in the Spring
10/4/13 —Awaiting direction
Page 4
EFTA01124758
Zorro Development Corp - Project Report 10/11/13
22A - LANDSCAPE START MR EST.COST NOTES STATUS
LIGHTING
7/13 —JE Approved New Landscape Lighting Pending
5/1/13 Unable to move forward until Project 22 — Landscaping Completion
has been resolved
1/13 — Reviewing with Aspen about plant location
7/18/13— Have installed Lighting where planting is complete
7/27/13 — Before proceeding will review with JE on site
8/22/13 — Will Complete Project once Project 22 — Landsca
MH Complete
Page 5
EFTA01124759
Zorro Development Corp - Project Report
32B IN HOUSE - START
10/11/13
END E$T.COST NOTES
LANDSCAPING PHOTO STATUS
06/03/13 4/27/13 — JE Approved, removal of dead Pine in courtyard,
Awaiting
removal of Ponderosa Pines, Landscape Lighting at front
Vendor
Enterance & to relocate Pinons to the area
to be on
6/3/13 — Project Started
afte
6/18/13 —Removal of Pine & Ponderosa Pine complete -
10/12/13
attached photos
7/19/13 — Relocation/Installation of Pinons from remote areas of
the Ranch to front enterance continues
7/27/13 — Project 90% complete, will review with JE while on
site
8/21/13 — Reviewed area with JE, outlining scope of work
8/29/13 - Removal of dead & infected Pinions — Complete
9/18/13 — Forwarded to JE & RK estimate — hand dug & plant
Pinions by Aspen Landscaping $375.00 per tree
To purchase & plant locally 8ft to10ft trees $150.00 per tree
Estmated number of trees, MH —12, LV —14
9/22/13 —Awaiting Direction
Approval JE $5,040.00 9/24/13 — JE Approved purchase of local
Pinions at $150.00 per
tree, awaiting proposal due 9/30/13
9/30/13 — Received proposal, reviewing with vendor
10/2/13 — Forward Proposal to JE & RK
10/3/13 — Working with Vendor to schedule start date
10/10/13 — Approved contract withdrawn by Vendor, unable
to
provide enough Pinions
10/12/13 —Another local vendor will be on site to review projec
t
Page 6
EFTA01124760
Zorro Development Corp - Project Report 10/11/13
24-MEDIA ROOM START Q4Q EST.COST NOTES PHOTO
CURTAINS STATUS
I.
Blackout & Rings $8,282.08 4r27/13 - JE Selected Fabric for Project Awaiting
5/10/13— Project Request Form forwarded to JE & RK Direction
5/17/13 — Resubmitted Project Request Form to JE
5/31/13 —As of date Awaiting Direction
25 — OFFICE START eV EST.COST NOTES
CURTAINS BEM AIMS
Lined & Rings $2,527.01 4/27/13 — JE Selected Fabric for Project
Awaiting
srrn — Vendors & Manufacturer enable to provide enough Direction
yardage of selected fabric on
5/9/13 — Another fabric option forwarded to JE Forwarded
5/10/13 - Project Request Form forwarded to JE & RK E Mail
5/17/13 - Resubmitted Project Request Form to JE dated
5/31/13 - As of date Awaiting Direction 05/17/13
Page 7
EFTA01124761
Zorro Development Corp - Project Report 10/11/
27 - TERRACES START , END EST.COST 13
Terraces - $52,000.00 04/07/13
NOTES 'PHOTO STATUS
$56,200.00 12/12/12 — Bid received.
