EFTA00616394
EFTA00616397 DataSet-9
EFTA00616398

EFTA00616397.pdf

DataSet-9 1 page 169 words document
P17 V11
Open PDF directly ↗ View extracted text
👁 1 💬 0
📄 Extracted Text (169 words)
Subbase Drydock Estimate Parcel #162, Subbase S 0803 Date Estimate # T F 6/13/2007 118 fr Name / Address MottlAitt ,6 0 Steve Rampino/Sun Bowt Ocean Services Terms Project Proposal Bertha Landing C... Description Qty Cost Total Drydock Haul Out: 70' (reserved for Thursday, 70 21.00 1,470.00 July 5th 2007 through Wednesitduly 11th, 2007.) ti ta5 TALI° Laydays 4 1144 apt 1,O" .-tutY g 4 250.00 1,000.00 Pressure wash bottom, scrape and sand off marine 1 5,300.00 5,300.00 growth, apply two coats of primer over entire bottom, paint two coats of bottom paint with a third coat at the water line. LABOR: Materials: includes epoxy 235 primer, bottom paint, 1 4,100.00 4,100.00 and all miscellaneous materials.** **Does not include tines. **Steve, usually we require a $500 deposit to reserve your drydock date, but because you are valued customer, we are waiving the deposit. 1-lowever, if for any reason you decide to cancel your drydock haul out, please contact me as soon as possible. Thank you! Total $11,870.00 Signature EFTA00616397
ℹ️ Document Details
SHA-256
4664b127e2a0d624d636c411ad9fcd76d47f2c6b9289c12a95f6017537c32e8a
Bates Number
EFTA00616397
Dataset
DataSet-9
Document Type
document
Pages
1

Comments 0

Loading comments…
Link copied!