📄 Extracted Text (1,206 words)
From: jeffrey E. <[email protected]>
Sent: Friday, August 28, 2015 10:02 PM
To: Leighton Allenby
Subject: Re:
i in not sure what the storm has to do with pricing . omar,=buck steel. there is an entire section that has liiitle =f
anyting to do with the storm. ? no updates-. t=ank you for helping with the beach. . see you tomorw =A0
On Fri, Aug 28, 2015 at 5:07 PM, Lei hton Allenby aa href="mailto
target="_blank" a» wrote:
He=lo Mr. Epstein,
Prepping for the storm has consumed my =ime and the staffs time as well. I cannot control mother nature.
=div>
Omar came over and looked at job on 21st and despite re=eated calls I have not received final pricing. I called
him earlier today =nd now have his square foot price which I will convert to a final number a=ter I look up block cost for
large 250' wall which I measured with Chr=s the other day and its 385' long. I will have this to you this evenin=. Chris said
you wanted this wall two cement blocks wide (running linear b= 10' tall, stone faced on the top and driveway side. The
block side fa=ing the maintenance buildings would be painted. Is=that correct?
I have been on the excavator repai=ing the barge ramp and road access to the driveway to the left of the
boat=dock as it was washed away form the storm and no staff was on LSJ today - =he pricing would have been
completed earlier. I have stopped as the barge =sn't coming over until Wednesday.
Right now no inte=net, we just went back on power and the alarms are sounding in the generat=r panel room
and I am dealing with that....Anna spoke with Danny on phone =was told by Anna Danny said this happens all the time
and he will reset in=the AM). Danny has not returned my text or call. Terrance is working=on the internet problem
remotely and will come over in the AM if he cannot=fix.
I will update the timeline to reflect days m=ssed by staff and storm preparation and cleanup by tomorrow am.
=br>
The barge isn't going to do our runs until Wednesday - t=ey are on one engine
I will put on the timeline t=e # 8 from the update from August 11th meeting - see email below
<=div>
8. Kevin from laredian mentioned that the working d=awings should be completed by the end of September.
They had to have plans=modified for proper venting for carpenters shop and fertilizer/chemical st=rage.
Best,
=tbody>
EFTA_R1_01610925
EFTA02490094
Leighton Allenby ca/span>
Aug 11<=span>
<https://mail.google.com/=ail/u/0/images/cleardot.gif>
<https://mail.google.com/mail/u/0/images/cle=rdot.gif>
3:54 PM (1 hour ago)
to Jeffrey, =A0NYC, Anna, Daphne=/span>
<https://mail.google.com/mail/u/0/images/clear=ot.gif>
Hello Mr. =pstein,
Today Anna, Danny Vicars and I met with David Rosa from CZM an= Kevin from The Jaredian Design Group to
discuss:
1. Layout of the proposed maintenance and workshop=building project
2. Two roofs for the RO P=ant and Generator building.
The meeting went well.=Concerns & comments brought up by David Rosa:
1. New height of RO and Generator roof from across the w=ters. I replied that the pitch of the roof was
aesthetically pleasing and =oof color chosen by you is soft and blends into the skies. He quickly agre=d.
2. He had no concerns with proposed bui=ding and 80 foot layout and placement of building. We walked
the proposed =ayout that Danny Vicars laid out with orange markers.
3. David had a complaint from someone that we discussed.=Complaint was that we were creating stone
buffers preventing boaters from =oming ashore to the beaches. I assured him this wasn't happening since=l started and
that there were natural reefs that prevented the boaters fro= coming ashore. He agreed an said that he had to ask as
there was a compla=nt. (Most likely someone saw machines removing rocks from the shore for th= waterfall. We need
to be careful.)
4. Dav=d wanted to inspect grading of roads. We showed him one of the roads going=from maintenance
building to tennis court and he was pleased.
