EFTA01734224
EFTA01734227 DataSet-10
EFTA01734325

EFTA01734227.pdf

DataSet-10 98 pages 30,605 words document
P18 V15 P17 P22 V11
Open PDF directly ↗ View extracted text
👁 1 💬 0
📄 Extracted Text (30,605 words)
Gulfstrearn° Ail DYNAMICS C.CINIIMNY PRELIMINARY INVOICE Part/Model #: CHB AC Serial No./fail No.: 151 I N9093E Bldg C.-FAX 561-681-9392 • West Palm Beach. Ronda 33406 Mail Remittance To: Overnight Remittance To: Wire Remittance To: Gulfstream Aerospace Corporation Gulfstream Aerospace Corporation (Box # 730149) Gulfstream Aerospace Corporation P.O. Box 730349 do JP Morgan Chase Bank. NA JP Morgan Chase Bank. NA Dallas, Texas 75373-0349 ATTN: Dallas National Wholesale Lockbox TX1.0029 Chicago. IL 60670 14800 Frye Road Account No. 10-15825 Ft. Worth. TX 76155 Fcdwirc Routing No. (ABA) 021 000021 ACH Credit Routing No. (ABA1071 000 013 IIIII.1111.11.1111.111111I11.111 Bill To: HYPERION AIR, INC. Invoice Number: 7112000954 Invoice Date: 3/15/2012 3800 SOUTHERN BLVD Customer ID: CH200 SUITE 204 P.O. Number: WEST PALM BEACH, Florida 33406 Repair Station: FAA CRS 11002624N United States In Date: 02/06/2012 Out Date: 03/23/2012 Payment Type: Net 30-Open terms Payment Terms: Title: HYPERION AIR, INC. INVOICE SUMMARY FOR WORK ORDER NUMBER: SC10420 Time & Materials Flat Rate Total Labor USD: $27,009.12 $161,722.63 $188,731.75 Parts USD: $91,680.83 $6,500.00 $98.180.83 Services USD: $33,067.13 $0.00 $33,067.13 Detail Subtotal USD: $151,757.08 $168,222.63 $319,979.71 Subtotal USD: $319,979.71 Funds on Deposit USD: $0.00 Total USD: $319,979.71 For detail description of the work complied with see the Work Order Detail report. Unless otherwise indicated, all financial values listed in this document arc in US Dollars (USD). GAC_WorkOrderPreliminaryInvoiee.rpt Page I of 98 Printed: 3/23/2012 4:28:32P? Rd: 3 EFTA_R1_00012031 EFTA01734227 Bill To: HYPERION AIR, INC. WO It: SC10420 Invoice Number 7112000954 Item: 1 Airframe Gulfstream CHB Scheduled N909JE Team Manager: Sean Brown Part/Model GlIft Customer Coordinator: Ray Kraher AC Serial NoiTail No.: 151 / N909JE TSWTS0: CSN/CSO: 5663 Aircraft Time: 10804.3 Discrepancy: 1.1 Return to Service FAR 91.409 (013) Inspection Resolution: ACTT: 10,8043 ACTL: 5,663 DATE: March XX, 2012 I certify that this aircraft has been inspected in accordance with a Due list Inspection under the approved manufacturer's recommended inspection program, FAR 91.409 003) and is approved for return to service with regards to the maintenance accomplished. Further details of this inspection and related maintenance are on file at this repair station under the above work order. Thomas J. Choynowski, Sr. Airworthiness Inspector Gulfstream-PB1 1500-C Perimeter Road West Palm Beach, FL 33406 FAA CRS PB8R624N Step: 1.1.1 Waiting A/C Times and Cycles approval (L) Step: 1.1.2 Waiting A/C Warranty Status / Contracts approval (L) Discrepancy: 1.2 Inbound/Outbound Inspection Resolution: Complied with inbound inspection as required. Labor USD: No Charge N/ C Step: 1.2.1 Completed Inbound/Preliminary Inspection Step: 1.2.2 Waiting Outbound Inspection approval IL) Discrepancy: 13 Preflight Inspection Resolution: Discrepancy: 1.4 Comply with Debrief Checklist For detail