Stucco/Gutters/Painting Awaiting
3/20/13 -JE Approved Bid
$4,200.00 Proposal
4/7/13 - Project Started
from
4/20/13 — Libary Membrane installed
3 El's
5/10/13 — Change Order Submitted by Vendor $2,700.00 + tax
5/16/13 — MBR Balustrade reinstalled
5/20/13 — MBR Membrane to be installed
5/31/13 — A fault in 1 roll of material, vendor has reordered
6/14/13 — Membranes & Gutters Complete — attached photos
6/21/13 — Stucco & Painting Complete — attached photos
6/24/13 — Final review on completed work with Vendor
72/13 — Final Punch Out to begin of all outstandirs work
7/3/13 — Project Complete on Telescope Terrace
8/8/13 — JE requested carpet to be installed on both terrac
Carpet -$2,078.15 es
8/17/13 — JE selected carpet, 1 selection on back order
8/19/13 — 3 B's to meet with JE to review Project
9/3/13 — 3 B's on site to Water Test MBR Terrace
9/17/13 — Carpet on site, will be installed prior to next visit unless
given other direction
9/18/13 — Forwarded E Mail to JE & RK showing gutter Issue
9/24/13 —3 B's on site, sealed existing gutter cap & water tested
leaders.
9/27/13 — Forwarded E Mail to JE & RK noting_prexisting issue,
separate to the leak on the Princess Deck ceiling
Chance Order $460.00 10/9/13 —Change Order E Mailed to RK via 3B's
PVC elbow connected to gutter spout, therefore backup water
causing overflow in metal moulding & fasia of terrace
Leaders sealed correctly, terrace & gutter flooded with water -
no leaking from ceiling
Water sprayed on wall below windows — leaking occurred,
3 B's
'temporarily sealed area.
3 B's recommend cutting section of stucco & flash area correc
tly
10/4/13 — 3 la's Proposal to be forwarded
Page 8
EFTA01124762
Zorro Development Corp - Project Report 10/11/13
29 - REPAIR START fQ EST.COST NOTES
ef2QUEEA PHOTO STATUS
5/9/13 — Vendor on site
5/16/13 — Bid breakdown forwarded to RK
6/10/13 — JE requested that work be started in Sept 2013
8/20/13 — JE requested that 3 S's submit a bid for Project
9/3/13 — 3 El's on site to review Project
9/24/13 — 3 Be declined moving forward with Project
9/24/13 — JE approved moving forward with replastering of Pool
&Cleaning Spa tile
9/27/13 — Forwarded Proposal to RK from Lee Sure Pools
Awaiting Direction
10/4/13 — RK will be contacting Lee Sure Pools in reference to
their proposal
10/9/13 — RK requested another vendor proposal
10/11/13 — As of date still hying to locate another vendor who can
complete this work, will continue to investigate options
Page 9
EFTA01124763
Zorro Development Corp - Project Report 10/11/13
30- FRONT GATE START ' END EST.COST NOTES PHOTO STATUS
OPENERS
Cell Boxes/Loops 07125/13 $10,833.00 4/20/13 — Bid received, requested vendor to make adjustments Awaiting
519/13 — Received Revised bid. Options & Equipment reviewed Installation
5/12/13 — Options & Equipment selected Gate Loops
5/21/13 — Final bid faxed, unreadable, vendor will resend 10/15/13
6/8/13 — Final bid from RMC Electric - $11,941.00
6/11/13 — RK requested material breakdown
'6/14/13 — Material breakdown forwarded to RK
6/19/13 — RMC Electric resubmitted revised pricing to RK
6/28/13 — RK requested that 3 B's submit an estimate. Have
contacted 3 B's, they will be on site next week to review
6/29/13 — Forwarded E Mail to 3B's outlining scope of work to be
included within the bid
7/9/13 — RK neogiated 3 B's bid
4kopro =IRK 7/11/13 — 3 B's Bid Approved.
