EFTA02490093
EFTA02490094 DataSet-11
EFTA02490098

EFTA02490094.pdf

DataSet-11 4 pages 1,206 words document
D6 P17 P23
Open PDF directly ↗ View extracted text
📄 Extracted Text (1,206 words)
From: jeffrey E. <[email protected]> Sent: Friday, August 28, 2015 10:02 PM To: Leighton Allenby Subject: Re: i in not sure what the storm has to do with pricing . omar,=buck steel. there is an entire section that has liiitle =f anyting to do with the storm. ? no updates-. t=ank you for helping with the beach. . see you tomorw =A0 On Fri, Aug 28, 2015 at 5:07 PM, Lei hton Allenby aa href="mailto target="_blank" a» wrote: He=lo Mr. Epstein, Prepping for the storm has consumed my =ime and the staffs time as well. I cannot control mother nature. =div> Omar came over and looked at job on 21st and despite re=eated calls I have not received final pricing. I called him earlier today =nd now have his square foot price which I will convert to a final number a=ter I look up block cost for large 250' wall which I measured with Chr=s the other day and its 385' long. I will have this to you this evenin=. Chris said you wanted this wall two cement blocks wide (running linear b= 10' tall, stone faced on the top and driveway side. The block side fa=ing the maintenance buildings would be painted. Is=that correct? I have been on the excavator repai=ing the barge ramp and road access to the driveway to the left of the boat=dock as it was washed away form the storm and no staff was on LSJ today - =he pricing would have been completed earlier. I have stopped as the barge =sn't coming over until Wednesday. Right now no inte=net, we just went back on power and the alarms are sounding in the generat=r panel room and I am dealing with that....Anna spoke with Danny on phone =was told by Anna Danny said this happens all the time and he will reset in=the AM). Danny has not returned my text or call. Terrance is working=on the internet problem remotely and will come over in the AM if he cannot=fix. I will update the timeline to reflect days m=ssed by staff and storm preparation and cleanup by tomorrow am. =br> The barge isn't going to do our runs until Wednesday - t=ey are on one engine I will put on the timeline t=e # 8 from the update from August 11th meeting - see email below <=div> 8. Kevin from laredian mentioned that the working d=awings should be completed by the end of September. They had to have plans=modified for proper venting for carpenters shop and fertilizer/chemical st=rage. Best, =tbody> EFTA_R1_01610925 EFTA02490094 Leighton Allenby ca/span> Aug 11<=span> <https://mail.google.com/=ail/u/0/images/cleardot.gif> <https://mail.google.com/mail/u/0/images/cle=rdot.gif> 3:54 PM (1 hour ago) to Jeffrey, =A0NYC, Anna, Daphne=/span> <https://mail.google.com/mail/u/0/images/clear=ot.gif> Hello Mr. =pstein, Today Anna, Danny Vicars and I met with David Rosa from CZM an= Kevin from The Jaredian Design Group to discuss: 1. Layout of the proposed maintenance and workshop=building project 2. Two roofs for the RO P=ant and Generator building. The meeting went well.=Concerns & comments brought up by David Rosa: 1. New height of RO and Generator roof from across the w=ters. I replied that the pitch of the roof was aesthetically pleasing and =oof color chosen by you is soft and blends into the skies. He quickly agre=d. 2. He had no concerns with proposed bui=ding and 80 foot layout and placement of building. We walked the proposed =ayout that Danny Vicars laid out with orange markers. 3. David had a complaint from someone that we discussed.=Complaint was that we were creating stone buffers preventing boaters from =oming ashore to the beaches. I assured him this wasn't happening since=l started and that there were natural reefs that prevented the boaters fro= coming ashore. He agreed an said that he had to ask as there was a compla=nt. (Most likely someone saw machines removing rocks from the shore for th= waterfall. We need to be careful.) 4. Dav=d wanted to inspect grading of roads. We showed him one of the roads going=from maintenance building to tennis court and he was pleased. 