description of the work complied with see the Work Order Detail report. Unless otherwise indicated, all financial values listed in this document arc in US Dollars (USD). GAC_Work0nlerPreliminaryInvoice.rpt Page 2 of 98 Printed: 3/23/2012 4:28:32P? Rd:3 EFTA_R1_00012032 EFTA01734228 Bill To: HYPERION AIR, INC. WO It: SC10420 Invoice Number 7112000954 Resolution: Complied with Debrief Checklist Step: 1.4.1 Completed Arrival/Debrief 90 Day Due List Review Accomplished. Step: 1.4.2 Completed List Operator's Airworthiness Requirements & Special Documentation Requests. Step: 1.4.3 Completed Review Technical Operations Update prior to return to service for newly released bulletins and advise operator. Discrepancy: 1.5 Tool Clearance Resolution: All tooling was returned to the toolrooni. Pans USD: No Charge N/ C Pans: Ref. No. Part number: Description Quantity 1.511 740031 Wing wedge templete Left Discrepancy: 1.6 Cover & Protect Resolution: Cover & Protected as required. Labor USD: No Charge N/ C Discrepancy: 1.7 Service Chemical Toilet/Clean Galley Resolution: N/A Discrepancy: 1.8 Arrival/Departure Assist & Video Aircraft Resolution: Arrival/Departure Assist & Video Aircraft as required. Discrepancy: 1.9 Sample Hydraulic Fluids Resolution: Sampled Hydraulic Fluids as required. For detail description of the work complied with see the Work Order Detail report. Unless otherwise indicated, all financial values listed in this document are in US Dollars (USD). GAC_WorkOrderPreliminaryInvoiee.rpt Page 3 of 98 Printed: 3/23/2012 4:28:32P? Rd:3 EFTA_R1_00012033 EFTA01734229 Bill To: HYPERION AIR, INC. WO SC10420 Invoice Number 7112000954 Discrepancy: 1.10 Remove Valuables & Secure. Resolution: N/A Discrepancy: 1.11 Comply with Service Team Manager Checklist Resolution: Discrepancy: 1.12 Fluids Used (Oils/Skydrol) - (Materials Only) Resolution: Billed as required. Discrepancy: 1.13 STM / Quality review of work order and logbook entry prior to departure Resolution: Discrepancy: 1.14 Towing (Does not include Hangar Moves) Resolution: Towed as required. Labor USD: No Charge N/ C For detail description of the work complied with see the Work Order Detail report. Unless otherwise indicated, all financial values listed in this document arc in US Dollars (USD). GAC_Work0rderPreliminaryInvoiee.rpt Page 4 of 98 Printed: 3/23/2012 4:28:32P? Rd: 3 EFTA_R1_00012034 EFTA01734230 Bill To: HYPERION AIR, INC. WO 0: SC10420 Invoice Number: 7112000954 Discrepancy: 1.15 IlazMat - Identify & provide a manifest, and a Shipper's Declaration for Dangerous Goods for all hazardous materials that are loaded aboard any aircraft. FAR Part 121 or 135 Operators will provide a hazardous material notification letter required by FAR 135.505 (e) prior to maintenance at this Repair Station iaw FAR 145.206 (a) (b). If there is to he loading of hazardous materials it shall be complied with by Hazmat trained authorized GDAS-PBI personnel only. Resolution: N/A Discrepancy: 1.16 Aircraft Cleaning Resolution: N/A Discrepancy: 1.17 Billable Consumables & Shop Supplies Resolution: as required. Billing Method Hours Rate Total Parts USD: Flat Rate $4,000.00 Total USD: $4,000.00 For detail description of the work complied with see the