📄 Extracted Text (169 words)
Subbase Drydock Estimate
Parcel #162, Subbase
S 0803 Date Estimate #
T
F 6/13/2007 118
fr
Name / Address
MottlAitt ,6 0
Steve Rampino/Sun Bowt Ocean Services
Terms Project
Proposal Bertha Landing C...
Description Qty Cost Total
Drydock Haul Out: 70' (reserved for Thursday, 70 21.00 1,470.00
July 5th 2007 through Wednesitduly 11th,
2007.) ti ta5 TALI°
Laydays 4 1144 apt 1,O" .-tutY g 4 250.00 1,000.00
Pressure wash bottom, scrape and sand off marine 1 5,300.00 5,300.00
growth, apply two coats of primer over entire
bottom, paint two coats of bottom paint with a
third coat at the water line. LABOR:
Materials: includes epoxy 235 primer, bottom paint, 1 4,100.00 4,100.00
and all miscellaneous materials.**
**Does not include tines.
**Steve, usually we require a $500 deposit to
reserve your drydock date, but because you are
valued customer, we are waiving the deposit.
1-lowever, if for any reason you decide to cancel
your drydock haul out, please contact me as soon
as possible. Thank you!
Total $11,870.00
Signature
EFTA00616397
ℹ️ Document Details
SHA-256
4664b127e2a0d624d636c411ad9fcd76d47f2c6b9289c12a95f6017537c32e8a
Bates Number
EFTA00616397
Dataset
DataSet-9
Document Type
document
Pages
1
Comments 0