📄 Extracted Text (633 words)
From: "Farkas, Andrew L."
To: Florida Science Foundation <[email protected]>
Subject: Fw: Request from JE on AYH
Date: Mon, 12 Jan 2015 23:21:48 +0000
Attachments: LSJ_Barge_Placement.pdf
I send the attached w/o editorial or amendment. How would you like me to proceed?
Sent from my BlackBerry 10 smartphone.
From: Mukamal, Thomas <
Sent: Monday, January 12, 2015 5:14 PM
To: Farkas, Andrew L
Cc: Garrison, Frank; Mukamal, Tom
Subject: Request from JE on AYH
Andrew —
As you may recall, we have worked a very long time to enter into an appropriate and favorable long term settlement with
Albert Paiewonsky and Paul Hoffman regarding the operation of P-dock at AYH. We are basically done. As part of the
settlement Albert and Paul will be investing over $200,000 and AYH will invest about $60,000 to rebuild P-dock. Our rent
will be decreased and we anticipate charging higher rates at the new dock. Also, we will connect P-dock to AYH's main
power feed which will significantly lower our cost of sales on utilities - increasing our margins substantially. Importantly, if
this scope of work on the dock is successful, we can assess the feasibility of implementing it across AYH's dock systems as
a means to upgrade the aging infrastructure in a more cost effective manner. There is one challenge for which I require
some assistance. The proposed engineering of P-dock and the proposed cost to rebuild it assumes that JE's LSJ barge is
relocated. The barge itself is too heavy and to rebuild the dock in a manner where the T-head won't suffer long term
damage will cost approximately $400,000 - $500,000 in addition to the $260,000 we are collectively spending - as we
would need to replace/reinforce more pilings. This will be a problem with all of AYH's t-heads if they are rebuilt. Also, as
the market has improved we are making money on our T-heads.
As you know as part of the lv, JE is entitled to dock a vessel the size of the barge for free. Lee Hicks (AYH - GM) has
spoken to JE's captain and we have a solution. I have attached a photo that shows a proposed new location where we
can secure contract berthing for the barge. IGY (not AYH) would pay the expense thereby honoring the economics for JE.
The proposed location is equidistant from the loading area currently used by the barge. Again, Lee has spoken to JE's
captain who is supportive. Rich Kahn (JE's accountant) has not been supportive. I need some help in enlisting JE'
support.
We can always revisit at a later date if need be but for now this seems like its preferred by JE's captain and in the best
interest of the asset and partnership.
Any questions, please let me know.
Tom
This message, and any attachments hereto, is confidential and intended exclusively for the use of the individual
or entity to whom it is addressed. This communication may contain information that is confidential, proprietary,
privileged, subject to a confidentiality and/or non-disclosure agreement, or otherwise exempt or protected
EFTA00866792
from disclosure (either by contract or under applicable law). If you are not the intended recipient, you are
hereby notified that printing, retaining, reproducing, copying, disclosing, disseminating or using this message or
any information contained herein (including any reliance thereon) is strictly prohibited. If you have received this
message in error, please contact the sender immediately and destroy the message (including any attachments)
and any copies in their entirety, whether in electronic or hard copy format. Nothing contained in this e-mail
shall be considered a legally binding agreement, amendment or modification of any agreement with Island
Capital Group LLC or any of its affiliates, each of which requires a fully executed agreement to be received by
Island Capital Group LLC or such affiliate.
EFTA00866793
ℹ️ Document Details
SHA-256
487cb7d5c20a03038f1d6f1721e415fb46f2d5e2b46f3b36e7a1768de1d6aadc
Bates Number
EFTA00866792
Dataset
DataSet-9
Document Type
document
Pages
2
Comments 0