EFTA01191193.pdf
👁 1
💬 0
📄 Extracted Text (145 words)
From: Daphne Wallace
To: Jeffrey Epstein <[email protected]>
Cc: ann rodriquez >, Rich Kahn
Subject: Fwd: FW: tunnel/ maint
Date: Mon, 01 Jun 2015 16:24:19 +0000
Attachments: TUNNEL_AND_MAINT_FLOOR-(6-1-15)_pdf
Greetings Sir,
The dimensions from John, as per your request on Friday.
Respectfully, Daphne
Forwarded message
From: John P. Woods, AIA
Date: Mon, Jun 1, 2015 at 11:14 AM
Subject: FW: tunnel/ maint
To: Da hne Wallace , Ann Rodriquez < >, Cecile deJongh
Daphne,
As requested, floor plans of the existing "tunnel" building and maintenance building with square footages.
JPW
Original Message
From: JAREDIAN DESIGN GROUP [mailtc
Sent: Monday, June 01, 2015 11:32 AM
To: John P. Woods
Subject: tunnel/ maint
Here are the existing floor plans with the square footages
JAREDIAN DESIGN GROUP
Architects, Engineers and Construction Managersill Ofc
MFax
This email is free from viruses and malware because avast! Antivirus protection is active.
http://www.avast.com
EFTA01191193
ℹ️ Document Details
SHA-256
4a9b357cc52160e54437bca3171452cca4f543919bcf0090605fa0884b245cec
Bates Number
EFTA01191193
Dataset
DataSet-9
Type
document
Pages
1
💬 Comments 0