Work Order Detail report. Unless otherwise indicated, all financial values listed in this document arc in US Dollars (USD). GAC_Work0rderPreliminaryinvoiee.rpt Page 5 of 98 Printed: 3/23/2012 4:28:32P? Rd:! EFTA_R1_00012035 EFTA01734231 Bill To: HYPERION AIR, INC. WO SC10420 Invoice Number: 7112000954 Discrepancy: 1.18 Major Alterations regulatory compliance requirements to be completed by installer as indicated on FAA form 8110-3. Copy and paste from attached statements as needed and edit as required. COMPLY WITH REQUIREMENTS OF FAR 25.1301 (d). 25.1353(a) and 25.1431(c) (d). COMPLIED WITH THE REQUIREMENTS OF FAR 25.1301 (d), 25.1353(a) and 25.1431(c) (d), via GROUND TEST REPORT-REPORT No. CEXXXXXXXX REV. X, ( IN SUPPORT OF STC XXXXXXXXX ) and GR4R216M REPAIR STATION INTERFERENCE TESTING REQUIREMENTS POST MAJOR ALTERATIONS COMPLIANCE FORM. COMPLY WITH REQUIREMENTS OF FAR 25.1529, INSTRUCTIONS FOR CONTINUED AIRWORTHINESS. REF XXXXX MANUAL, P/N XXXXXXX REV. X, FOR INSTRUCTIONS FOR CONTINUED AIRWORTHINESS AND BLOCK 8 OF FAA FORM 337, DATED XX/XX/XXXX. COMPLY WITH THE WIRE ROUTING REQUIREMENTS OF FAA POLICY ANM-01-04 AND FAR 25.1353 (B) COMPLIED WITH THE WIRE ROUTING REQUIREMENTS OF FAA POLICY ANM-01-04 AND FAR 25.1353 (B) BY ENSURING ROUTING WAS IN ACCORDANCE AC43.13-1B, CHANGE 1 CHAPTER 11, SECTION 8. Resolution: N/A Discrepancy: 1.19 Update Weight & Balance Resolution: N/A For detail description of the work complied with see the Work Order Detail report. Unless otherwise indicated, all financial values listed in this document arc in US Dollars (USD). GAC_Work0nterPreliminaryInvoice.rpt Page 6 of 98 Printed: 3/23/2012 4:28:32P? Rd:3 EFTA_R1_00012036 EFTA01734232 Bill To: HYPERION AIR, INC. WO #: SC10420 Invoice Number: 7112000954 Discrepancy: 1.20 Exterior Paint and Weight & Balance Requirements. Review scope of aircraft exterior paint touch-up/repairs. and skin replacements resulting in paint reapplication. and determine affect on weight and balance. For surfaces where paint is stripped and reapplied or added on top of existing paint on an area greater than 36 square feet the thickness values will be documented before and after painting . If average thickness values remain the same, weight and balance revision is not required. For surfaces painted with an area greater than 36 square feet and before and after paint thickness average varies, QC review for possible weight and balance revision will be required. * Thickness will be plotted on an aircraft drawing derived from AM! chapter 6 or other suitable sketch, attached to the work order and measurements taken on a two square foot grid. * Reference CAMPS 4000, paragraph 3.5.1 for paint restrictions to flight control surfaces and RVSM certified aircraft. * Reference CAMPS 4000, total average thickness shall not exceed 6 mils. * Per GAC Mass Properties Engineering, paint thickness of 5 mils equals .055 pounds per square foot. * It after QC review, weight change is greater than 2 pounds or .05% of MAC, the weight and balance report will require I-I:computation. Resolution: N/A Discrepancy: 1.21 "Advise customer of preservation requirements per ATA Chapter 10 of the relevant maintenance manuals for Airframe. Engines, and