7/12/13 — Forwarded Deposit Request $6,750.00 to BK & RK
7/12/13 - 3B's received Deposit
7/25/13 — Project Started
7/27/13 — Gate 1 Controllers & Key Pad installed. New Key Pad
for Gate 2 faulty, vendor has reordered — attached photos
8/10/13 — Waiting for installation of loops & Gate 2 Key Pad
8/19/13 — Vendor to meet JE
8/21/13 — Gate 2 Key Pad installed, gate phone lines down,
hence no remote control to operate gates
8/30/13 — Contacted RMC regarding phones & gate controllers
will be on site next week
9/2/13 — As of date Gate Looms Not Installed
9/3/13 — 3 B's on site to review Project
9/16/13 — The bid that 3 B's neogiated with RK did not include the
purchase or installation of gate loops, which was on the orginal
bid submitted by RMC Electric & E Mail submitted to 3 B's by BG
change Order $481.50 9/17/13 — Change Order submitted from 3 B's
\9/18/13 — Submitted Change Order to JE & RK
Page 10
EFTA01124764
Zorro Development Corp - Project Report
Approval JE 10/11/13
9/18/13 — JE Approved Change Order
9/21/13— Awaitinadeliveli of Gate Loops to Vendor
10/2/13 —Gate Loops on Back Order, awaiting delivery Vendo
to r
10/16/13 — Gate Loops due to be installed
Page 11
EFTA01124765
corro uevelopment Corp - rroject neport iwilita
31- PHONES MAIN START END EST.COST NOTES PHOTO STATUS
HOUSE
07/17/13 10/07/13 4/27/13 —JE approved installation of new phones at MH Complete
Awaiting for Service Provision & Estimated Cost of Delivery of
Services from Proj 21 - Microwave & IT before moving forward
6/22/13 —Awaiting response from Southwestern Wireless on
FCC License Application & Router at MH
7/17/13 — Project Started
7/25/13 - Switch & 16 Phones Installed, awaiting delivery date
remainder of phones — attached photos
9/6/13 — Phones due to be deliveried to Vendor
9/15/13 — Delivery of phones to vendor have been delayed
9/30/13 — Phones due to be deliveried to Vendor
10/2/13 — Vendor on site to start installing/punching down phones
10/3/13 — Vendor had an emergency, will be on site 10/7/13 to
complete Stall
10/7/13 — Installation of all telephones complete except for
Princess Deck, 1 set of Cables unusable, will review other control
box when next on site
32 - PHONES RANCH START op EST.COST NOTES PHOTO STATUS
ONIBAL
6/21/13 — Will forward proposal for Phone System by 6/28/13 Project
6/27/13 - Project On Hold until Microwave Solution resolved On Hold
Page 12
EFTA01124766
Zorro Development Corp- Protect Report 10/11/13
33 - POOL PAC START END E$T.COST NOTES PHOTO STATUS
Engineering Inspection 4/29/13 — Quote forwarded to RK, who requested more detail
$9,100.00 5/8/13 — Revised quote forwarded to RK, awaiting direction
Unit Cost 5/22/13 — Beaudin Ganze on site to review Project
$43,170.00 5/29/13— Beaudin Ganze report forwarded to JE 8 RK
Approval JE 5/29/13 — JE Approved invesigation via camera
6/3/13 — JBH forwarded estimate
Approval JE 6/4/13 — JE Approved moving ahead
Camera Duct Inspection 6/11/13 — JBH due on site
$1,214.91 6/12/13 — JBH on site, complete camera inspection, awaiting
Report/Disc
6/21/13 — Report/Disc forwarded to Beaudin Ganze
7/8/13 — Report/Disc due on site
7/9/13 — Informed that Report has been delayed
RK forwarded Report to JE
7/20/13 — Beaudin Ganze on site to review Project with JE
JE did not approve any design solutions by Beaudin Ganze
8/22/13 — Contacted Dessert Air & fomented info regarding
existing space & equipment design
9/18/13 - Site visit expected by Dessert Air to confirm their
proposed solution
9/19/13 — Dessert Air have rescheduled for 9/27/13
6dsroval E 9/24/13 —JE approved investigating purchase of new Pool Pac
9/25/13 — Dessert Air pending visit — placed on hold
9/30/13 — Trane Pool Pac Rep on site
10/1/13 — Trane forwarded all info to Pool Pat