5. We discussed putting in drainage swales after the as=halt and minimizing damage and he agreed that
we would have better control=of the water rather than guessing where the drainage swales should be. Dav=d wants
protective erosion control at each new drainage swale per permitt.=l agreed.
6. We discussed the Coastal Zone=Management Act (CZMA) and why it is important for us to observe this
Act.=C2 http://www.coralreetgov/grants/noaa/USVI-CZMFact=heet-Jun03.pdf
<http://www.coralreef.gov/grants/noaa/USVI-CZMFactsheet-Jun=3.pdf>
7. David and I discusse= my qualifications, previous projects on coastal zones and my working with=the
Town of Falmouth conservation Department on various projects on Cape C=d. David is from Arlington, VA
8. Kevi= from Jaredian mentioned that the working drawings should be completed by =he end of
September. They had to have plans modified for proper venting fo= carpenters shop and fertilizer/chemical storage.
9. Daphne gave me a set of drawings that I will review.
<=i style="margin-left:15px">l asked David if he will sign off on project =nd David commented that most
likely after he reviews the plans once more.<=li>
Best,
Leighton
<https://srl.gstatic.corn/ui/vVicons/mail/images/cleardot.gif>
<=iv class="gmail_extra">
2
EFTA_R1_01610926
EFTA02490095
Leighton Allenby
Director of Properties
a=pan>
On Fri, Aug 28, 2015 at 3:54 PM, jeffrey E. =span dir="ltr"><[email protected]
<mailto:[email protected]> wrote:
timline has changed???? I!! why?
<=iv>
On Fri, =ug 28, 2015 at 2:37 PM, LAIlenby <mailto > wrot=:
Drawings by end=of Sept
Leighton Allenby
Director of Properties
<mailto
On Aug =8, 2015, at 2:26 PM, jeffrey E. <[email protected]
<mailto:jeevacation®gmail.co=» wrote:
where are we with all the omar =ids on the timleine , the storm should not have held up =ids ,
same with drawgings for maintenace et.
=div>
=C2 please note
The information contained in this communication =s
confidential, may be attorney-client privileged, may
constitute in=ide information, and is intended only for
the use of the addressee. It =s the property of
JEE
Unauthorized use, disclosure or copying of thi=
communication or any part thereof is strictly prohibited
and may be=unlawful. If you have received this
communication in error, please noti=y us immediately by
return e-mail or by e-mail to [email protected] <mailto:[email protected]> , and
des=roy this communication and all copies thereof,
including all attachment=. copyright -all rights reserved
3
EFTA_R1_01610927
EFTA02490096
please n=te
The information contained in this communication is
confident=al, may be attorney-client privileged, may
constitute inside informatio=, and is intended only for
the use of the addressee. It is the property=of
JEE
Unauthorized use, disclosure or copying of this
communicat=on or any part thereof is strictly prohibited
and may be unlawful. If y=u have received this
communication in error, please notify us immediate=y by
return e-mail or by e-mail to [email protected] <mailto:jeevacation@gmail.=om> , and
destroy this commu=ication and all copies thereof,
including all attachments. copyright -a=l rights reserved
please =ote
The information contained in this communication is confiden=ial, may be attorney-client privileged, may constitute
inside informati=n, and is intended only for the use of the addressee. It is the propert= of JEE Unauthorized use,
disclosure or copying of this communica=ion or any part thereof is strictly prohibited and may be unlawful. If =ou have
received this communication in error, please notify us immediat=ly by return e-mail or by e-mail to
[email protected] <mailto:jeevacation@gmail=com> , and destroy this comm=nication and all copies thereof,
including all attachments. copyright -=11 rights reserved
4
EFTA_R1_01610928
EFTA02490097
ℹ️ Document Details
SHA-256
4e1f702773ae3ba42f3a4a6924152ea38688b64d1b1cab57daf6fd7afcf1feaf
Bates Number
EFTA02490094
Dataset
DataSet-11
Document Type
document
Pages
4