API;; review requirements in relation to scheduled Date Promised and later potential Date Completed; and perform maintenance or preservation actions as directed by the customer and documented as a Work Order Squawk. Resolution: N/A Item: 6 Avionics Team Manager: Sean Brown ParUModel N: Customer Coordinator: Ray Kraber AC Serial No./Tail No.: TSWTS0: CSN/CSO: Aircraft Time: Discrepancy: 6.1 MED emergency light does not illuminate when EMER LT switch is turned on or in the AUTOMATIC mode. Works when switch is placed in MANUAL Resolution: Performed operational check. Found MED emergency light works in manual but not automatic. Gained access to MED emergency lights. Found G-switch tripped. Reset G-switch. Performed operational check. Checks good. All work performed IAW G-II AMM chapter 33-02-00. For detail description of the work complied with see the Work Order Detail report. Unless otherwise indicated, all financial values listed in this document are in US Dollars (USD). GAC_Work0nlerPreliminaryInvoiee.rpt Page 7 of 98 Printed: 3/23/2012 4:28:32P? Rd:3 EFTA_R1_00012037 EFTA01734233 Bill To: HYPERION AIR, INC. WO It: SC10420 Invoice Number 7112000954 Billing Method Hours Rate Total Labor USD: Time and Material ST 2.83 @ $115.00 $325.45 Total USD: $325.45 Discrepancy: 6.2 An entryway light inop. Resolution: Item: 8 Mechanical Team Manager: Sean Brown Pan/Model ft: Customer Coordinator: Ray Kraber AC Serial No.fTail No.: TSN/TS0: CSN/CS0: Aircraft Time: Discrepancy: 8.1 Extra time for removing BUL-1 & BUI.-2 so that BUL-3 can be removed for elevator removal. Note: these panel not on removal sheet for elevators. Resolution: Complied with info only. Billing Method Hours Rate Total Labor USD: Flat Rate $920.00 Total USD: $920.00 Discrepancy: 8.2 While complying with CMP# 272015, Right aileron removal/installation, found most screws corroded/rusted. Quantity : ( 100 ) ( P/N: NAS 1203.3) screws, ( 40 ( P/N: NAS 1203.5) screws. NOTE: Quantity included's rusted/corroded Left aileron R&R panel screws. Resolution: Installed new screws as reuired. P/N NAS 1203-3 and NAS 1203-5. IAW CHB AMM 27-00-00 and 20-00-00. Billing Method Hours Rate Total Labor USD: Flat Rate $230.00 Pans USD: Time and Material $300.32 Total USD: $530.32 For detail description of the work complied with see the Work Order Detail report. Unless otherwise indicated, all financial values listed in this document arc in US Dollars (USD). GAC_Work0rderPreliminaryInvoiee.rpt Page 8 of 98 Printed: 3/23/2012 4:28:32P? Rd:3 EFTA_R1_00012038 EFTA01734234 Bill To: HYPERION AIR, INC. WO #: SC10420 Invoice Number 7112000954 Pans: Ref. No. Pan number: Description Quantity Sell price USD Extended USD 8.2 #1 NASI203-3 BOLT 100 $0.26 $26.00 8.2 #2 NASI203-5 BOLT SO $0.26 $13.00 8.2 #3 GASSS0E3S9 SCREW 10 $4.12 $41.20 8.2 #4 GAS550E3S10 SCREW 4 $1.81 $7.24 8.2 #5 NAS583-1I BOLT 4 $24.66 $98.64 8.2 #6 NAS583-13 BOLT 2 $15.68 $31.36 8.2 #7 NAS583-14 BOLT 2 $23.77 $47.54 8.2 #8 NAS583-I 6 BOLT 2 $17.67 $35.34 Discrepancy: 8.3 While comply with CMP 272810 Rudder removal. Found upper bonding wire broken at vert stab Resolution: Removed broken upper rudder bonding wire at vert stab P/N M525083-2BB13 and replaced with new bonding wire P/N