EFTA00586320.pdf

DataSet-9 1 page 150 words document
👁 1 💬 0
📄 Extracted Text (150 words)
Memorandum To: Darren Indyke From: Emad Hanna Re: Paul Gandy Project Update Date: 07-14-05 Phone System: Gandy indicated his concerns regarding compatibility issues and increasing costs with the installation and the increasing monthly costs. Scully is negotiating with Innovative to reduce the mandatory 100 lines down to 50. Paul has promised to deliver by Monday July 18th a summary with cost basis. Lighting: Gandy had originally quoted a price under $ 100,000 based on the original survey, which he admitted that he made a mistake on and it is his fault. He now states the current estimate is about $ 200,000 higher than anticipated based on the new site plan, which has considerably more pathways and added all utility conduits and duct banks for future facilities and a fixture cost around $ 1,200 per light. Paul has promised to deliver by Monday July 18th a summary with cost basis. EFTA00586320
ℹ️ Document Details
SHA-256
43bc1fa10dc1aee802cdbec8a3ba9dd5f60eb91afe3fa392b4a9aa844a5db91a
Bates Number
EFTA00586320
Dataset
DataSet-9
Type
document
Pages
1

Community Rating

Sign in to rate this document

📋 What Is This?

Loading…
Sign in to add a description

💬 Comments 0

Sign in to join the discussion
Loading comments…
Link copied!