From: Richard Kahn < >
Sent: Friday, March 15, 2013 6:32 PM
To: Jeffrey Epstein
Cc: Rich Barnett
Subject: 71st Street - Chiller/Tower Proposal
Attachments: Epstein Residence.pdt Untitled attachment 00138.htm
Rich B and I both followed up this week (numerous =hone calls) with Pierpont (other bidder on this job) whose original
bid =ame in at 330,000.
Their bid was missing Electrical and Protection =hich Rich B estimated to be approximately 20,000 - 30,000.
=nbsp;Pierpont came to the house last week and was supposed to have new =roposal this week.
Neither of us received a return phone call =or revised bid to reflect additional costs. This lack of =ommunication and
follow through has left me very uncomfortable with =his vendor.
The other bid we received was from =D Winston (dated June 19th 2012) in the amount of 357,255. Rich B =ailed ADW in
Feb 2013 and asked them to update bid and lower price. =nbsp;They said that they have had price increases since June
2012 =owever in good faith they lowered bid by 5,000 to 352,255. This =eek when i spoke to ADW i asked for further
price reductions. =nbsp;They reluctantly said they would lower their price to 350,000 =owever they could not go any
lower.
I also reviewed the scope =f their work and wanted to highlight a few =acts:
a)Lead Time is 10-12 =eeks
Work (start to finish) 3 Weeks
If we send =eposit by Monday we would be in position to begin job in middle of June =013.
b) Sales Tax will not be charged as we =ill fill out NYS Form ST-124 Certificate of Capital =mprovement
c) payment terms 1/3 acceptance of =id, 1/3 upon delivery and 1/3 upon =ompletion
There were two other =tems outside of this bid:
1) Rich B will need =o bring in Siemans to perform electrical control wiring which Rich B =stimates cost to be
approximately $8,000
2) =nly extra not included in ADW Bid was the installation of a VFD =variable frequency drive) which varies the speed of
the fans on the =ooling tower as compared to standard feature of High Low and Off. =nbsp;Currently we do not have a
VFD and ADW said the payback period of =nergy savings would be approximately 10 years. The cost for this =xtra is
22,656.
http:/=hpac.com/motors-drives/benefits-vfds-cooling-towers
Please advise if ok to proceed with AD Winston. =nbsp;
Option 1 - ADW and no VFD 350,000 - =16,666.67 deposit required
Option 2 - ADW and =FD 372,656 - 124,218.67 deposit =equired
EFTA_R1_01983786
EFTA02679570
Richard Kahn
=It
Subject: FW: Revised Chiller/Tower =roposal
Hi Rich as requested here is the revised proposal =rom ADW.
From: =r>To:
Subject: Revised =hiller/Tower Proposal
Date: Thu, 28 Feb 2013 12:25:44 =0500
Hi Richard,
Attached please =ind revised proposal. Please note, that while reducing the price, A.D =inston will be receiving price
increases from vendors and =ontractors.
Thank =ou,
Mike
Michael =alladino
Vice President
A.D Winston Service =nc
Email:
Phone:
Fax:
&nb=p;
<=div>
2
EFTA_R1_01983787
EFTA02679571
ℹ️ Document Details
SHA-256
40c397b8283d163526703caf90f43816a4ce0e91bb4a14e94181da1c23ebd3a3
Bates Number
EFTA02679570
Dataset
DataSet-11
Document Type
document
Pages
2
Comments 0