MS25083-2BB13 lAW GI1B ANEW 20-00-00. Billing Method Flouts Rate Total Labor USD: Flat Rate $230.00 Parts USD: Time and Material $10.30 Total USD: $240.30 Pans: Ref. No. Part number: Description Quantity Sell price USD Extended USD 8.3 #1 M525083-2BBI3 JUMPER-ELEC BONDING,13 IN 1 $10.30 S10.30 Discrepancy: 8.4 While complying with CMP#'s 575030/575025 , Wing to fuselage interior Left/Right inspection, found ALL screws rusted/corroded. Most needed screwbusters for removal which amounted to considerable time over CMP aloted time. Screws needed as follows: P/N: MS24694s50 : Qty: 330 P/N: 1159B21241-71 Qty: 1 P/N: 1159B21241-78 Qty: 1 P/N: 1159B21241-33 Qty: 1 P/N: 1159821241-73 Qty: 1 P/N: 1159521241-81 Qty: 1 P/N: 1159B21241-35 Qty: 1 Resolution: Removed and discarded corroded screws and installed new screws.P/N: MS24694550 : Qty: 330 P/N: 1159B21241-71 Qty: I P/N: 1159821241-78 Qty: 1 P/N: 1159B21241-33 Qty: I P/N: 1159B21241-73 Qty: P/N: 1159B21241-81 Qty: I P/N: 1159B21241-35 Qty: 1 All work done i/a/w G-11 B SRM ch 51-41-00. No further defects noted. For detail description of the work complied with see the Work Order Detail report. Unless otherwise indicated, all financial values listed in this document arc in US Dollars (USD). GAC_WorkOnlerPreliminaryInvoice.rpt Page 9 of 98 Printed: 3/23/2012 4:28:32P? Rd:3 EFTA_R1_00012039 EFTA01734235 Bill To: HYPERION AIR, INC. WO I: SC10420 Invoice Number: 7112000954 Billing Method Hours Rate Total Labor USD: Flat Rate $460.00 Parts USD: Time and Material $78.00 Total USD: $538.00 Pans: Ref. No. Pan number: Description Quantity Sell price USD Extended USD 8.401 MS24694-S50 SCREW-MACHINE.FLAT CSK HEAD 300 $0.26 $78.00 Discrepancy: 8.5 Change float valve mid point on right wing per customer. Resolution: Remove vent float valve P/N 159SC-P-006 S/N1010. Install a New float valve P/N 159SCP006-1 S/N 4771. Install new 0 rings under mount screw heads. All work performed JAW CHB AMM 28-02-00. Billing Method Hours Rate Total Labor USD: Time and Material ST 15.88 @ $115.00 $1,826.20 Labor USD: Time and Material OT 0.13 @ $173.00 $22.49 Parts USD: Time and Material $2,557.27 Total USD: $4,405.96 Pans: Ref. No. Pan number: Description Quantity Sell price USD Extended USD 8.501 1159SCP006-1 PUMP 1 $1.925.35 $1,925.35 8.5 03 HT183-3-2 SCREW 3 $197.76 $593.28 8504 GAS13AF6 0 -RING 3 $12.88 $38.64 Step: 8.5.1 Completed Remove float valve mid point on right wing P/N159SC-P-006 S/N 1010. Work IAW CHB MM 28-02-00 Step: 8.5.2 Completed Positioned new float valve in place, P/N 1159SCP006.1, S/N 4771, and tightened mounting screws. Moat valve will have to be removed in order to install 3 o-rings that are to he placed under mounting screws. Refer to Gulfstream lilt 1PC 28.10.00 figure 6, sheet I, item 3.O-rings are on order. Step: 8.5.3 Completed Install 3 o rings under float valve mounting screw heads IAN' CHB AMM 28-01-01. Discrepancy: 8.6 Nine rivnuts need replaced on Rill wing wedge panel. Required drilling of screws due to rivnuts spinning. Resolution: Removed and replaced nine rivnuts on the R/H wing wedge panel. Installed new rivnuts P/N GAN512B3-166 wet with sealant. Had to gain acess to fuel tank area to remove drilled out rivnuts All work done