EFTA02367789.pdf

DataSet-11 1 page 160 words document
P23
👁 1 💬 0
📄 Extracted Text (160 words)
From: brice gordon Sent: Tuesday, January 10, 2012 4:02 PM To: Jeffrey Epstein Cc: TOM MELNIICK; Darren Indyke Subject: VI Gunite FYI Tom, Darren and I spoke with Rex this morning c=iv>Continent on blue plaster availability for flag pool, which will be con=irmed 2 pm today AST recommend this basic schedul= starting this week green light material order/empty pool- 3 wks f=r tile main compound pool delivery, 2 weeks blue plaster flag pool heater relocation and start flag pool refurbishment replaster =lag pool/ fill main compound material arrives/empty main compound pool tile main compound pool/ fill 7 - 8 week duration total for =oth pools work schedule, if required 7 days a wee= with option to start early and finish later than 4pm payment schedule will be confirmed=once availability of plaster is confirmed today are you ok with =his please advise Brice Gordon Little Saint James USVI --20cf307ca02c16c5bf04b62ea37f-- date-last-viewed 0.0 date-received 1326211327 flags 8623750145 original-mailbox imap://[email protected]/%58Gmail%5D/All%20Mail remote-id 200719 EFTA_R1_01366308 EFTA02367789
ℹ️ Document Details
SHA-256
42294fd741e83073719d13f78d56aa7685b7032f9498497caf865de55c594b58
Bates Number
EFTA02367789
Dataset
DataSet-11
Type
document
Pages
1

Community Rating

Sign in to rate this document

📋 What Is This?

Loading…
Sign in to add a description

💬 Comments 0

Sign in to join the discussion
Loading comments…
Link copied!