10/3/13 — Forwarded Meth Drawings of area to Trane
10/8/13 —Trane due to be on site to confirm air flow details
10/8/13 — Trane on site
10/11/13 — Trane on site to confirm auditory heating operation
Page 13
EFTA01124767
Zorro Development Corp - Project Report 10/11/
13
10/11/13 — Trane Proposal forwarded to RS & MT. Suggested
1-system
is different from exisiting - automated outside air
Dampers & circulating pump on loop water
Awaiting estimate from Trane for cleaning and or replacement
of
ex heating coil. Due 10/15/13
Page 14
EFTA01124768
corro ueveuopment Corp - rroject Kepon itirliiiz
34- REPAIR & PAINT START END EST.COST NOTES PHOTO STATUS
WORK - ION
5/7/13 — E Mailed Photos to JE showing work required Awaiting
5/23/13 — Forwarded all work details to Ion, including work that Direction
will be required after MBR Terrace Is completed
6/29/13 — Additional work — Sign on Adobe,OIEFfice Wall
6/30/13 — As of date Awaiting Direction
ILthSTILII START END EST.COST NOTES PHOTO STATUS
Plu_ggirIg_1" Hole $15,000.00 Estimate to Plug 1 st Hole
START END EST.COST NOTES PHOTO
REFURBISHMENT STATUS
(ROADS CULVERTS
7/27/13 — Will review with JE on site, of at Roads &Culverts
8/5/13 — Road Base 23 tons $360, Culvert 4ft x 24ft - $1,381.85
Culvert 5ft x 24ft - $1,727.24
9/27/13 — Due to high water flow/rain, culvert gone from under,
road, no access to North Gate Road, past the Caboose
attached photos
9/30/13 — Work begins to return culvert to correct position, pack
with gravel 8 dirt, reconstruct road
10/1/13 - Culvert back in place, road passable - attached photos
40 - LANDSCAPING START 2112 EST.COST NOTES
LOG & LODGE PH= SIAM
10/08/13 10/8/13 — Removal of dead trees, prunning trees started
10/11/13 — All dead trees have been removed from back of
Lodge. All trees surrounding the Lodge have been pruned
- attached photos
Work will continue after guests leave 10/21/13
Page 15
EFTA01124769
Zorro Development Corp - Project Report 10/11/13
41- START END EST,COST _NOTES PHOTO STATUS
REFURBISHMENT
HOME THEATER
8/13/13 — JE requested replacement of existing Sony Projector Awaiting
8/15/13- 3 Vendors on site - Proposals due next week Revised
8/22/13 - JE forwarded 2 Proposals Bids
8/25/13 — Received 3n0 Proposal
JE requested Purchase of Projector to be placed On Hold as
new projector to be released Dec 2013
Aooroval JE $83.06 9/17/13 — JE approved purchase of HDMI Cable
$320.00 + tax 9/17/13 — JE approved 3 B's installation of HDMI Cable
9/18/13 — HDMI Cable ordered
9/28/13 — HDMI Cable on site
9/30/13 — HDMI Cable installation begins
9/2/13 — HDMI Cable installed
10/3/13 - New Model of Sony Projector will start to be shipped
end of Oct. Forwarded E Mail to JE & RK with details, awaiting
direction
10/10/13 — Vendors to provide revised bids with new e ._____
and screen.
10/11/13 — Awaiting revised bids
Page 16
EFTA01124770
corro ueveiopment Corp rropect neport iun
tiar START
1/13
QM EST.COST NOTES
REFURBISHMENT PHOTO STATUS
HOUSE EXTERIOR -
ILA
09124/13 $10,807.00 8/22113 —JE Approved Project
3 B's to complete MH. ZDC to complete Garage (Project X Awaiting
42A) Direction
9/3/13 — Requested RK & BK for Deposit of $7,500.00
9/4/13 — Deposit received by 3 B's
9/24/13 — Project Started
9/27/13 — Work continues — attached photos
10/2/13 — Stucco complete, vendor working on color sampl
e
10/4/13 — Work continues attached photos
JJ has recommended that we use a synthetic stucco, forwar
ded
this information to JE. Extra expense of $2,000
$52.09 _10/9/13 - ZDC have removed front door for strigag
& painting.
Plywood cover installed to replace door area
10/10/13 —ZDC has completed all priming of posts & eaves
— attached photos
10/11/13 — Awaiting direction on Stucco Finish/Color
4.2..&-
REFURBISHMENT
START am EBT.COST NOTES PHOTO ITEM
GARAGE EXTERIOR -
LY.