IAW G-IIB SRM 51-41-00. Billing Method I lours Rate Total Labor USD: Time and Material ST 13.44 @ $115.00 $1,545.60 Labor USD: Time and Material OT 435 @ $173.00 $752.55 Parts USD: Time and Material $273.47 Total USD: $2,571.62 Pans: Ref. No. Pan number: Description Quantity Sell price USD Extended USD 8.6 01 GAN51283-166 BLIND NUT 10 $1.52 $15.20 For detail description of the work complied with see the Work Order Detail report. Unless otherwise indicated, all financial values listed in this document arc in US Dollars (USD). GAC_WorkOrderPrcliminaryInvoiec.rpt Page 10 of 98 Printed: 3/23/2012 4:28:32P? Rd: 3 EFTA_R1_00012040 EFTA01734236 Bill To: HYPERION AIR, INC. WO #: SC10420 Invoice Number: 7112000954 Parts: Ref. No. Part number: Description Quantity Sell price USD Extended USD 8.6 #2 GAN512B3-216 NUT 10 $6.10 $61.00 8.6 #3 GAN512B3-266 RIV-NUT 10 $15.88 $158.80 8.6 #4 PR1422-B-2 SEALANT. PRC, CARTRIDGE 1 $38.47 $38.47 Step: 8.6.1 Completed Disconnected the 5 hydraulic lines to gain access to the sponson access cover 22-SR-2 all lines are capped and or plugged. RLP Step: 8.6.2 Completed Removed access cover 22,SR-2 on outboard side of sponson Step: 8.6.3 Completed Removed all spinning and bad rivnuts on the Rill wing wedge panel IAW 6-IIB AMM 51-40-00. Discrepancy: 8.7 Left wing flap tracts A,B,C, and D have corrosion on roller hearing surfaces. Resolution: Removed corrosion from flap track bearing surfaces on tracks A,B,C and D IAW GLIB CPCM 20-50-01.Measured tracks A,B,C and D for thickness as required IAW Gulftream drawing SE05811901. See item 8.88 for details on track C. All others check good. Performed brush cadmium plating repair to all exposed surfaces of flap tracks A,B,C and D LAW Gulftream drawing SE05811901.Cleaned and protected tracks and surrounding area, masked-off track bearing surface, applied two coat epoxy primer 2012 and surface primer, applied top coat, LAW. GAME'S 4000. Billing Method Hours Rate Total Labor USD: Flat Rate $6,900.00 Pans USD: Time and Material $153.12 Total USD: $7,053.12 Pans: Ref. No. Part number: Description Quantity Sell price USD Extended USD 8.7 #1 PRIMO-B-I/2 SEALANT, PRC,CARTRIDGE 4 $38.28 $153.12 Step: 8.7.1 Completed Removed corrosion from flap track beating surfaces on tracks A.B.0 and D IAW GI1B CPCM 20.50.01. Step: 8.7.2 Completed Measure tracks A,B,C and Dfor remaining thickness. Step: 8.73 Completed Performed brush cadmium plating repair to all exposed surfaces of flap tracks A,B,C and D JAW Gulftream drawing SEU5811901. Step: 8.7A Completed Cleaned and protected tracks and surounding area. masked-off track bearing surface, applied two coat epoxy primer 2012 and surface primer, Prep. tracks to top coat. LAN'. (;AMPS 4000. Discrepancy: 8.8 Right wing flap tracts A,B,C, and D have corrosion on roller bearing surfaces. Resolution: Removed corrosion from flap track bearing surfaces on tracks A,B,C and D IAW GIIB CPCM 20-5041.Nleasured tracks A,B,C and D for thickness as required IAW Gulftream drawing SF,05811901, with no defects noted. Performed brush cadmium plating repair to all exposed surfaces of flap tracks A,B,C and D IAW Gulftream drawing SE05811901.Nlasked ott flaps tracks A B C and D. washed with solvent and