From: "Jeffrey E." <jeevacationggmail.com>
To: BMG
Subject: Fwd: Staff Cottage: revised work schedule on cottage from Dave
Date: Thu, 27 Apr 2017 11:14:58 +0000
Attachments: revised_lsj_cottage_schedule.rtf
this is bullshit
Forwarded message
From: Ann Rodriquez ccl
Date: Thu, Apr 27, 2017 at 6:56 AM
Subject: Staff Cottage: revised work schedule on cottage from Dave
To: Rich Kahn <
Cc: Jeffrey <frevacation(iiigmail.com>
David Starofskv
Revised Schedule for LSJ Cottage Rmodeling
Apri 29th Start painting inside kitchen, Laundry and office areas
Cannot finish painting rest of area due to electrical panel needs installed and air conditioners need
replacing.
May 1-5th install kitchen cabinets, exhaust hood for stove, appliances and interior doors. Also Hughes
electric will install all plugs and lights for new addition. He was contracted for 4,000.00 with permision
from Brice because Danny Vicers did not have time to complete it. He was not contacted to install new
electric panel if this needs to be done it will be an additional cost. All electric originally was to be done
by in house empoyees.
This is based on hardware for doors to be bought
May 8-12th Finish drywall rest of area bedroom and living area if AC and Electric panel is installed,
work on finishing outside tile and outside deck if plumbing is finished for downspouts from roof. This
is in house work.
May 15-19th Finish lose ends until windows, doors and skylights come in. I placed an order for these
March 16th and were to be here already. When I called about delivery he had not ordered them at all
so when he ordered them delivery is Nay 19th
May 22-May 31 install windows, doors and skylights. Then complete tile work inside and out need
doors installed to finish tile. Roof and install gutters.
Outside new area ready for exterior painting also have advised that it can be completed two weeks
ago
Up to this date I have had 76 hours of downtime due to noise which resulted in 280 man hours This is
almost two weeks of time loss.
I am sure that with Anna"s help to get electric panel resolved , plumbing work done, ac completed and
painting to be done by in house we can complete this by above date.
I have drawn 20,800.00 so far and balance of 9,200.00 is left. I will hold back 6,200.00 till job
completed and draw 3,000.00 to pay employees til job finished.
Ann R.
EFTA01048050
Begin forwarded message:
From: david starofsky
Date: April 27, 2017 at 6:05:57 AM AST
To: Ann Rodriquez
Subject: revised work schedule on cottage
Reply-To: david starofsky
Anna
I have attached a revised schedule for your review. I know that with your help on electric panel, plumbing and completing
new AC units we stick to this schedule
Also I noted the amount of down time due to noise and Mr Epsteins requests.
Thank you for your time and consideration on this
Dave
please note
The information contained in this communication is
confidential, may be attorney-client privileged, may
constitute inside information, and is intended only for
the use of the addressee. It is the property of
JEE
Unauthorized use, disclosure or copying of this
communication or any part thereof is strictly prohibited
and may be unlawful. If you have received this
communication in error, please notify us immediately by
return e-mail or by e-mail to [email protected], and
destroy this communication and all copies thereof,
including all attachments. copyright -all rights reserved
EFTA01048051
ℹ️ Document Details
SHA-256
431ed36e1f78d476b68a253594ae856917c9d6fe5e8479262aa35aec6f9b0893
Bates Number
EFTA01048050
Dataset
DataSet-9
Type
document
Pages
2
💬 Comments 0