5. We discussed putting in drainage swales after the as=halt and minimizing damage and he agreed that we would have better control=of the water rather than guessing where the drainage swales should be. Dav=d wants protective erosion control at each new drainage swale per permitt.=l agreed. 6. We discussed the Coastal Zone=Management Act (CZMA) and why it is important for us to observe this Act.=C2 http://www.coralreetgov/grants/noaa/USVI-CZMFact=heet-Jun03.pdf <http://www.coralreef.gov/grants/noaa/USVI-CZMFactsheet-Jun=3.pdf> 7. David and I discusse= my qualifications, previous projects on coastal zones and my working with=the Town of Falmouth conservation Department on various projects on Cape C=d. David is from Arlington, VA 8. Kevi= from Jaredian mentioned that the working drawings should be completed by =he end of September. They had to have plans modified for proper venting fo= carpenters shop and fertilizer/chemical storage. 9. Daphne gave me a set of drawings that I will review. <=i style="margin-left:15px">l asked David if he will sign off on project =nd David commented that most likely after he reviews the plans once more.<=li> Best, Leighton <https://srl.gstatic.corn/ui/vVicons/mail/images/cleardot.gif> <=iv class="gmail_extra"> 2 EFTA_R1_01610926 EFTA02490095 Leighton Allenby Director of Properties a=pan> On Fri, Aug 28, 2015 at 3:54 PM, jeffrey E. =span dir="ltr"><[email protected] <mailto:[email protected]> wrote: timline has changed???? I!! why? <=iv> On Fri, =ug 28, 2015 at 2:37 PM, LAIlenby <mailto > wrot=: Drawings by end=of Sept Leighton Allenby Director of Properties <mailto On Aug =8, 2015, at 2:26 PM, jeffrey E. <[email protected] <mailto:jeevacation®gmail.co=» wrote: where are we with all the omar =ids on the timleine , the storm should not have held up =ids , same with drawgings for maintenace et. =div> =C2 please note The information contained in this communication =s confidential, may be attorney-client privileged, may constitute in=ide information, and is intended only for the use of the addressee. It =s the property of JEE Unauthorized use, disclosure or copying of thi= communication or any part thereof is strictly prohibited and may be=unlawful. If you have received this communication in error, please noti=y us immediately by return e-mail or by e-mail to [email protected] <mailto:[email protected]> , and des=roy this communication and all copies thereof, including all attachment=. copyright -all rights reserved 3 EFTA_R1_01610927 EFTA02490096 please n=te The information contained in this communication is confident=al, may be attorney-client privileged, may constitute inside informatio=, and is intended only for the use of the addressee. It is the property=of JEE Unauthorized use, disclosure or copying of this communicat=on or any part thereof is strictly prohibited and may be unlawful. If y=u have received this communication in error, please notify us immediate=y by return e-mail or by e-mail to [email protected] <mailto:jeevacation@gmail.=om> , and destroy this commu=ication and all copies thereof, including all attachments. copyright -a=l rights reserved please =ote The information contained in this communication is confiden=ial, may be attorney-client privileged, may constitute inside informati=n, and is intended only for the use of the addressee. It is the propert= of JEE Unauthorized use, disclosure or copying of this communica=ion or any part thereof is strictly prohibited and may be unlawful. If =ou have received this communication in error, please notify us immediat=ly by return e-mail or by e-mail to [email protected] <mailto:jeevacation@gmail=com> , and destroy this comm=nication and all copies thereof, including all attachments. copyright -=11 rights reserved 4 EFTA_R1_01610928 EFTA02490097
ℹ️ Document Details
SHA-256
4e1f702773ae3ba42f3a4a6924152ea38688b64d1b1cab57daf6fd7afcf1feaf
Bates Number
EFTA02490094
Dataset
DataSet-11
Document Type
document
Pages
4
Link copied!