primed with 2012 primer, and applied topcoat LAW CAC CAMPS 4000. Billing Method Gouts Rate Total Labor USD: Flat Rate $6,900.00 Total USD: $6,900.00 For detail description of the work complied with see the Work Order Detail report. Unless otherwise indicated, all financial values listed in this document are in US Dollars (USD). GAC_WorkOnlerPreliminaryInvoiee.rpt Page I I of 98 Printed: 3/23/2012 4:28:32P? Rd:3 EFTA_R1_00012041 EFTA01734237 Bill To: HYPERION AIR, INC. WO A: SC10420 Invoice Number 7112000954 Step: 8.8.1 Completed Removed corrosion from flap track bearing surfaces on tracks A,B,C and D IAW GDR CPCM 20-50-01. Step: 8.8.2 Completed Measure tracks A,B,C and Dfor remaining thickness. Step: 8.83 Completed Performed brush cadmium plating repair to all exposed surfaces of flap tracks A.B.0 and D Gulftream drawing SEOS811901. Step: 8.8.4 Completed Cleaned and protected tracks and surounding area, masked-off track bearing surface, applied two coat epoxy primer 2012 and surface primer, Prep. tracks to top coat. IAW. GAMPS 4000.1 Written in ERROR this step belongs under item 8.7 ) Refer to squawk 8.7.4. Step: 8.8.5 Completed Masked off flaps tracks A B C and D, washed with solvent and primed with 2012 primer ready to spray paint. Discrepancy: 8,9 Jill wing wedge has 18 drilled off screw heads because rivnuts were spining. Resolution: Removed and replaced eighteen rivnuts on the IAI wing wedge panel. Installed new rivnuts P/N GANS12B3.166 wet with sealant. Had to gain acess to fuel tank area to remove drilled out rivnuts All work done TAW G-1111 SRM 51-41-00. Billing Method Hours Rate Total Labor USD: Flat Rate $2,300.00 Parts USD: Time and Material $117.00 Total USD: $2,417.00 Parts: Ref. No. Part number: Description Quantity Sell price USD Extended USD 8.911 GABSIIGA3-7 HI-BOLT 1 $2.06 $2.06 8.9/2 PR1422-B-2 SEALANT, PRC, CARTRIDGE 1 $38.47 $38.47 8.9 /3 GAN512B3-166 BLIND NUT 25 $1.52 $38.00 8.9 14 PR1422-B-2 SEALANT, PRC, CARTRIDGE 1 $38.47 $38.47 Step: 8.9.1 Completed Removed all spinning and bad limits on IA1 wing wedge IAW G-IIB AMM 51-40-00. Discrepancy: 8.10 Aileron trim tab has cracked skin in the area of the inner and outter hinges on the bottom side of the tab. Resolution: Trimmed aileron tab hinge skin areas as required IAW Gulfstream drawing SE35813107. Billing Method flours Rate Total Labor USD: Flat Rate $460.00 Total USD: $460.00 Discrepancy: 8.11 Rill elevator, top, inbd, hinge cover attach screw hole, heli-coil is bad. Resolution: Replaced bad RBI elevator, top. inbd, hinge cover attach screw hole, heli-coil with a new one IAW GAMPS 2212. Checks good. Billing Method Hours Rate Total Labor USD: Flat Rate $460.00 For detail description of the work complied with see the Work Order Detail report. Unless otherwise indicated, all financial values listed in this document are in US Dollars (USD). GAC_WorkOnlerPrcliminaryInvoice.rpt Page 12 of 98 Printed: 3/23/2012 4:28:32P? Rd: 3 EFTA_R1_00012042 EFTA01734238 Bill To: HYPE:RION AIR, INC. WO #: SC10420 Invoice Number: 7112000954 Total USD: $460.00 Discrepancy: 8.12 IJH elevator No.3 hinge, attach boll bore is corroded. Resolution: Removed corrosion as required and remeasured 1/11 elevator No.3 hinge. attach