09/30/13 $1,543.26 9/30/13 — Project Started
10/2/13 — All garage walls have been primed Awaiting
10/3/13 — Priming of all trim on Garage & House started Direction
10/1013 — Priming of all trim complete
10/11/13 — awaiting Direction on Stucco Finish/Color for MH
Page 17
EFTA01124771
Zorro Development Corp - Project Report 10/11/13
43 - REFURBISHMENT START END EST.COST T NOTES
LANDSCAPING — LV ni4I4 STATUS
8122/13 — JE Approved Project Awaiting
Cover Rock with soil, Pinion installation Direction
8/22/13 — Forwarded JE suggested colourful plant material on E Mall
for discussed areas — awaiting direction dated
9/18/13 — Router Tilling Complete. Ready for Top Soil 10/02/13
9/18/13 — Forwarded JE & RK breakdown of installation/purchase
etc of sod. Total $5,512.50
9/18/13 — JE asked how much sod. 5,350 sq ft
9/27/13 — Reviewing sod estimates
10/2/13 — Resubmitted revised Installation/purchase etc of
sod to RK. Total $5,358.25
44 - LODGE ROOF START Q MOIL Nom en= STATUE
9/27/13 — Forwarded JE & RK estimate to repair Lodge Roof
attached estimate & photos
9/27/13 — JE Did Not Approve Project
Page 18
EFTA01124772
Zorro Development Corp - Project Report 10/
PURCHASES START END
11/13
EST.COST NOTES
REPAIRS PHOTQ STATUS
Heavy Machinery
8/22/13 — JE requested investigating a Bulldozer purchase
& any
other equipment ZDC may require
8/27/13 — Investigating avaiable equipment Awaiting
Direction
Bobcat on E Mall
9/3/13 — Investigating trading exisiting Bobcat for new
9/18/13 — Have price from local Bobcat dealer, as of date no dated
one 10/02/13
has been able to match this price
1012/13 — Forwarded E Mall to JE & RK, with details
Offered 8K from local contractor, $5,500 as a trade from
From Bobcat. Awaiting Direction
1984 Dump Truck
9/22/13 —1989 Dump Truck requires new transmission & dutch
9/27/13 — Dump Truck was hauled, estimate expected 10/4/1 Awaiting
3 Direction
10/3/13 - Vendor did not receive message about estim
ate on E Mall
hence ordered a rebuilt transmission $4,136.98
Total estimate to repair $7,712.72 dated
Forwarded details to JE & RK, awaiting direction 10/03/13
Outside Furniture -
Lodge 8/22/13 — JE agreed new outside furniture required, will reloca
exiitng table & benches from Shooting Range to uncovered te
back
deck
9/1/13 — Will investigate funiture options for covered back deck
9/16/13 —After reviewing_unoovered deck, we believe that On Hold
the until
deck WV not handle the weight of the table & benches from the
Lahooti Ranob, especially_if we receive snow Spring 2014
9/22/13 — Will investiage all options over the next week
9/27/13 — Will forward suggestions 10/4/13
10/4/13 — Unable to find anything locally, so late in the seaso
n.
Will relocate funiture from other areas to cover up coming guest
visit. Will place this project On Hold until Spring 2014
Page 19
EFTA01124773
Zorro Development Corp - Project Repor
ZDC
t 10/11/13
IN HOUSE WORK
91MUMMAEM EST.COST
To begin Late Fall ELM STATUS
YURT FURNITURE START NR MOM ROTES
8/22/13 — JE Approved reconstruction of exisitng furniture STATUS___
11/=_ —_ ____
to
make items more resilient to mice attack
8/19/13 —Old fabric backing has been removed from sofa/c
hairs
FUEL EMI EST.COST NOTES STATUS
8/
ℹ️ Document Details
SHA-256
3f6573cf20a49cd821b115fa2252f948185b756279de927ca5d97d6e00b8b052
Bates Number
EFTA01124755
Dataset
DataSet-9
Document Type
document
Pages
21
Comments 0