📄 Extracted Text (291 words)
Hasan-Uddin Khan
143 Concord Avenue
Lexington, Massachusetts 02421, USA
Voice: Fax: 781- 860-7706
e-mail:
121" of November 2009
Mr. Jeffrey Epstein Transmitted by email
358 El Brillo Way
Palm Beach, FL 33480
Dear Jeffrey,
LSJ Hammam, USVI
Please find attached an accounting for design consultancy services for October 2009 — the
time sheet for Andrew Levy is attached.
Hasan Khan Total: 5 hours @ $ 250/hour $ 1,250.00
Andrew Levy Total: 106 hours @ $ 40/hour $ 4,240.00
Total Fees: $ 5,490.00
Amount due for September: $ 5,220.00
Amount due for October: $ 5.490.00
TOTAL DUE: $ 10.710.00
Please settle by bank transfer, as per usual.
Thanks and regards,
Hasan
Hasan-Uddin Khan
Attachment: AL time sheet
EFTA00727300
sHasan-Uddin Khan
143 Concord Avenue
Lexington, Massachusetts 02421, USA
Voice: Fax: 781- 860-7706
e-mail:
22nd of October 2009
Mr. Jeffrey Epstein Transmitted by email
358 El Brillo Way
Palm Beach, FL 33480
Dear Jeffrey,
LSJ Hammam, USVI
Please find attached an accounting for design consultancy services for September 2009 —
time sheets for Andrew Levy and myself are attached.
Hasan Khan Total: 10 hours @ $ 250/hour $ 2,500.00
Andrew Levy Total: 68 hours @ $ 40/hour $ 2,720.00
Total Fees: $ 5,220.00
Amount due for September: $ 5,220.00
Please settle by bank transfer, as previously.
Thanks and kind regards,
Hasan
Hasan-Uddin Khan
Encs.
EFTA00727301
Hasan-Uddin Khan
INVOICE for SERVICES
For 1 - 30 September 2009
LSJ Hammam Schematic Design, USVI
PROFESSIONAL FEES
Week 1. Sep 1-6 Total: 1 hour $ 250.00
Week 2. Sep 7-13 Total: 5 hours $ 1,250.00
Week 3 & 4. Sep 14-27 Total: 2 hours $ 500.00
Week 5. Sep 28-30 Total: 2 hours $ 500.00
Total: 10 hours $ 2,500.00
Hasanuddi nKhan
Hasan-Uddin Khan
22nd October 2009
EFTA00727302
ℹ️ Document Details
SHA-256
43d923042306793bcd868209b8208d58dd0be1c6c301903de1e40d0778696c77
Bates Number
EFTA00727300
Dataset
DataSet-9
Document Type
document
Pages
3
Comments 0