bolt bore. Hole measurement is within limits. Work performed IAW GLIB MM 27-01-00. and SRM 51.13.10. Billing Method Hours Rate rota' Labor USD: Flat Rate $460.00 Total USD: $460.00 Discrepancy: 8.13 It/II elevator. oubd top skin, has a spot of corrosion. Resolution: Removed light corrosion spot on R/H elevator outbd top skin, Sanded treated and primed lop coat as required JAW GIV gamps 4000 Billing Method Hours Rate Total labor USD: Flat Rate $345.00 Total USD: $345.00 Step: 8.13.1 Completed Removed and blend out light surface corrosion from the R/H elevator, upper surface Treated bare metal, and spot primer as required. IAW. SRM.51.13.20. Discrepancy: 8.14 R/H wing upper sponson plate is corroded. Resolution: Mechanically removed corrosion from edges of the RAJ upper sponson plate, Strip heavy paint for a better look IAW. GAC. SFA5802903. Removed all old sealant from around sponson plate. Treated and primed all bare metal. Resealed sponson plate. All work done JAW Standard Repair/Corrosion of Sponson Plates DWG No. SF45802903 REV.D. Performed cadmium plating repair on R/H upper sponson plate. All work done IAW Standard Repair/Corrosion of Sponson Plates DWG No. SE45802903 REV.D Billing Method Hours Rate Total Labor USD: Time and Material ST 17.65 @ 5115.00 $2,029.75 Labor USD: Time and Material OT 4.33 @ 5173.00 $749.09 Services USD: Time and Material $400.00 Total USD: $3,178.84 Services: Ref. No. Description Quantity Sell Price USD Extended USD For detail description of the work complied with see the Work Order Detail report. Unless otherwise indicated, all financial values listed in this document are in US Dollars (USD). GAC_WorkOnlerPreliminaryInvoicc.rpt Page 13 of 98 Printed: 3/23/2012 4:28:32P? Rd: 3 EFTA_R1_00012043 EFTA01734239 Bill To: HYPF:RION AIR, INC. WO 8: SC10420 Invoice Number 7112000954 Services: Ref. No. Description Quantity Sell Price USD Extended USD 8.14 111 SERVICE 1.00 $400.00 $400.00 Step: 8.14.1 Completed Mechanically removed corrosion from edges of the Rai upper sponson plate. Strip heavy paint for a better look JAW. GAC. SE45802903. Step: 8.14.2 Completed Removed all old sealant front around sponson plate. Treated and primed all bare metal. Resealed sponson plate. All work done LAW Standard Repair/Corrosion of Sponson Plates DWG No. 5E45802903 REV.I) Step: 8.14.3 Completed Performed cadmium plating repair on IUD upper sponson plate. All work done IAW Standard Repair/Corrosion of Sponson Plates DWG No. SE45802903 REV.D Discrepancy: 8.15 WEI wing flap has 2 spots of corrosion. (Marked) Resolution: Removed light surface corrosion from WH flap upper surface [outboard flap track &mid track]. Cleaned treated bare metal, primer and top coat as required. All work performed IAW. CAMPS 4000. Billing Method Hours Rate Thal Labor USD: Flat Rate $1,150.00 Total USD: $1,150.00 Step: 8.15.1 Completed Removed and blend out light surface corrosion from the R/H Flap, upper surface around 44 track, Treated bare metal. and spot primer as required. IA
ℹ️ Document Details
SHA-256
4abdb1cfdcc8d35c30855beefbd25fda13d627c4b508a0a20cfa779499aa9371
Bates Number
EFTA01734227
Dataset
DataSet-10
Document Type
document
Pages
98

Comments 0

Loading comments…
Link copied!