EFTA01792737
EFTA01792739 DataSet-10
EFTA01792742

EFTA01792739.pdf

DataSet-10 3 pages 809 words document
P17 P23 V16 P24 D4
Open PDF directly ↗ View extracted text
👁 1 💬 0
📄 Extracted Text (809 words)
From: Warwick Wicksman <warwic Sent: Friday, April 29, 2011 9:50 P To: Jeffrey Epstein Cc: gary; Tom Sze Subject: RE: LS1 Flagpole Pool Images - Email 1 of 2 I agree with what you are saying about the connection over to =he library. But I think we have made a lot of progress on all of the other areas= We have moved a long way from the last time I was at the Island, and=we had the open pool northeast of the main residence, at the low elevation=just above the road. We want to work with you to move this forward, but there are s=ill many moving targets at the main residence. Is the livin= room location set? Are the north terraces set? As soon as we have your comments about the paving images I jus= sent, we will prepare some detail paving patterns to review. Thanks, Warwick Warwick Wicksman, AIA =nbsp; &nb=p; =nbsp; Gensler 2500 Broadway Suite 300 Santa Monica, California 90404 USA http://www.Gensler.com <http://www.gensler.com/> Cl=ck here to view Gensler's 2010 Annual Report. <http://www.gensler.com/uploads/doc=ments/AR_2010_02_18_2011.pdf> From: Jeffrey Epstein [mailto:[email protected] Sent: Friday, April 29, 2011 2:36 PM To: Warwick Wicksman Cc: gary Subject: Re: LSJ Flagpole Pool Images - Email 1 of 2 Warwick„ I am at loss. yes there were variati=ns„ however in the past three months, moving the living room up an= down is not a real variation.. The circulation that i stated was a priority , still shows this ridculus dust pan at the end of the road= sorry.. its not fair On Apr 29, 2011, at 5:28 PM, Warwick Wicksman wrote:</=:p> Jeffrey, We did agree to provid= some reference images for decking. On the recent directive to go with all 16x16 coral stone, I had put that aside. Attached are the reference images we had=gathered. EFTA_R1_00124757 EFTA01792739 I also attached patter= diagrams based on this week's emails. These do not represent the actual images, just the areas we would like to delineate. We need your feedback on the im=ges first. • &nbs=; Option 1: Based on desire=for main field to be 16x16 coral stone. Placed at 45 degree angle. Pool border, area in front of building, and carpet at shade structure would all be larger pattern. • &nbs=; Option 2: Our preference =or the main field would be larger stone, about 30x30, placed on a 45 degre= angle. Pool borde= and areas by steps and building could be 16x16 accent stone, orthogonal. • &nbs=; Option 3: Similar to Opti=n 2, but omitted path from steps to building. I do not think that area needs to be defined.&n=sp; More detailed pattern at the shade structure. • &nbs=; Option 4: Similar to Opti=n 3, but with a more detailed pattern at detailed pattern at the shade str=cture and in front of the building. On our last couple of =ails, I mentioned that now that the layout was pretty set, we need to re-e=gage a landscape designer to work on Hardscape and Landscape for this area. (That is typically how we addres= that scope, as that is not our expertise.) We discussed the difficulty of having someone fro= here do that work, as that person needs to be on the island. = thought Gary had someone local lined up for this, but if not, we can look=for the right consultant. Please remember that w=ile it is true we were released to start in December, our focus has been s=ifting back and forth from the flagpole area to the main residence. During this time, we've provided a design development se= of drawings for the flagpole pool area building and shade structures - mi=sing only paving for the deck and landscape. Also, we have generated almost 40 variations of the main residence area, includi=g open pools, enclosed pools below living rooms, numerous terrace layouts,=and the current pool location version. Both in hand sketches, cad sketches, and 3d Sketchup models. It seems to me that no= that both areas are getting pretty set (flagpole pool and living room/mai= pool), we should be able to finish off the flagpole area, and start to do some detailed design on the main re=idence area. Thanks, Warwick &nbs=; =nbsp; &n=sp; Warwick Wicksman, AIA<=:p> Princi al< = an> &nbs=; &=bsp; &nbs=; &=bsp; Gensler 2500 Broadway Suite 300</=pan> Santa Monica, Cal=fornia 90404 USA<=p> http://www.Gensler.com <http://www.=ensler.com> Click here to view Gen=ler's 2010 Annual Report. Original Message-=--- From: jeffrey epstein =mailto:[email protected]] Sent: Friday, April 29= 2011 6:12 AM To: Warwick Wicksman Cc: Garykerney; D=rren Indyke Subject: Since december I have asked for a hardscape =plan for flagpole pool and circulation from master to library. The =roject is extremely delayed . 3 months ago you toldme that you would send images and a first pass . To date nothing received 2 EFTA_R1_00124758 EFTA01792740 Sorry for all the typo= .Sent from my iPhone <LSJ Paving Images = low res.pdf> 3 EFTA_R1_00124759 EFTA01792741
ℹ️ Document Details
SHA-256
4bf8dc687b57ecf565f5c6b72efc3ad83c24c712c7726b95d37987af918e4ffd
Bates Number
EFTA01792739
Dataset
DataSet-10
Document Type
document
Pages
3

Comments 0

Loading comments…
Link copied!