EFTA02335898
EFTA02335949 DataSet-11
EFTA02335953

EFTA02335949.pdf

DataSet-11 4 pages 1,299 words document
V15 P19 P23 D1 V13
Open PDF directly ↗ View extracted text
👁 1 💬 0
📄 Extracted Text (1,299 words)
Subbase Drydock Inc. Invoice PO Box 4429/ Parcel 162 Subbase St. Thomas, USVI, 00803 Date Invoice # T:(340) 776-2078 Fax:(340)779-8426 4/23/2015 6812 Bill To: Customer Phone LSJ,LLC Customer Fax Customer E-mail We accept cash, P.O. No. Project Terms chec s. major cred't cards. travelers checks and wired funds. More info Ann/Boseoe Big N/LSJ Barge Upon Completion available regarding wired monies. Qty/Hrs Description Rate Amount Subbase and Island Rigging and Hydraulics reviewed projects that were on your "to do list" this morning. I will list all projects that I can with a quote for each repair but first I would like to comment on the condition of the LSJ Barge. This vessel was hauled out at our yard three years ago . During that haul out Subbase quoted on most of the items you have in this current list. It was surprising to see that our recommendations were not completed and as a result the current condition of the vessel is not seaworthy. The overall appearance of the vessels is that it looks neglected and repairs that were essential were cobbled together in an effort to get by. The LSJ Barge needs a major overhaul to make her seaworthy and to ensure an extended service life. Subbase in not interested in making any repairs that will not be done properly; nor are we interested in patching anything together for a temporary fix. I understand that some projects may be more important then others so I will try to list each project individually. I Drydock hauling fees 1,500.00 1,500.00 12 Laydays: Approx 12 350.00 4,200.00 I Electricity Fee: Hook Up 75.00 75.00 12 Electricity Fee: per day 60.00 720.00 I 5000 psi pressure wash 327.00 327.00 Thank you for your business. Total Please note Subbase Drydock Inc. reserves the right to not release any Payments/Credits part/parts, projects or vessels for which/on which the above detailed work has been performed untilpayment in full is received. Balance Due Page 1 EFTA_R1_01294695 EFTA02335949 Subbase Drydock Inc. Invoice PO Box 4429/ Parcel 162 Subbase St. Thomas, USVI, 00803 Date Invoice # T:(340) 776-2078 Fax:(340)779-8426 4/23/2015 6812 Bill To: Customer Phone LSJ,LLC Customer Fax Customer E-mail We accept cash, P.O. No. Project Terms chec s. major cred't cards. travelers checks and wired funds. More info Ann/Boscoc Big N/LSJ Barge Upon Completion available regarding wired monies. Qty/Hrs Description Rate Amount I I & 2 ) Rudders: Subbase personnel examined the rudder room and we were able see major 20,000.00 20,000.00 corrosion on the transom. The hull plating has holes where sea water is seeping into the vessel. The steering components need to be removed and cleaned, the rudders need to be removed and serviced. The lower Pintle and gudgeons need service as well as the rudder stuffing box. I would reserve 10k to 20k for this project. I have included pictures of this compartment. I 3-A) Install two cylinders with stainless steel shafts; including all hoses back to engine 45.000.00 45.000.00 room, with stainless steel ends on all hoses. We will re-evaluate the valving and other engine room components to see what can me reused vs. replaced. We have been informed that the present pump is in good condition so we are not quoting on replacement of pump. Labor and Materials will be 535-45,000. 1 3-B) The steel boxes that secure the cylinders to the hull are deteriorated and will need 16,000.00 16,000.00 replacement. Subbase recommends using stainless steel to eliminate the corrosion. Three years ago we quoted $16,000.00 for both boxes and we will still honor this quote. I 4) The exhaust system is in a non-repairable condition and needs replacement from the 24,500.00 24,500.00 main engine to the hull outlet. Our quote will include all new piping, flex joints, exhaust mixers, and new exterior aluminum outlet. When system is complete it will be wrapped with a removable wire mesh hi-temp blanket. The new system will be much quieter than the existing exhaust system. Labor and material $21,000.00. Thank you for your