EFTA01174716.pdf

DataSet-9 1 page 202 words document
👁 1 💬 0
📄 Extracted Text (202 words)
SCOTT GFtAF 6501 Red Hook Plaza, Suite 201 St. Thomas, USVI 00802 March 14, 2012 TO: Little St. James ATTN: Rri RE: Irrigation system proposal GE project) TIME: S 3500 - $4000 A total for proposal with me and two helpers at $500 per day for 7 -8 days. My two helpers and I will need to trench and install approximately 200' of PVC pipe, fittings etc. to extend the existing two zones that were installed in October/November of 2011. We will also install turf rotor heads to get sufficient water coverage from the existing grass area below the kitchen/pool area to the palm located on St John hillside of slope. We will need to trench and bury approximately 600' of 1 12 / ", 1", 34" PVC pipe to pressure fittings to get pressure from the control valves to the perimeter of the slope. We will wire the new rotor zones to the existing controller located under the kitchen crawl space. Estimate total of labor to complete this project shown above. MATERIALS: We located the PVC pressure fittings and PVC pipe to install this project on 3/14/12. We also have the rotor heads and hardware located in the storage area. EFTA01174716
ℹ️ Document Details
SHA-256
4844401e3ea179ba7063570875c82eb624c3c57629058408aebf51bb303d6ddc
Bates Number
EFTA01174716
Dataset
DataSet-9
Type
document
Pages
1

Community Rating

Sign in to rate this document

📋 What Is This?

Loading…
Sign in to add a description

💬 Comments 0

Sign in to join the discussion
Loading comments…
Link copied!