EFTA00906418.pdf
👁 1
💬 0
📄 Extracted Text (230 words)
From: "Gary Kerney"
To: "Ga Kerne ," >, "Warwick Wicksman"
Cc: "JelTre Epstein" <'eevacationggmail.com>, "William Rowles"
Subject: RE: flagpole pool
Date: Tue, 15 Mar 2011 19:34:31 +0000
Warwick
Here is the design outline I sent 2/19 for the building,Please draft building doe's
Gary
From: Gary Kerney
Sent: Sat 2/19/2011 10:09 AM
To: Warwick Wicksman; Tom Sze
Cc: Jeffrey Epstein; William Rowles;
Subject: flagpole pool
Wawick
Specifications for construction development drawings.' need a quick turn around ,can form slab next week.
Revised bath and kitchen programs attached
Revised site plan attached
BUILDING
block structure
10' ceiling
plaster finish in and out
truss roof
insulated and corr.metal roofing same as main compound
crown molding and copper gutter same as main compound
roll down hurricane shutters on 8' sliding glass doors(jeffrey mirrored?)
mechinacial awnning over sliding door
all other doors slabs
INTERIOR
floors stained concrete floors
manufactured kitchen cabinets
30" refrigerator
30"range
Ice maker
dbl. sink
bath to be ceramic file floor and shower(small 1"+-)
wood vanity top,with vessel sink
Grohe shower fixtures all other American Standerd or eq.
corner sconces in livingroom
recess can liting
all liting on dimmers
all base wall outlets to be 1/2 switched
POOL
current thinking to reflect on next generation of image review
10x30 shade structure one each side
EFTA00906418
2x2 plaster col's 9' high
10" thick solid top ( 2' overhang?)
ceiling cans,col. sconces,ceiling fans
EFTA00906419
ℹ️ Document Details
SHA-256
45e7e68acd6ab15ab6ee1b105da948138315f8e834e25fad5479d4c23df40f47
Bates Number
EFTA00906418
Dataset
DataSet-9
Type
document
Pages
2
💬 Comments 0