business. Total Please note Subbase Drydock Inc. reserves the right to not release any Payments/Credits part/parts, projects or vessels for which/on which the above detailed work has been performed untilpayment in full is received. Balance Due Page 2 EFTA_R1_01294696 EFTA02335950 Subbase Drydock Inc. Invoice PO Box 4429/ Parcel 162 Subbase St. Thomas, USVI, 00803 Date Invoice # T:(340) 776-2078 Fax:(340)779-8426 4/23/2015 6812 Bill To: Customer Phone LSJ,LLC Customer Fax Customer E-mail We accept cash, P.O. No. Project Terms chec s. major cred't cards. travelers checks and wired funds. More info Ann/Boscoe Big N/LSJ Barge Upon Completion available regarding wired monies. Qty/Hrs Description Rate Amount I 5) Engine mounts need to be de-scaled of rust. Bolts holding mounts need to be cleaned or 7.000.00 7,000.00 renewed and alignment from coupling to shaft needs to be checked and adjusted for proper tolerances. An extensive review was completed of this drive train back in 2012 with repair recommendations made at that time. I do not know if this problem was solved so to budget for this I would reserve 5k to 7k for this project. (before exhaust system is finalized this alignment must be done). 1 6) Stuffing boxes: Subbase was informed that new stuffing boxes arc on hand and will be 5.000.00 son® owner supplied, after haulout removal of hose joining stuffing box to shaft log will reveal the condition of shaft log. I would reserve 5k for this project. 1 Cutless bearings require removal of main shafts and propellers: After removal of coupling, 4,150.00 4,150.00 shafts and props a condition report will follow if drive train is serviceable the routine maintenance for renewing cutless bearing will only need attention. Labor and material for this is (both port and starboard) $4,150.00. I 8) Engine Cooling Grid: Pressure test system and issue report for this service. Reserve 1.200.00 1,200.00 $1,200.00 I 9) Bottom paint and barrier coat: Labor and material $7,500.00. 7,500.00 7,500.00 10) Engine and marine gear - Review upon haul out — QUOTE WILL BE ISSUED — 0.00 0.00 I II) Fuel tank: Cleaning and disposal 2.800.00 2,800.00 Items 12 thru 18 will need more time to evaluate --- QUOTES WILL BE ISSUED --- 0.00 Thank you for your business. Total Please note Subbase Drydock Inc. reserves the right to not release any Payments/Credits part/parts, projects or vessels for which/on which the above detailed work has been performed untilpayment infull is received. Balance Due Page 3 EFTA_R1_01294697 EFTA02335951 Subbase Drydock Inc. Invoice PO Box 4429/ Parcel 162 Subbase St. Thomas, USVI, 00803 Date Invoice # T:(340) 776-2078 Fax:(340)779.8426 4, 23 1 015 6812 Bill To: Customer Phone LSJ,LLC Customer Fax Customer E-mail We accept cash, P.O. No. Project Terms checks. major cred't cards. travelers checks and wired funds. More info Ann/Boscoe Big N/LSJ Barge Upon Completion available regarding wired monies. QtylHrs Description Rate Amount 1 19) Clean engine room: Before any repairs arc started clean and degrease entire engine 5,500.00 5.500.00 room, dispose of oily water. After repairs are complete clean and paint engines and any other areas that were painted. Remove engine hatch covers and assess condition. Make necessary repairs and reinstall after all. Labor and material 55,500.00 I 20) Hydraulic Tank: Duc to severe corrosion of the steel hydraulic tank, Subbase - .ilku Int l :. i II reccomends replacing tank with new marine grade aluminum tank complete with all necessary fittings and sight glass to view levels. Labor and Materials. ***One-third due at mobilization, one-third at 50% completion and balance at completion*" Thank you for your business. Total sIS11,472.110 Please note Subbase Drydock Inc. reserves the right to not release any Payments/Credits - I ,111)1}.( i part/parts, projects or vessels for which/ on which the above detailed work has been performed untilpayment infull is received Balance Due $1-19.-172.00 Page 4 EFTA_R1_01294698 EFTA02335952
ℹ️ Document Details
SHA-256
477771cd8f4a11c13484b9d77c567f04d600232530d9a45fc1e56a13342da554
Bates Number
EFTA02335949
Dataset
DataSet-11
Document Type
document
Pages
4

Comments 0

Loading comments…
Link copied!