EFTA01739000.pdf

DataSet-10 1 page 174 words document
👁 1 💬 0
📄 Extracted Text (174 words)
From: Richard Barnett To: 'effre E stein < [email protected]>, Subject: Chiller Cooling Tower upgrade project Proposal update Sent: Wednesday, February 27, 2013 7:47:43 PM Mr. Epstein as requested to get the two HVAC contractors bidding the Chiller and Cooling Tower up grade project the same scope of work bids to compare pricing.AD Winston came in with a complete bid package with electrical connections and property protection included in their proposal at $357,255.00 .Pierpont Mechanical did not include the electrical work and property protection for the project and priced the project at $330,000.00 after a few weeks of waiting for Pierpont to bring in an electrican and general contractor to include the missing pricing .Pierpont has now requested to bring the two contractors in on Tuesday March 5th to finilize their bid .I have already asked AD.Winston to revise their proposal and try to give us the lowest price possible.Hopefully by the end of next week we will have two complete lowered proposals and pick one contractor to start the up grade project.RB EFTA_R1_00027151 EFTA01739000
ℹ️ Document Details
SHA-256
4067c47380115c8e9f51c7711ec7ae46f22b1307a862c7acd4ce0a9b77c106aa
Bates Number
EFTA01739000
Dataset
DataSet-10
Type
document
Pages
1

Community Rating

Sign in to rate this document

📋 What Is This?

Loading…
Sign in to add a description

💬 Comments 0

Sign in to join the discussion
Loading comments…
Link copied!