EFTA00676932
EFTA00676933 DataSet-9
EFTA00676934

EFTA00676933.pdf

DataSet-9 1 page 181 words document
V16 P17 V11
Open PDF directly ↗ View extracted text
👁 1 💬 0
📄 Extracted Text (181 words)
From: Daphne Wallace To: Jeffrey Epstein <[email protected]> Cc: Rich Kahn Jimmy Fraguela Subject: Proposed Landing Site for WAPA link between LSJ and GSJ - August 10, 2017 Date: Thu, 10 Aug 2017 19:27:03 +0000 Attachments: Proposed_Landing_Site_for_WAPAiink_from_LSJ_to_GSJ_-_August_10,_2017.pdf Greetings Sir, Attached below is Mr. Fraguela's and Mt Felix Rey's (WAPA) proposed landing site on GSJ for the electrical power cable from LSJ. They are proposing following the same route as the cable from St. Thomas, and coming onto GSJ at a point that will avoid disturbing the area that is known to contain an underwater grass that is protected. Mr. Fraguela recommends digging a trench 3 feet in depth that will bring the cable from the point of landing to the point that you have indicated you wish to have the main power vault constructed. With you approval of Mr. Fraguela's proposal, he is requesting Ms. Dempsey dive the area to confirm that the grass is not present. Plan drawings can then be created, sent to WAPA for final review and approval, and the permit application submitted to DPNR. Respectfully submitted, Daphne EFTA00676933
ℹ️ Document Details
SHA-256
3f6944b051edf5850cdf25802e142031bfb5cf1a5df47bd1d3b3dd6703f72390
Bates Number
EFTA00676933
Dataset
DataSet-9
Document Type
document
Pages
1

Comments 0

Loading comments…
Link copied!